1Texas Nodal Market Trials Update. 2Texas Nodal Full System Market and Reliability Test 24-Hour Test Observations Duration of Test for Week of 8/16 168-Hour.

Slides:



Advertisements
Similar presentations
1 Market Trials Outage Scheduling Qualifications Weekly Update February 18, 2010.
Advertisements

IMPACT TO FREQUENCY CONTROL DURING STARTUP AND SHUT DOWN OF UNITS
Lead from the front Texas Nodal 1 EDS 3 Release 5 and 6 Friday Market Updates Aug 08, 2008.
1 Market Trials Open Market Participant Call Weekly Kick Off November 15, 2010.
1 Market Trials Open Market Participant Call Weekly Kick Off Aug 16, 2010.
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
1 Nodal Stabilization Market Call December 28, 2010.
1 TSP Nodal Engagement Market Participant Call ERCOT August 04, 2010.
Lead from the front Texas Nodal Version EDS 3 R6.3 8 Focused Input Test (FIT) II Web Ex Texas Nodal Load Frequency Control.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Requirement Documents November 7, 2006 Sai Moorty MMS Project.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
Demand Side Working Group Load Resource Performance Subgroup April 9, 2010 Mary Anne Brelinsky EDF Trading North America.
1 Market Trials Outage Scheduling Weekly Update July 09, 2010.
Lead from the front Texas Nodal 1 EDS 3 Release 5 Monday / Friday Market Updates November 30, 2007.
April, 2008 Maximum Shadow Price. April, 2008 Protocol Requirement: Transmission Constraint Management (2)ERCOT shall establish a maximum Shadow.
Lead from the front Texas Nodal 1 Texas Nodal Load Frequency Control (LFC) EDS 3 Release 6 - Handbook EDS 3 Release 6 MP Planning.
1 Market Trials Open Market Participant Call Weekly Kick Off October 04, 2010.
Texas Nodal 1 Nodal Operations Model Posting Confirmation TAC May 7, 2009 Matt Mereness, ERCOT.
Lead from the front Texas Nodal 1 EDS 3 Release 5 Monday / Friday Market Updates April 18, 2008.
Presentation to House Regulated Industries Committee Chairman Phil King Trip Doggett Chief Operating Officer The Electric Reliability Council of Texas.
1Texas Nodal Market Trials Update. 2Texas Nodal LFC Testing Review Review of materials presented at TAC Changes in Market Trials schedule and activities.
1 Nodal Stabilization Market Call December 06, :30 AM.
1 Market Trials Real-Time Market / LFC Weekly Update April 9, 2010.
Lead from the front Texas Nodal 1 EDS 3 R6.2 Testing Overview Texas Nodal Load Frequency Control (LFC) EDS 3 Release 6 LFC WebEx.
1 Market Trials Update NATF June 1, 2010.
Nodal ATF 1 Nodal Advisory Task Force Update for TAC November 4 th, 2010.
Nodal ATF 1 Nodal Advisory Task Force Update for TAC September 2 nd, 2010.
Nodal Program Update Technical Advisory Committee 4 November 2010.
1 Cutover Market Call November 29, :00 AM.
RCWG Update to WMS July 11, Alternatives to Address Negative Prices At its June meeting, WMS directed RCWG to bring back something to vote on. RCWG.
January 21, 2008 TPTF 168 Hour Test Initial Approach Discussion.
July 10, 2008 ROS Early Delivery Systems Status – R6.3 2 Hour Test John Dumas and Jeff Gilbertson.
Outage Scheduler Transition Plan Kenneth Ragsdale NATF.
February 5, 2008 TPTF 168 Hour Test Follow up discussion.
N ODAL P ROGRAM U PDATE TO C OPS Jim Galvin.
1 Market Trials Real-Time Market / LFC Weekly Update July 30, 2010.
Lead from the front Texas Nodal 1 EDS 3 Release 5 Monday / Friday Market Updates Feb 01, 2008.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Load Frequency Control (LFC) Business Requirements Energy.
CMWG NATF 11/02/2010- CCT/DME update + Outages in the CRR Model follow-up Steve Reedy – Market Design and Analysis 1.
1 Market Trials Real-Time Market / LFC Weekly Update August 6, 2010.
1 Market Trials Update NATF May 4, 2010.
Commercial Operations Subcommittee Meeting April 13, 2010 Update to RMS April 14, 2010.
1 Cutover Market Call November 27, 2010.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee October 1, 2009.
Cutover Update NATF 2 November Today’s Agenda Reminders Program Status 24 Hour LFC Test Update Cutover Update Soft Launch 2 November 2010NATF.
Texas Nodal 1 Nodal Operations Model Posting NATF Sep 29, 2009 Matt Mereness, ERCOT.
1 Nodal Stabilization Market Call December 27, 2010.
PDCWG Report to ROS January 13, 2011 Sydney Niemeyer.
1 Market Trials 168-Hour Test Daily Update Meeting Sept 15, 2010.
December 2010 Wholesale Market Subcommittee Report to Technical Advisory Committee.
1 Market Trials Open Market Participant Call Weekly Kick Off Aug 09, 2010.
Analysis for the Determination of X, Y, and Z for Compliance Monitoring NATF.
1 Market Trials Open Market Participant Call Weekly Kick Off May 10, 2010.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
Retail Workshop ERCOT Nodal Update October 06, 2010.
1Texas Nodal NATF Readiness Update Vikki Gates May 4, 2010.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Update on TPTF Comments on MMS Clarification Notes May 21,
1 Market Trials Update NATF January 5, 2010.
Congestion Management Work Group 2008 Overview CMWG Marguerite Wagner, Reliant Energy Inc.
Lead from the front Texas Nodal 1 Texas Nodal Energy & Market Management System EMS/MMS Projects Requirement Documents November.
1 Market Trials Real-Time Market / LFC Weekly Update August 27, 2010.
February 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 3, 2015 TAC Update to RMS 1.
WRUC – Long Lead Time Commitments QSE Manager’s Working Group ERCOT Operations March 23, 2016.
TAC Update Kyle Patrick. 2 Nodal ERCOT Program Update –Nodal Market Go-Live (Vote)- vote passed in which TAC certified full nodal systems for Dec 1, 2010.
August 11, 2008 TPTF EDS Sequence and Durations Discussion Daryl Cote.
Market Trials Update NATF March 2,
Nodal Program Update to Cops
Cutover Market Call November 29, :30 PM
Texas Nodal Load Frequency Control (LFC) EDS 3 R6
Market Trials Open Market Participant Call
Presentation transcript:

1Texas Nodal Market Trials Update

2Texas Nodal Full System Market and Reliability Test 24-Hour Test Observations Duration of Test for Week of 8/ Hour Preparations for TAC / Board Action Items from Last Meeting TAC Feedback / Revisit Conclusions Agenda

3Texas Nodal Today’s objectives: 1)Agree on format and duration of the next Full System Market and Reliability Test during the week of 8/16/2010 2)Agree on the format of the 168-Hour Test Objectives

4Texas Nodal Full System Market and Reliability Test

Full System Market and Reliability Test: 24-Hour Test Observations Issues and Observations from the test Total of 19 constraints activated, 7 at one time during the test QSEs released from AS obligations –2 instances where QSEs were released from their Regulation Obligation to make resources available to SCED to resolve congestion. –This was the correct Operator action. Not previously observed during a closed loop test. CPS1 score of -34 –Primarily due to resources being off of their expected generation (HE 17) –Resources were also having equipment problems and did not reflect those changes in telemetry. –Time Error Correction was also being performed during this time. –For some intervals, ERCOT Operations responded with a manual offset in SCED. 5

Full System Market and Reliability Test: 24-Hour Test Observations Issues and Observations from the test Quick Starts coming on or offline –For testing purposes QSEs will need to call the ERCOT Operators before coming on or going offline. Energy constraints superseding transmission constraints –Occurred during the peak load intervals. Telemetry Inconsistencies –Cases where HSLs were being set lower than MWs. –QSEs were not using the “ONTEST” resource status as expected. Some resources were testing and not using this status. There were also resources which were using this status who were not testing. 6

