1 Diffused Light from External Benches Internal Meeting on V+MS noise budget, 2 Sept 2009, EGO I.Fiori and E.Tournefier.

Slides:



Advertisements
Similar presentations
ILIAS WG1 meeting - Birmingham1 Cryogenic Trap Vs Brewster window & noise coupling through windows J. Marque.
Advertisements

1 Virgo commissioning progress Post VSR1 plans E. Tournefier STAC meeting June 26 th,2007.
Status of the Virgo Commissioning G.Losurdo – INFN Firenze/Urbino for the Virgo Collaboration.
September 21, 2005Virgo Status – ESF Workshop1 Status of Virgo B. Mours.
Andrea Paoli AdV 1 st Project Review Cascina, November 3 rd, 2008 IME – infrastructure modifications for environmental noise reduction.
IME Andrea Paoli for the IME Subsystem Infrastructure Modifications for Environmental noise reduction IME Internal Review Proposed infrastructure.
Takanori Sekiguchi Italy-Japan Workshop (19 April, 2013) Inverted Pendulum Control for KAGRA Seismic Attenuation System 1 D2, Institute for Cosmic Ray.
Simulation model of Back-scattered light Noise from AdV CryoTrap (deduced from Vinet, Brisson, Braccini article PRD on scattered noise) Case is: light.
Virgo commissioning update - VSR1 first month summary E. Tournefier WG1 meeting, Cascina June 20 th,2007.
F. Frasconi I.N.F.N. Pisa for the Virgo Collaboration TAUP2007 Sendai, September 11-15, 2007 VIRGO EXPERIMENT VIRGO: a large interferometer for Gravitational.
1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.
VSR1 summary - post VSR1 Commissioning plans E. Tournefier (LAPP-CNRS) LSC-Virgo meeting Oct 22 nd, 2007.
rd ILIAS-GW annual general meeting 1 VIRGO Commissioning progress J. Marque (EGO)
LIGO-G9900XX-00-M LIGO R&D1 Gold Coatings in Advanced LIGO Phil Willems.
Stefan Hild, Andreas Freise, Simon Chelkowski University of Birmingham Roland Schilling, Jerome Degallaix AEI Hannover Maddalena Mantovani EGO, Cascina.
1 Virgo commissioning since the end of VSR1 E. Tournefier for the commissioning team ILIAS WG1, Cascina March 5 th,2008.
Virgo Control Noise Reduction
GWADW, May 2012, Hawaii D. Friedrich ICRR, The University of Tokyo K. Agatsuma, S. Sakata, T. Mori, S. Kawamura QRPN Experiment with Suspended 20mg Mirrors.
Optical Configuration Advanced Virgo Review Andreas Freise for the OSD subsystem.
Thoughts on short term improvements for Mirror Suspension Control G.Losurdo - P.Ruggi.
Stefan Hild for the GEO600 team 14th ILIAS WG1 meeting, October 2007, Hannover Mystery noise in GEO600.
GEO‘s experience with Signal Recycling Harald Lück Perugia,
3 May 2011 VESF DA schoolD. Verkindt 1 Didier Verkindt Virgo-LAPP CNRS - Université de Savoie VESF Data Analysis School Data Quality and vetos.
1 Noise sources at high frequency in Virgo E. Tournefier (LAPP-CNRS) ILAS WG1 meeting, Hannover December 12 th,2005 Recycled ITF sensitivities Noise sources.
Gabriele Vajente ILIAS WG1 meeting - Perugia Couplings of angular noises into dark fringe Diffused light studies.
Environmental noise studies at VIRGO Environmental contributions to Virgo readout noise (C-runs) many sources identified through coherency analyses with.
31 May 2006Federico Paoletti Elba GWADW 1 Available traps (short sensors’ list) l Fast monitoring (50Hz < f sample < 20kHz)  vertical high frequency accelerometers.
Experimental tests of SA simulation Irene Fiori – Simulation Workshop – March 18, 2004 Virgo dataSiesta simulation 1. Inertial Damping simulation  test.
1 EIB seismic noise and mitigation I.Fiori, Internal Meeting, 26 August 2009, EGO with E.Genin, F.Frasconi, R.Day, B.Canuel.
Enhanced LIGO with squeezing: Lessons Learned for Advanced LIGO and beyond.
1 Virgo commissioning: Next steps December 12 st 2005 Hannover, ILIAS-GWA WG1 Matteo Barsuglia, LAL/CNRS.
