C/S-band cavity BPMs A. Aryshev (KEK), S. T. Boogert G. Boorman, F. Cullinan, J. Frisch, A. Heo, Y. Honda, J.Y. Huang, S.J. Hwang, N. Joshi,

Slides:



Advertisements
Similar presentations
ATF2: Status Update Glenn Christian (on behalf of FONT group) 10 th ATF Project Meeting.
Advertisements

Update of EXT Stripline BPM Electronics with LCLS-style Digital BPM Processors Glen White, with slides by Steve Smith 15 December 2009 ATF2.
Test of LLRF at SPARC Marco Bellaveglia INFN – LNF Reporting for:
Beam position monitors LCABD Plenary meeting Bristol, 24th March 2009 A. Aryshev, S. T. Boogert, G. Boorman, S. Molloy, N. Joshi JAI at Royal Holloway.
C and S band BPM system update A. Aryshev, S. T. Boogert, S. Molloy, C. Swinson 5/25/20151ATF2 Software meeting.
Preliminary Results from HOM Measurements at the Tesla Test Facility (SLAC) Josef Frisch, Kirsten Hacker, Linda Hendrickson, Justin May, Douglas McCormick,
Ron Johnson Beam Position October 29-31, Beam Position Monitors FAC Review October 29-31, 2007 Stripline BPM.
Beam Loss Analysis Tool for the CTF3 PETS Tank M. Velasco, T. Lefevre, R. Scheidegger, M. Wood, J. Hebden, G. Simpson Northwestern University, Evanston,
Analysis of ATF EXT/FF Orbit Jitter and extrapolation to IP (Data of ) ATF2 Project Meeting K. Kubo.
LLRF Phase Reference System The LCLS linac is broken down into 4 separate linac sections. The LCLS injector will reside in an off axis tunnel at the end.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
IP-BPM NOV. BEAM TEST RESULTS Siwon Jang (KNU). 11cm Low-Q IP-BPM design  11cm Low-Q IP-BPM drawings of HFSS 100mm Sensor cavity Wave guide Antenna Designed.
High Resolution Cavity BPM for ILC final focal system (IP-BPM) ILC2007/LCWS 2007 BDS, 2007/6/1 The University of Tokyo, KEK, Tohoku Gakuin University,
Status of QBPM Electronics and Magnet Movers as of June 3 rd 2008 D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
Status of ATF2 Cavity BPM Project Sep 29, 2005 Project Scope: Instrument both couplers ATF2 cavity BPM’s (35) Produce prototype for December cavity test.
Installation and checkout of QBPM system Hardware to be installed –Install hardware in racks –Install CPU /SIS digitizers/VMIC 3122 analog digitizers/Digital.
FJPPL-FKPPL Workshop on ATF21 FONT digitisation studies of IP BPMs D. Bett, N. Blaskovic, P. Burrows, G. Christian, M. Davis, Y. I. Kim, C. Perry John.
WP9 : Cavity BPM spectrometry Royal Holloway S. Boogert & G. Boorman University College London D. Attree, A. Lyapin, B. Maiheu & M. Wing Cambridge University.
ATF Instrumentation Status and Planning 3 December 2007 Juan Cruz, Justin May, Doug McCormick, Janice Nelson, Tonee Smith, John Wray.
Cavity BPM processing and hardware upgrade plans A. Lyapin, S. Boogert, E. Yamakawa.
Energy Spectrometer for the ILC Alexey Lyapin University College London.
IP-BPM status Siwon Jang KNU. Contents The electronics repair status –Repair work status –Electronics RF test (by using Oscilloscope) –Electronics shipment.
Marc Ross Saturday, June 5, 2004 nanometer BPM status and plans.
1 ATF2 Q BPM electronics Specification (Y. Honda, ) Design System –Hardware layout –Software –Calibration Testing Production schedule ATF2 electronics.
LCLS_II High Rep Rate Operation and Femtosecond Timing J. Frisch 7/22/15.
Results on recent technology developments at ATF - Beam extraction study by a Fast Kicker - N. Terunuma, KEK LER11, Heraklion, Crete, Greece, 2011/Oct/5.
The ATF Damping Ring BPM Upgrade Nathan Eddy, Eliana Gianfelice-Wendt Fermilab for the ATF Damping Ring BPM Team.
FONT Hardware Processing electronics and current beam tests Stephen Molloy Queen Mary, University of London.
Collimator BPM electronics – Results from the lab, SPS and LHC
Philip Burrows ATF2 project meeting 14/1/111 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.
1 ATF Instrumentation Status and Planning Justin May, Juan Cruz, Doug McCormick, Janice Nelson, Tonee Smith, John Wray 1.
