1 LLRF Pre-readiness review (26th May, 2009) 27/10/2015 LLRF performance and its limitation based on KEK's experiments Shin Michizono (KEK) KEK’s LLRF.

Slides:



Advertisements
Similar presentations
1 STF-LLRF system and its study plan Shin MICHIZONO (KEK) LCWS12 STF-LLRF Outline I.STF system configuration S1-Global (~2011 Feb.) Quantum Beam (QB) (2012.
Advertisements

Measurements of adiabatic dual rf capture in the SIS 18 O. Chorniy.
DDC Signal Processing Applied to Beam Phase & Cavity Signals
Synchronization system for CLIC crab cavities Amos Dexter, Ben Woolley, Igor Syratchev. LCWS12, UTA October 2012.
Particle Accelerator Engineering, London, October 2014 Phase Synchronisation Systems Dr A.C. Dexter Overview Accelerator Synchronisation Examples Categories.
Measurements on phase stability at CTF3 Giulio Morpurgo / CERN IWLC 2010.
Test of LLRF at SPARC Marco Bellaveglia INFN – LNF Reporting for:
Laser to RF synchronisation A.Winter, Aachen University and DESY Miniworkshop on XFEL Short Bunch Measurement and Timing.
RF Synchronisation Issues
Capture Cavity 1at A0 SIMCON2.1 with MATLAB  closed loop with max gain ( 250 )  RMS amplitude noise ≈ 0.07%  RMS phase Noise ≈ 0.2°  closed.
EE 198 B Senior Design Project. Spectrum Analyzer.
Status of MicroTCA LLRF Development Zheqiao Geng On behalf of the LLRF AIP team 6/4/2012.
TRF Noise Floor Related Question Prepared by Bill Wu.
HIAPER Cloud Radar Transceiver Exciter Receiver Oscillators High-Powered Amplifier Calibration Exciter Receiver Oscillators High-Powered Amplifier Calibration.
LLRF Phase Reference System The LCLS linac is broken down into 4 separate linac sections. The LCLS injector will reside in an off axis tunnel at the end.
Phase noise measurements in TRIUMF ISAC 2 cryomodule K. Fong, M. Laverty TRIUMF.
Spectrum Analyzer Basics Copyright 2000 Agenda Overview: What is spectrum analysis? What measurements do we make? Theory of Operation: Spectrum analyzer.
Spectrum Analyzer Basics Copyright 2000 Agenda Overview: What is spectrum analysis? What measurements do we make? Theory of Operation: Spectrum analyzer.
Frank Ludwig / Content : 1 Introduction to noise 2 Noise characterization of the actual LLRF system 3 Conceptional improvements 4 Different sensors.
E. KAKO (KEK) 2009' Sept. 30 Albuquerque Global Design Effort 1 Cavity Test Items in S1-G Cryomodule Eiji Kako (KEK, Japan)
LLRF System for Pulsed Linacs (modeling, simulation, design and implementation) Hooman Hassanzadegan ESS, Beam Instrumentation Group 1.
Filters and Delta Sigma Converters
1 BROOKHAVEN SCIENCE ASSOCIATES Plans for Low-Level Radio Frequency Hengjie Ma NSLS II RF Group NSLS-II ASAC Review, March 26, 2009.
1 Results from the 'S1-Global' cryomodule tests at KEK (8-cav. and DRFS operation) Shin MICHIZONO (KEK) LOLB-2 (June, 2011) Outline I. 8-cavity installation.
The PITZ Timing System Frank Tonisch DESY - Zeuthen.
Injection Locked Oscillators Optoelectronic Applications E. Shumakher, J. Lasri, B. Sheinman, G. Eisenstein, D. Ritter Electrical Engineering Dept. TECHNION.
LLRF ILC GDE Meeting Feb.6,2007 Shin Michizono LLRF - Stability requirements and proposed llrf system - Typical rf perturbations - Achieved stability at.
Frank Ludwig, DESY Content : 1 Stability requirements on phase and amplitude 2 Available technologies and selection of the detector concept 3 Proposed.
LLRF-05 Oct.10,20051 Digital LLRF feedback control system for the J-PARC linac Shin MICHIZONO KEK, High Energy Accelerator Research Organization (JAPAN)
1 FNAL SCRF meeting 31/10/2015 Comments from LLRF Shin Michizono (KEK) Brian Chase (FNAL) Stefan Simrock (DESY) LLRF performance under large dead time.
Estimation of IQ vector components of RF field - Theory and implementation M. Grecki, T. Jeżyński, A. Brandt.
Digital Phase Control System for SSRF LINAC C.X. Yin, D.K. Liu, L.Y. Yu SINAP, China
SPECTRUM ANALYZER 9 kHz GHz
Cavities Auto Recovery with Beam RF&Linac Section - ALBA Accelerators Division Francis Perez Angela Salom.