Full System Market and Reliability Test: 24-Hour Test Observations Issues and Observations from the test Ramping down of resources to take them offline –A number of resources were off their expected generation which negatively affected ERCOT’s ability to manage frequency. –More guidance for ramp-offs and start-ups will be provided on the 8/13 RTM Market Call. Shift Factors being sent to SCED –Issue #1 - 3 intervals with shift factors not sent to SCED (1815, 1835 and 1850). This is a known issue and the fix is planned to be implemented before the next full system test. –Issue #2 – For specific constraints with unresolved contingencies, shift factors were not passed. Vendor is working on an emergency patch. 7

Full System Market and Reliability Test: 24-Hour Test Observations Overview – Completion Criteria ERCOT will communicate an initial assessment of the following completion criteria upon conclusion of the test on August 5 th : –The rolling CPS1 one minute average score must equal or exceed 100% during the test period Note that the CPS1 average will not take into account the periods where ERCOT is transitioning to Nodal and then back to Zonal Note that the CPS1 average will not take into account the periods where ERCOT is performing system tuning –Hourly CPS1 Scores: »Max: 167, Min: -34, »Average: 130 (137 when HE is removed) –Zonal Commercially Significant Constraints (CSCs) and Closely Related Elements (CREs) managed below thermal limits. None active –Local Congestion managed below thermal limits Yes –Stability limits managed below transfer limits None active –No NERC Disturbance Control Standard (DCS) failure if applicable. No DCS failures during the test –No LFC-SCED system issues that result in termination of the test. No LFC / SCED failures –Procedural and software fixes have been verified to address lessons learned from previous rounds of testing. All software fixes put in prior to the test worked as expected.

Full System Market and Reliability Test: 24-Hour Test Observations Summary of Martket Participant Issues: Transitioning to Nodal prior to ERCOT Control Room instructing to do so Going on-line / off-line Quick start units General telemetry issues Incorrect limits after de-rating Ancillary Services inconsistent with Zonal responsibility Resource Status Codes Incorrect –ONTEST status used in appropriately –Offline status code while generating Using Output Schedule Offer curves not extending to unit’s capability Wrong CC configuration number telemetered

Full System Market and Reliability Test: Next Test Test to Occur the Week of 8/16 – Considerations from the 24-Hour Test –Issues during Ramp-Down into the evening hours –Issues during Ramp-Up (not as notable as Ramp-Down) –Much was learned during the on-peak hours (e.g. contingencies –Have not yet tested during weekend –ERCOT proposes the following: Thursday 8/19/2010: Troubleshooting period and Market Notice to occur 10am – 1pm Thursday 8/19/2010: Cutover to Nodal start 1pm completing at 2pm Friday 8/20/2010: Cutover back to Zonal to begin at 12am Friday 8/20/2010: Cutover to Zonal complete by 1am Total test duration: 12 hours on Nodal systems (including transition hours) This provides testing during peak and ramp-down

11Texas Nodal 168-Hour Test Review

12Texas Nodal ERCOT to incorporate Exit Criteria into Handbook ERCOT to revise logistics of the test to allow flexibility on duration and closed vs. open loop testing Logistics were to be locked in at NATF on 8/19/2010 session Status: ERCOT is prepared to publish a revised 168-Hour Handbook this evening based on today’s NATF discussion today This will be forwarded to the TAC TAC is scheduled to vote on the 168-Hour Test Methodology (Handbook) this Thursday 168-Hour Test: Action Items from Last Meeting

13Texas Nodal Proposed Start Date – 9/8 168-Hour Test: TAC Feedback / Revisit Conclusions SundayMondayTuesdayWednesdayThursdayFridaySaturday DAM HRUC DRUC WRUC Settlements Credit DAM HRUC DRUC WRUC Settlements Credit Transition to Nodal 2pm – begin closed loop test DAM HRUC DRUC WRUC Settlements Credit Continue closed loop test DAM HRUC DRUC WRUC Settlements Credit Transition to Zonal 2pm DAM HRUC DRUC WRUC Settlements Credit DAM HRUC DRUC WRUC Settlements Credit DAM HRUC DRUC WRUC Settlements Credit DAM HRUC DRUC WRUC Settlements Credit Evaluate Completion Criteria – Special NATF Determine next testing step

14Texas Nodal Open Discussion