Production and Installation Policy of IP-BPM ATF2 Project Meeting, 2006/12/18 Y. Honda, Y. Inoue, T. Hino, T. Nakamura.
Wake Fest 07 - ILC wakefield workshop at SLAC Dec , 2007 Shilun Pei with Chris Adolphsen, Zenghai Li, Karl L. Bane, et al. SLAC, Dec. 12, 2007 TTF.
18 December 2007 ATF Damping Ring BPM System Upgrade Joe Frisch, Justin May, Doug McCormick, Janice Nelson, Tonee Smith, Mark Woodley (SLAC) Charlie Briegel,
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
IPBPM issues (Limitation of resolution) Siwon Jang (KNU)
Superfast BPM Processor Scheme and First Results Stephen Molloy, QMUL 2 nd Mini-Workshop for Nano-Project at ATF.
ATF2 Tuning Summary Nov & Dec 2010 Glen White, SLAC 11 th ATF2 Project Meeting, SLAC Jan
1 ATF 2 Nanobpm (Q BPM) Electronics. Mark Slater: Cambridge Yury Kolomensky, Toyoko Orimoto: UCB Stewart Boogert, Steve Malton, Alexi Liapine: UCL Mike.
SLAC ESA T-474 ILC BPM energy spectrometer prototype Bino Maiheu University College London on behalf of T-474 Vancouver Linear Collider.
ATF DR BPM Upgrade Janice Nelson, Doug McCormick, Justin May, Andrei Seryi, Tonee Smith, Mark Woodley.
ATF2 beam operation status Toshiyuki OKUGI, KEK The 9 th TB&SGC meeting KEK, 3-gokan Seminar Hall 2009/ 12/ 16.
NLC - The Next Linear Collider Project Nano beams in the ATF extraction line Marc Ross Linear collider challenges: Energy Emittance source Stability ATF.
N. BlaskovicFONT Meeting1 ATF November 2013 shift plan N. Blaskovic.
Cavity BPM: Multi-bunch analysis N Joshi, S Boogert, A Lyapin, F. Cullinan, et al. Royal Holloway University of London,
FONT GROUP MEETING ATF JUNE SUMMARY Neven & Talitha Talitha Bromwich - Friday, 26 June 2015.
Low-Q IP BPM Y. I. Kim *, A. Heo, E-S. Kim (KNU) S. T. Boogert (JAI) D. M. McCormick, J. May, J. Nelson, T. Smith, G. R. White (SLAC) Y. Honda, N. Terunuma,
Development of a High Resolution Cavity BPM for the CLIC Main Beam
1 IP FB tests at ATF2 Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford.
High precision phase monitoring Alexandra Andersson, CERN Jonathan Sladen, CERN This work is supported by the Commission of the European Communities under.
IoP HEPP/APP annual meeting 2010 Feedback on Nanosecond Timescales: maintaining luminosity at future linear colliders Ben Constance John Adams Institute,
1 ATF2 Q-BPM Magnet Movers & 1 st Pulse Calibration Progress from May 7-11 J. May, D. McCormick, T.Smith (SLAC) S. Boogert (RH)
RF Phase Reference Distribution for the European XFEL Krzysztof Czuba Warsaw University of Technology, ISE For the RF Synchronization Team P. Jatczak,
LCLS Digital BPM Processor for ATF2 Extraction Line BPMs Steve Smith 26 August 2009.
May 31, 2005Third Mini-Workshop on Nano Project at ATF (M. Ross) Plans for nanometer cavity BPM studies Energy Spectrometer evaluation (Hildreth) Integration.
PHOTOTUBE SCANNING SETUP AT THE UNIVERSITY OF MARYLAND Doug Roberts U of Maryland, College Park.
LEReC BPM Status P. Cernigla, R. Hulsart, R. Michnoff, Z. Sorrell June 2, 2016.
30GHz system improvements Jan Kovermann RF meeting
S-band processing electronics R. Ainsworth (summer student), S. Boogert, G. Boorman (Royal Holloway) A. Lyapine (University College London) Weekly ATF2.
1/33Mikey Davis24 January 2013 Review of 23 rd of January Shift.
Current Status of QBPM Electronics and Magnet Movers D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
1 FONT IP FB Philip Burrows Robert Apsimon, Doug Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Colin Perry John Adams Institute Oxford University.
LCLS_II High Rep Rate Operation and Femtosecond Timing
Glen White, SLAC Jan th ATF2 Project Meeting, KEK
CLIC Workshop 2016: Main Beam Cavity BPM
NanoBPM Status and Multibunch Mark Slater, Cambridge University
N. Terunuma (KEK) ILC2010, Beijing, March 29th, /2/28.
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
SuperB Linac VME Beam Position Monitor
Breakout Session SC3 – Undulator
Presentation transcript:

C/S-band cavity BPMs A. Aryshev (KEK), S. T. Boogert G. Boorman, F. Cullinan, J. Frisch, A. Heo, Y. Honda, J.Y. Huang, S.J. Hwang, N. Joshi, E-S Kim, Y. I. Kim, A. Lyapin, D. McCormick, S. Molloy, J. Nelson, Y.J. Park, S.J. Park,T. Smith,T. Tauchi, N. Terunuma, G. White. SLAC, KNU, PAL, KEK, JAI-RHUL, KEK, ATF osition

Summary of progress C-band Normal resolution with 20 dB 200 nm Best resolution recorded, 20 nm S-band About 1 um (with 15 dB loss in cable) Unstable when DR-RF ramp is on IP Commissioning phase Y resolution ~100 nm (needs good IP steering) Write paper on Hardware and initial results (YI Kim, Lyapin, Boogert)

Introduction Earthquake damage : relatively light Main change to network : made old VME controllers inoperative, unable to boot Hardware Exchanged : MVME167 to MVME3100 Integration of SLAC 16-bit digitisers Software upgrades : Over 40 large upgrades Automatic EDM Each polarisation has own reference, displays, processing, DAQ, etc Measurements and checks 714, C-band, S-band LO and CAL Digitiser noise spectra Analysis Calibration scale errors Multi-bunch

Hardware changes in detail Exchanged : MVME167 to MVME3100 Integration of SLAC 16-bit digitisers C-band CAL tone broken S-band sources, rationalised and checked S-band cables, reorganised due to new IP region shield penetration Checked out Zygo straightness monitor system

SLAC digitisers 16 bit 4 channels 120 MHz internal clock Excellent linearity Problem in impedance Appears to be 1 MOhm

SLAC+SIS digitizers Fully integrated 6 SLAC ADC cards 4 channel 16 Bit Bipolar High linearity Low phase noise (internal clock) Impedance issue....

SLAC impedance check IPY1 : Inserted

SLAC digitiser impedance Diagnostic check list Checked with multimeter (DC measurement) Triggered 25 MHz source Scope test at 50 Ohms Signal looks like it has no reflections Can be avoided in software even for references which have large Q compared with IPBPMs Check TOMORROW

C-band RF distribution 714 Input into RF locking box, generates 100 MHz digitiser clock LO LO has some sidebands Should check at down mixer electronics in tunnel Large amplification 5W

C-band cal tone Only visible damage due to quake Temperature interlock for C-band CAL tone 5W amplifier Fixed! Need to check CAL tone to MPIP (done!)