1 Virgo Commissioning progress ILIAS, Nov 13 th 2006 Matteo Barsuglia on behalf of the Commissioning Team.
1 Environmental Noise Studies (May-July’09) I.Fiori, Virgo Week, Commissioning Meeting, 20 July 2009 by The VIRGO Commissioning Team and EGO Vacuum, Electronics,
Pre-stabilized laser (PSL) for AdV Scope of the system Main tasks Requirements Reference solution and status of the design Plans towards completion Technical.
Paolo La Penna Injection optics for Advanced VirgoLSC/VIRGO joint meeting, Cascina, 25/05/ Advanced VIRGO Input optics LIGO-G Z.
External forces from heat links in cryogenic suspensions D1, ICRR, Univ. Tokyo Takanori Sekiguchi GWADW in Hawaii.
Cascina, June 19th, Brewster window noise ? Raffaele Flaminio EGO and CNRS/LAPP Summary - Original observations - Brewster window replacement - New.
B. Canuel – ILIAS WGI meeting 10/07/08 Diffused light Studies Outline... Measures of diffused light performed in the EGO optics lab Mitigation work on.
Nov 3, 2008 Detection System for AdV 1/8 Detection (DET) Subsystem for AdV  Main tasks and requirements for the subsystem  DC readout  Design for: the.
LIGO-G Z The Status of VIRGO E. Tournefier for the Virgo Collaboration GWADW 2004, Aspen From the CITF to VIRGO Commissioning of the Fabry-Perot.
1 LESSONS FROM VIRGO+ May 17th 2010 E. Calloni for the Virgo collaboration.
1 PAY Review Meeting 1 18/3/2009 Piero Rapagnani 18/03/2009.
Virgo+ Commissioning Status. Main upgrades and activities Laser system: from 10  25 watt output power at the IMC TCS: ring + Central Heating Electronics:
The status of VIRGO Edwige Tournefier (LAPP-Annecy ) for the VIRGO Collaboration HEP2005, 21st- 27th July 2005 The VIRGO experiment and detection of.
1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.
MSC winter, short-term schedule Commissioning meeting Cascina 2 Oct 2006.
The control of the Virgo Superattenuator: present and future Giovanni Losurdo - INFN Firenze/Urbino on behalf of the Virgo Collaboration.
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, July 2004 VIRGO commissioning progress report.
M. Mantovani ILIAS Cascina March 2008 Automatic Alignment system Improvements after the VSR1 M. Mantovani for the Alignment team.
Status of LIGO Andri M. Gretarsson Livingston Observatory LIGO-G L.
Status of Virgo a short update Michele Punturo. A bit of History July 29 – August –C6 run Duty cycle: Locking 89%, Science Mode 86% September.
The road to 10 dB Kate Dooley, Emil Schreiber GWADW, Girdwood, May LIGO-G
External forces from heat links in cryogenic suspensions D1, ICRR, Univ. Tokyo Takanori Sekiguchi.
1 DC readout for Virgo+? E. Tournefier WG1 meeting, Hannover January 23 rd,2007 DC vs AC readout: technical noises Output mode cleaner for DC readout.
Electron Spectrometer: Status July 14 Simon Jolly, Lawrence Deacon 1 st July 2014.
Sensitivity of Virgo E. Tournefier (LAPP-CNRS) LSC-Virgo week May 23 rd,2007 LIGO-G Z.
The VIRGO detection system
40m Optical Systems & Sensing DRD, G R 1 40m Optical Systems and Sensing Design Requirements Document & Conceptual Design Michael Smith 10/18/01.
Edwige Tournefier for the Virgo Collaboration The status of Virgo.
§8.4 SHG Inside the Laser Resonator
A look at interferometer topologies that use reflection gratings
Squeezing in Gravitational Wave Detectors
Quantum noise reduction using squeezed states in LIGO
Back-scattered light noise in Virgo 2nd Science Run data
Reaching the Advanced LIGO Detector Design Sensitivity
Present Superattenuator performance vs. ET Requirements S
External forces from heat links in cryogenic suspensions
Estimation of each loop shot noise limit for AdLIGO
Some ideas on advanced Virgo Twins A. Giazotto-INFN Pisa
Status at the Prague meeting
Presentation transcript:

