Item 8, Technical Advisory Committee Meeting April 8, 2010.

Slides:



Advertisements
Similar presentations
October 7, 2013 QMWG Ancillary Services Methodology Changes Bill Blevins Manager, Operations Planning.
Advertisements

INSULATING PRICE RESPONSIVE LOAD FROM RUC CAPACITY SHORT CHARGE Mark W. Smith J. Kay Trostle August 2008 DSWG.
TNT Commercial Operations Working Meeting Betty Day, Kenneth Ragsdale, BJ Flowers April 6&7, 2004.
QSE Managers Working Group Meeting Notes 9 April, 2010 Report to WMS 21 April, 2010 David Detelich - Chairperson.
NPRR 336, Authorize ERCOT to Procure Additional RRS During Severe Cold Weather Consideration of Tenaska and Luminant Comments.
FAST Procurement and Pricing May 28, 2015 TAC Meeting 1.
Protocol Revision Subcommittee Sandy Morris August 5, 2010.
QSE Managers Working Group Meeting Notes 3 February, 2010 Report to WMS 17 February, 2010 David Detelich - Chairperson.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
7/15/2013 CSWG CSWG – ERCOT Update ERCOT Matthew Tozer.
RTWG Report to TAC August 5, 2010 Howard Daniels.
COMMUNICATIONS AND SETTLEMENTS WORKING GROUP (CSWG) April 2015 Update to COPS.
2011 Project Prioritization Troy Anderson ERCOT Program Management Office April 2010.
1 Settlement Changes R5 (SEP 2015) and R5.5 (OCT 2015) Blake Holt ERCOT COPS 9/14/2015.
August 17, 2011 Reliability Deployments Task Force Meeting Updated Analysis of Non-Spin Deployments and RUC John Dumas Director Wholesale Market Operations.
Report to TAC February In Brief Chair and Vice-Chair for 2009 Chair and Vice-Chair for 2009 Working Group Reports Working Group Reports QMWG QMWG.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee April 8, 2010.
1 WMS Report To TAC September In Brief Four Working Group Reports Four Working Group Reports One Task Force Report One Task Force Report Three.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee March 4, 2010.
1Texas Nodal Texas Nodal Commercial Systems COMS CSD Presentation By ERCOT Wednesday, 1/10/2007.
PRS - RPRS Task Force Status Summary - August 14, PRS RPRS Task Force Status Summary Prepared for WMS and PRS August 2006.
E x p e r i e n c e C o m m i t m e n t SM ERCOT Nodal – Fuel Cost Analysis Verifiable Cost Working Group October 6, 2008.
RPRS ERCOT System Wide Insufficiency Charge Presented at the Technical Advisory Committee June 1, 2006.
Demand Side Working Group Chairman Slides June 27, 2008 Mary Anne Brelinsky Vice President 1.
NPRRs NPRR 681 Clarifications to Dynamic Ratings. This Nodal Protocol Revision Request (NPRR) adds clarification for Dynamic Ratings provided via ICCP.
December 18, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott January 6, 2015 TAC Update to RMS 1.
Nodal ATF 1 Nodal Advisory Task Force Update for TAC September 2 nd, 2010.
Item 5: PRS Report John Varnell 2014 PRS Chair Technical Advisory Committee (TAC) Meeting ERCOT Public August 28, 2014.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee June 3, 2010.
ERCOT Nodal Readiness Plan Trip Doggett TAC Special Meeting September 7, 2005.
March 27, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott April 1, 2014 TAC Update to RMS 1.
1 WMS Report To TAC May In Brief One Working Group Reports One Working Group Reports Two Task Force Reports Two Task Force Reports One Staff report.
Lead from the front Texas Nodal 1 TPTF Update for TAC March 30, 2007 Trip Doggett.
RPRS TF and QSE Managers Report to PRS 1)Procurement (QSE Managers) 2)Cost Allocation (RPRS Task Force) –PRR 674 –PRR 676 –PRR 678.
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
Load Resources Negative RRS Bidding in the Nodal Market Credit Working Group January 30, 2008.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 8, 2008.
Protocol Revision Subcommittee Tom Burke September 7, 2012.
QMWG Update to WMS S. Looney October 9, WMS Assignments NPRR564, Thirty-Minute Emergency Response Service – Discuss concerns expressed at last WMS.
ERCOT CWG/MCWG April 24, 2013 DAM Credit Parameters.
MISUG Meeting Materials ERCOT 9/07/ MISUG Agenda 9/07/ Antitrust AdmonitionJ. Lavas9:30 a.m. 2.IntroductionJ. Lavas9:35 a.m. 3. Follow up.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee November 2, 2006.
SAWG Update to WMS September 2 nd, 2015 Brandon Whittle.
Ancillary Services Methodology Changes Bill Blevins Manager, Operations Planning.
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
NPRR680 background concept Carrie Bivens Manager, Day-Ahead Market PRS February 12, 2015.
ROS Report Bill Hatfield 2014 ROS Chair Technical Advisory Committee (TAC) Meeting ERCOT Public June 26, 2014 TAC Meeting.
NPRR 649 Addressing Issues Surrounding High Dispatch Limit (HDL) Overrides Katie Coleman for Air Liquide (Industrial Consumer) ERCOT Board February 9,
December 2010 Wholesale Market Subcommittee Report to Technical Advisory Committee.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee September 3, 2009.
QSE Managers Working Group Meeting Notes November 10, 2009 Report to WMS November 18, 2009 Jennifer Troutman – Vice Chair.
1 Project Prioritization Review May 14, Approved Revision Requests “Not Started” – Planned to Start in Future Months Revision Request Target Start.
June 26 and July 31, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott August 5, 2014 TAC Update to RMS 1.
11/3/2011 Technical Advisory Committee TAC Update Kyle Patrick.
RCWG Update to WMS March 7, Draft NPRR, Caps and Floors for Energy Storage Resources Chair of ETWG gave high level overview ERCOT had questions.
Presentation to the ERCOT Technical Advisory Committee July 1, 2010.
The Wholesale Market Subcommittee Update Prepared for the July 31st TAC meeting.
Protocol Revision Subcommittee Sandy Morris May 5, 2011.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 7, 2009.
MISUG Meeting Materials ERCOT 7/26/ MISUG Agenda 1.Antitrust AdmonitionJ. Lavas9:30 a.m. 2.IntroductionsJ. Lavas9:30 a.m. 3.Market Data Transparency.
Technical Advisory Committee Commercial Operations Subcommittee Update to TAC Debbie McKeever COPs Chair 2011.
CRR Deration and NPRR821 WMS 09/06/2017.
Protocol Revision Subcommittee
NPRRs 815NPRR Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service.  This Nodal Protocol Revision Request (NPRR) revises.
Ancillary Service Trades and Ancillary Service Settlement
Settlement Update Austin Rosel ERCOT October 11, 2017.
Real-Time Co-optimization of Energy & Ancillary Services
A Midsummer Night’s DREAM
NPRR829 Incorporate Real-Time Telemetered Net Generation for Non-Modeled Generation into the Real-Time Liability Estimate ERCOT PRS Meeting May 11, 2017.
Sandip Sharma ERCOT Manager, Operations Planning
Presentation transcript:

Item 8, Technical Advisory Committee Meeting April 8, 2010

 The P80 forecast is included in the original Nodal Protocols ◦ Deliberately under-forecasts wind ◦ Could cause ERCOT to overcommit during the DARUC process  This NPRR would revise that to the P50 ◦ Should more accurately predict wind output ◦ Should drive RUC process to better commit resources  Sounds great right?

 The capacity that is allocated to wind resources for RUC coverage is based on whichever forecast is used  DARUC does not modify this charge regardless of wind performance ◦ So if P50 shows 100MWs for a given farm and actual production is 20MWs, there is no allocation of DARUC if the WGR sold 100MWs of capacity service to the market  By definition the WGR will only provide the reliability service 50% of the time!!!  There are considerable penalties for providing this level of service (or lack thereof) on all other ancillary services  Conventional generators are charged RUC if there capacity is reduced in RT due to unit trips or derates  So while this should be enough to reconsider implementation of the NPRR there are other consequences

 Ideally the incentives would exist to for loads to hedge their risk in the Day Ahead Market and not carry it to real time  This allows for a much more efficient commitment  If this does not occur, ERCOT will be forced to RUC units on line to support local and ERCOT wide shortfalls  Overallocating capacity coverage to wind generators enhances this problem ◦ WGRs will now be able to sell additional capacity as RUC coverage to loads ◦ There is no tie between where the capacity is provided and where RUC is needed, so the load is not at risk ◦ ERCOT is then left to RUC the needed units on line ◦ At settlement, the load is covered from a RUC standpoint leaving the RUC charge to be uplifted to load as a whole ◦ When the market reaches “steady state”, to the extent RUC is procured, the WGRs will be collecting an uplift related to that charge

Capacity needed here Capacity “supplied” here Capacity is needed in HLZ A 500 MW load (1%) opts to cover their HLZ load with WGR capacity instead of DAM purchase ERCOT strikes 500MWs of capacity in Houston to cover the shortfall (note that RUC likely does not select the most efficient units to start) Costs are now uplifted marketwide and the 500 MW load only picks up 1% of that cost

 Morgan Stanley’s comments to this NPRR remove the use of the P80 or 50 forecast for DARUC  Original use of the method was an inadequate compromise meted out in the early stages of nodal development (Omni basement TNT days)  The MS changes place WGRs on the same footing as conventional generators ◦ They can sell what they feel comfortable they will provide in real time ◦ If the wind isn’t there, they must pay for the RUC capacity they sold (just like a unit trip)  Method does require a fairly simple system change, so wouldn’t be available at go live but could be included with other RUC changes if any were needed

 TAC should in some way incorporate the changes created by the MS comments ◦ The move to the P50 forecast could also be delayed until implementation of these changes ◦ ERCOT has committed to using the bias offset method found in the current ancillary services procedures document to curb overcommitment of RUC resources in the mean time