S-band system digitiser New MVME Channel SIS modules, enough for S-band system Clock and trigger still maybe an issue DR-RF on!!!!!! Propose to internally clock as have spare channels for multiple references now (IP BPMs moved to SLAC digitisers) Install TODAY

S-band signal cables Cut down cables Length reduced by approximately 20 m Attenuation similarly reduced Need for hybrids/amplifiers probably gone Will install hybrids BPMOld attn (dB)New attn (db) SF1FFx14.9 SF1FFy14.4 QF1FFx14.5 QF1FFy14.9 SD0FFx14.6 SD0FFy 14.7 QD0FFx14.7 QD0FFy14.8 REFS114.8 Measure TODAY

S-band sources 8 and 20 GHz Hittite sources LO and CAL tones Source power and frequency stability not such an issue but spectrum is important Need to propagate effect to down- converted signals LO 2kHz span CAL 8GHz 2 MHz span

S-band RF distribution At mixdown electronics LO looks reasonable Completely unlocked from 714 MHz of ATF, why is there such a coherent change in BPM performance (IQ rotation) when DR-RF ramp is switched on

Zygo straightness system from Mike Hildreth Check Laser (ok) VME system (ok-ish) Computers (ok) Laser path needs realignment Preparing for August planned trip by Mike H.

Software changes in detail Main change use to IP region BPMs Previously code used one reference cavity per dipole PAIR Totally automatic system configuration Generates all files (displays included from one master control file) More stable database, rarely have to change main DB configuration even if hardware changes drastically Complete system configuration in database Determine how the BPM system is operating, what is connected, how it is being processed

Automation Completely automatic configuration. Edit signal file and all settings down to hardware, analysis and display changed

Digitiser noise Two types of digitiser Need to understand the effect of digitiser noise on BPM processing Two types of investigation Calibration tone (fit to sine wave) Data taken but need to process Beam off Done, results on right BPMDigitiserNoise [ADU] QD10Xx raw SIS (14 bit) 2.53 QD10Xx pro SIS (14 bit) 0.12 IPAx raw SLAC (16 bit) 7.44 (/4=1.86) IPAx pro SLAC (16 bit) 0.72 (/4=0.18)

Frequency shifts In normal operation often notice temperature shifts Appear as linear phase in down- mixed signal Temperature changes cavity size, hence frequency Need to temperature monitor entire BPM system? Possible? Resolution? Basic : -112 kHz/K Beam pipe kHz/K

t0 resolution Beam arrival time (t0) Substantial jitter and then longer term drifts Phase correction algorithms depend on this number Measured in REFC1 diode detector Linear fit to rising edge of signal Better method? Charge [10^10]t0 RMS [ps] x 10^10 e-

Calibration Errors due to Slow Orbit Drift and Random Beam Jitter Record ~1000 pulses of position measurements Smooth using moving average with flat window of length equal to calibration step length in pulses Fit points separated by window length against positions in calibration scan to determine fractional error on position scale Subtract smoothed signal to leave random jitter Calculate random errors analytically Subtract jitter for BPMs on movers then repeat analysis Frankie Cullinan

Results S/m Frankie Cullinan

23 IQ : Without bunch subtraction Bunch No  (rad) | Δ  | (rad) Rotation Angle: o BPM is moved along Y axis at 200, 100, 0, 0  m positions respectively. o I & Q are calculated in a similar way as single bunch calibration, without any bunch subtraction. o With change in mover position, I&Q from 1 st bunch moves along a straight line in IQ plane passing through (0,0) o Steps along straight lines in IQ plane from 2 nd and 3 rd bunches shows the behaviour expected from a cavity BPM. o IQ signal from a bunch is polluted by the decayed signal from previous bunches. Nirav Joshi

24 IQ : After bunch subtraction Bunch No  (rad) | Δ  | (rad) Rotation Angle: Bunch Subtraction: o i & q signals from BPM and reference cavities are subtracted separately before normalization. o Decayed i & q from previous bunch is subtracted from current bunch. o Subtracted signal is then normalized. o Phase difference between bunches becomes even. Nirav Joshi

Future work Cavity temperature monitoring Monitor temperature by frequency drift Ok for a phase detector but not dipole system Consider installing temperature monitoring on all BPMs Resolution of current system? High charge operation (question from Terunuma- san) Dipole saturation is always a problem Reference saturation is not an option (should not happen) Ordering 5 remote controlled C-band attenuators Understand entire BPM system error budget, statisical and systematic errors etc.

Summary System is working well, compared to pre-earthquake situation Many cases improved Significant software changes Expect some bugs, tried to remove most of them Improved maintainability Continue with pre-quake program Attempt to get high resolution operation for >1 week without calibration