Frank Ludwig, DESY Content : 1 Stability requirements for phase and amplitude for the XFEL 2 Next LLRF system for optimized detector operation 3 Limitations.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser 1 Frank Ludwig, DESY XFEL-LLRF-ATCA Meeting, 3-4 December 2007 Downconverter Cavity Field.
Summary of Booster Dampers Systems Dave McGinnis December 7, 2010.
1 Simulation for power overhead and cavity field estimation Shin Michizono (KEK) Performance (rf power and max. cavity MV/m 24 cav. operation.
1 Linac/400 MeV BPM System Plans and Status Nathan Eddy PIP Meeting 9/7/11.
S. FUKUDA LCPAC RF-Systems for STF S. Fukuda Accelerator Laboratory Content Introduction Status of STF and Plan forFY2006 LLRF Summary.
LCLS LLRF System October 10-13, 2005 LLRF05 B. Hong, R. Akre, A. Hill, D. Kotturi, H. Schwarz SLAC, Stanford, Menlo Park, CA 94025, USA Work supported.
Travis Newton LO-IF Engineer EVLA LO/IF PDR January IF Downconverter Travis Newton LO/IF Engineer.
R.SREEDHARAN  SOLEIL main parameters  Booster and storage ring low level RF system  New digital Booster LLRF system under development  Digital LLRF.
LLRF_05 - CERN, October 10-13, 2005Institute of Electronic Systems Superconductive cavity driving with FPGA controller Tomasz Czarski Warsaw University.
High Power RF Measurements Ben Woolley, Amos Dexter, Igor Syratchev. Jan Kovermann, Joseph Tagg HG2013, Trieste June 2013.
GDE meeting Beijing (Mar.27, 2010) 1 DRFS LLRF system configuration Shin MICHIZONO KEK LLRF lack layout for DRFS DRFS cavity grouping HLRF requirements.
Performance of the cERL LLRF System Takako Miura (KEK) LLRF'15, Shanghai, Nov 4, 2015 (T. Miura) 1 Compact ERL (Energy Recovery LINAC)
LLRF Activities at KEK/J-PARC Zhigao Fang 1 SuperKEKB 2 cERL (compact Energy Recovery Linac) 3 STF (Superconducting RF Test Facility) 4 J-PARC LLRF workshop.
FLASH RF gun developments. Sven Pfeiffer for the LLRF team FEL Seminar Hamburg,
LFB, LLRF, TFB Alessandro Drago Annecy, March 2010.
Design Approaches for the X band LLRF Systems Uros Mavric, XB-10, 2 nd of December 2010, Cockcroft Institute, UK
Matthias Liepe. Matthias Liepe – High loaded Q cavity operation at CU – TTC Topical Meeting on CW-SRF
Possible LLRF Configuration in ILC Sigit Basuki Wibowo LLRF Workshop, Shanghai - Nov 5, 2015.
1 Tuner performance with LLRF control at KEK Shin MICHIZONO (KEK) Dec.07 TTC Beijing (Michizono) S1G (RDR configuration) - Detuning monitor - Tuner control.
MO/LO Performance Summary and Maintenance Plans Tomasz Plawski Jefferson Lab OPS Stay Retreat, July 15th, 2015.
RF Spectrum Analyzer Dong-Yo Jheng 2012/07/12. RF (Radio Frequency) Frequency: 3 kHz ~ 300 GHz 2.
Sub-10 fs RF Regulation at REGAE Matthias Hoffmann for the LLRF team Low Level Radio Frequency Workshop 2015 Shanghai,
Frequency Control through Pulse Width Modulation for NRF Cavities. As example at FLASH RF GUN Sven Pfeiffer for the LLRF team LLRF Workshop 2015 Shanghai,
Electronic workshop for Si-W ECAL 16 – 17 May 2011 Ki-Hyeon Park Pohang Accelerator Laboratory.
LLRF for PXIE Brian Chase For the Project X LLRF Collaboration 1 PX Collaboration Meeting, April 2012 Berkeley - B. Chase.
CI Lecture Series Summer 2010 An Overview of IQ Modulation and Demodulation Techniques for Cavity LLRF Control.
LLRF regulation of CC2 operated at 4˚K Gustavo Cancelo for the AD, TD & CD LLRF team.
LLRF development of SSRF RF Group and Linac Group
Solar Probe Plus – FIELDS Main Electronics Package
Electronic workshop for Si-W ECAL
LLRF Research and Development at STF-KEK
ILC LLRF Status Ruben Carcagno, Brian Chase
RF Synchronisation Issues
Linac Coherent Light Source (LCLS) LLRF Preliminary Design Review LLRF Monitor and Control System September 26, 2005 Ron Akre.
Presentation transcript:

1 LLRF Pre-readiness review (26th May, 2009) 27/10/2015 LLRF performance and its limitation based on KEK's experiments Shin Michizono (KEK) KEK’s LLRF performance Noise analysis Improvements by averaging (or filtering) Algorithm 8/9pi mode Summary