1 Diffused Light from External Benches Internal Meeting on V+MS noise budget, 2 Sept 2009, EGO I.Fiori and E.Tournefier

Noise model 2  δx opt (t) = displacement of scattering surface (optics and bench in this case) along ITF optical axis Phase noise carried by back-scattered field General formula, for phase noise into ITF from a back-scattered field: In note VIR-007A-8, Edwige derives K as function of ITF parameters and expected  f sc on benches from measured BRDF, then compares to measured G.  End Benches and EDB diffused light path seems understood, EIB is not yet. Tentative Projections for V+MS: >>> using parametrized K we can predict how G rescales for V+MS >>> Check Microseism.  K = “Coupling factor” which depends on ITF port.  f sc = Fraction of light power carried by back-scattered beam

NEB 3 Present: G=1.8E-21 (measured) (G includes  f sc reduction due to new tower window and mir AR coating, which is about a factor 2) T=10ppm, F=50 V+MS: T = 5ppm, F = 150,  f sc same  Gnew = G/sqrt(3)/2 = 0.5E-21 Mitigations: 1) Reduce 18Hz bump >> Mech-damper, and HVAC flux reduction 2) 45Hz bump is the turbo pump fan >> fan seismic isolation. Case of low microseism Factor 10 safe margin Confident in this formula because predicted K agrees with measured (VIR-007A-08)

WEB 4 Present: G=20E-21 (measured) T=40ppm, F=50 V+MS: assume Gnew is same as NEB (assume same improvement associated to tower window and mir AR coating) Mitigations: 1)turbo pump fan seismic isolation. Case of low microseism

Microseism Statistics over 1 year 5 x-axis= RMS 0.2-1Hz of WE Lvdt, in  m On y-axis is the percent of time this RMS is above a given x value Low microseism (case of prev. plots): RMS<0.5micron = 60% High microseism (like July 7, or worst): RMS > 3 microns = 3%

Microseism High microseism July 7, VSR2 start, (RMS 0.2-1Hz WE Lvdt = 3microns) 6 NEB ok, WEB is at design. WEB is worst because microseism is (always) twice stronger at WE than at NE, because of more proximity to sea WE (  15km), NE and CB (18km) Do we accept this? Possible actions:  Go to T=2ppm (gain factor 2) Feasible?  Further reduce  f sc ? Lentone maybe. Measure its scattering

EDB 7 Case of low microseism Suspect (tappings, check on measured K ) major contribution is from B1s and B5 (B1p has small power) B5 coupling scales with 1/F B1 coupling does not scale Mitigations: 1) send a small fraction (1%?) of B1s on EDB (  reduction of B1s diffused light by a factor 100) and dump the rest inside the tower. For that we need a high power beam dump. 2) move the Faraday isolator before the OMC in order to filter B1s diffused light (gain at least a factor 100) 3) Reduce EDB motion. Mech damper? (...not efficient). Isolation with sorbothane, damped springs? Conservative Projection assuming NO RESCALING of G (measured G=1 E-20, in March)

EIB 8 Case of low microseism Projected UPPER LIMIT: Major contrubution is upconv. of 18Hz (bench mode, and HVAC line) Mitigations: > 18Hz with Mech damper > anyhow seismic isolation of EIB seems required to mitigate beam jitter, solutions under study. Diffused light path not understood, Back reflection from ITF do not explain measured G (old INJ) With new injection G reduced by > 10 times, suspect better isolation of FI or reduced scattering on bench Conservative Projection assuming NO RESCALING of G (measured G<1 E-21)