LLRF Pre-readiness review (26th May, 2009) 2 RF 4 vector sum control 0.007%rms 0.018deg.rms 0.01%rms 0.02deg.rms in case of single cavity feedback The performance is similar between 4-vectorsum and single cavity. We analyzed the limitation of the performance 27/10/2015

LLRF Pre-readiness review (26th May, 2009) 3 Possible noise sources [LLRF hardware/software dependent] 1.Digital noise at ADC/FPGA -> Clean 10 MHz input -> Feedback algorithm 2.Phase noise at LO signal (phase jitter) -> Phase noise measurement 3.Clock jitter at ADC -> Phase noise measurement 4. Harmonics at downconverter -> Spectrum measurement [Cavity dependent] 1. 8/9pi, 7/9pi modes elimination 27/10/2015

LLRF Pre-readiness review (26th May, 2009) 4 Clean 10 MHz or downconverted signals were measured at our digital system. ADC data acquisition and FFT analysis Bench test of cPCI system Amplitude [%] Phase [mdeg.] STF 4 vector sum7.00E-0320 single cav.1.00E-0320 clean 10 MHz7.00E-035 Mixer 10 MHz1.50E-0212 FFT spectrum at cPCI (input: clean 10 MHz) -> No spurious observed Phase error is better at clean 10 MHz input. (noise source would be LO or Mixer )

27/10/2015 LLRF Pre-readiness review (26th May, 2009) 5 Digital filter (averaging) Digital low-pass filter is quite effective to improve the signal noise ratio. (M)

27/10/2015 LLRF Pre-readiness review (26th May, 2009) 6 Jitter (10 Hz-1 MHz) is 0.5 m degree. Phase noise measurement [mdeg.] 10MHz0.58 Mixer 10MHz MHz CLK1.81* MO1300MHz16.09 LO1310MHz18.11 *jitter in 10 MHz Jitter (10 Hz-1 MHz) is calculated. Higher jitter of LO would be the dominant factor of the phase error.

27/10/2015 LLRF Pre-readiness review (26th May, 2009) 7 without LPF -56dBc (2 nd ), -66dBc(3 rd Harmonics of downconverter with LPF -73dBc (2 nd ), <-75dBc(3 rd Due to non-linearity, 2 nd and 3 rd should be supperessed <-60dBc.

1.3GHz 1.3GHz+250kHz +1.3GHz (Leakage from LO generator) 0kHz (ADC offset, DC comp. by leakage from LO), 250kHz (IF), 500kHz (2 nd harmonics of IF), … FPGA algorithm (example:250 kHz IF) 27/10/ LLRF Pre-readiness review (26th May, 2009) These errors can be eliminated by the definition of I/Q comp. I’ = ( I - (-I) )/2 Q’ = ( Q - (-Q) )/2 (J-PARC and STF adopted this procedure.)

Feedback-instability due to 8/9  and 7/9  modes L.O. Klystron 400kW AMP. IQ Modulator M. O. ADC DAC I Q LPF (fc=0.4MHz) FPGA 9cell cavity remove LPF A digital delay system (  s/clock) was implemented in the FPGA in order to observe the relation between feedback loop delay and instability. LPF was removed in order to allow other passband modes pass through. FB loop delay was changed using digital delay. Additional delay:1 clock ~ 120 clock(3  s) 9 LLRF Pre-readiness review (26th May, 2009)

Intensities of 8/9 , 7/9  and 6/9  Modes Vec.sum cav4 cav3 cav2 cav1 In the case of P-Gain~55 Additional Delay Time (  s) Stable region is extremely narrow. Stable positions are different from each cavity because of different mode frequencies. by superposition In the case of vectorsum operation, FB control is unstable for all delay time. 27/10/ LLRF Pre-readiness review (26th May, 2009) unstable stable

27/10/2015 LLRF Pre-readiness review (26th May, 2009) 11 KEK’s cavity performance was verified. Phase error (0.02deg. compared with 0.07% in amplitude) comes from the rf signal jitter. The largest part of noises comes from LO jitter. Due to the synchronized noises between 4 cavity pickups, phase errors are almost same even after 4 cavity vector sum. Averaging (digital filter) improves such phase jitter. Harmonics of the mixer should be considered when high stability operation. 8/9pi, 7/9pi instabilities are enhanced at high gain operation. Summary

27/10/2015 LLRF Pre-readiness review (26th May, 2009) 12

Cavity fields and their frequency spectra IF (  mode) 7/9  6/9    8/9  Stable Case : Digital Delay =1clock (0.025  s) Unstable Case : Digital Delay =5clock (0.12  s) Unstable Case : Digital Delay=23clock (0.57  s) cavity Examples of the results for different delay In unstable case, 8/9 , 7/9 , and 6/9  modes were observed. 27/10/ LLRF Pre-readiness review (26th May, 2009)