Presented by Brad Nelson Tom Brown, Mike Cole, Paul Fogarty, Paul Goranson, Phil Heitzenroeder, Wayne Reiersen, Dave Williamson, and others NCSX PAC Meeting.

Slides:



Advertisements
Similar presentations
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Advertisements

First Wall Heat Loads Mike Ulrickson November 15, 2014.
NCSX Vacuum Vessel Overview Paul Goranson WBS 12 Manager Vacuum Vessel Manufacturing Study Kickoff meeting April 29, 2003.
WBS3 Diagnostics Planning Update Presented by B. Stratton with input from T. Brown, M. Cole, E. Fredrickson, R. Feder, P. Goranson, L. Guttadora, D. Johnson,
Physics of fusion power Lecture 14: Anomalous transport / ITER.
January 8-10, 2003/ARR 1 Plan for Engineering Study of ARIES-CS Presented by A. R. Raffray University of California, San Diego ARIES Meeting UCSD San.
NSTX Center Stack Upgrade Workshop Brainstorming on Design Solutions for TF Joint C Neumeyer Jan 22, 2009.
September 3-4, 2003/ARR 1 Initial Assessment of Maintenance Scheme for 2- Field Period Configuration A. R. Raffray X. Wang University of California, San.
1 Configuration Development for HIF Final Focus Superconducting Quadrupole Array HIF Final Focus Meeting July 2, 2002 Tom Brown Chang Jun Phil Heitzenroeder.
Update of the ARIES-CS Power Core Configuration and Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray and the ARIES Team ARIES.
Magnet System Definition L. Bromberg P. Titus MIT Plasma Science and Fusion Center ARIES meeting November 4-5, 2004.
Hutch Neilson NCSX Project Manager Princeton Plasma Physics Laboratory Oak Ridge National Laboratory NCSX Research Forum #1 Princeton Plasma Physics Laboratory.
ARIES Review, PPPL L. M. Waganer, 4-5 Oct 2006 Summary of Low Cost Fabrication of Integrated Coil Structure L. M. Waganer With Support from Kevin Slattery.
The shield block is a modular system made up of austenitic steel SS316 LN-IG whose main function is to provide thermal and nuclear shielding of outer components.
Status of the Power Core Configuration Based on Modular Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray and the ARIES Team ARIES.
Status of the Coil Structure Design and Magnetic-Structural Analysis Presented by X.R. Wang Contributors: UCSD: S. Malang, A.R. Raffray PPPL: H.M. Fan.
ARIES-Stellerator studies Magnet issues L. Bromberg P. Titus MIT Plasma Science and Fusion Center Cambridge MA May 7, 2003.
ARIES Meeting, UCSD L. M. Waganer, June 2006 An Approach for Low Cost Fabrication of the Coil Structure L. M. Waganer With Support from Kevin Slattery.
The main function of the divertor is minimizing the helium and impurity content in the plasma as well as exhausting part of the plasma thermal power. The.
March 20-21, 2000ARIES-AT Blanket and Divertor Design, ARIES Project Meeting/ARR Status ARIES-AT Blanket and Divertor Design The ARIES Team Presented.
Review of the mechanical design of the final focusing region of the HIF Point Design T. Brown ARIES Project Meeting January 8, 2003.
NCSX Office of Science Project Review Cryostat, WBS171 August 15-17, 2007 NCSX Fabrication, Operations, and Maintenance Division Engineering Department.
Progress on the MuCool and MICE Coupling Coils * L. Wang a, X. K Liu a, F. Y. Xu a, A. B. Chen a, H. Pan a, H. Wu a, X. L. Guo a, S. X Zheng a, D. Summers.
pkm- NCSX CDR, 5/21-23/ Power and Particle Handling in NCSX Peter Mioduszewski 1 for the NCSX Boundary Group: for the NCSX Boundary Group: M. Fenstermacher.
ASIPP EAST Overview Of The EAST In Vessel Components Upgraded Presented by Damao Yao.
NCSX Vacuum Vessel Joint Design Mike Viola PPPL July 1 st, 2003.
NSTX CSU Preliminary Assessment of PFCs Art Brooks December 8,
NSTX Center Stack Upgrade Workshop Requirements & Design Point C Neumeyer Jan 22, 2009.
ARIES AT Project Meeting - Princeton, NJ 18 Sept 00 1 ARIES-AT Toroidal Field (TF) and Poloidal Field (PF) Coils Tom Brown, Fred Dahlgren, Phil Heitzenroeder.
1 NCSX Modular coil winding pack To shim or not to shim? NCSX WBS 1 Engineering Meeting July 7, 2004 What is requirement? What is baseline winding pack.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
1 WBS 1 Design Analysis Status NCSX Analysis Meeting Dec 3, 2003.
Defining the Vacuum Vessel Geometry NCSX Project Meeting November 27, 2002 Art Brooks.
NCSX A. Brooks, P. Fogarty, G. Lovett, D. Williamson June 3, 2005 Modular Coil Type-C Final Design Review – Part II.
NCSX VACUUM VESSEL PL Goranson Thermal Insulation Final Design Review July 31, 2006 WBS12 NCSX.
Metrology Milestones Metrology Task Force –Vacuum vessel manufacture - P. Goranson –Mod. Coil Form manufacture - D. Williamson –Mod. Coil winding- S. Raftopoulos.
Conceptual Design Requirements for FIRE John A. Schmidt FIRE PVR March 31, 2004.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
Cold Magnetic Shield Update
NCSX VACUUM VESSEL HEATING/COOLING PL Goranson Preliminary Results February 17, 2006 MDL Testing of Coolant Tracing NCSX.
NCSX David Johnson August 18, 2004 Discussion of Co-Wound Flux Loops.
ARIES-CS Power Core Configuration Presented by X.R. Wang Contributors: Laila A. Ei-Guebaly, S. Malang, T.K. Mau, Richard Peiperty, A.R. Raffray and L.
1 NCSX WBS HANDLING/SUPPORT UPDATE PLG 7/23/03 STATUS Study is for 120 degree VVSA field period assembly. Vessel Installation Support Concept.
NCSX B. Nelson for the NCSX Engineering Team NCSX modular coil cooling workshop June 10-11, 2004 PPPL NCSX Modular Coil Cooling Requirements and Initial.
NCSX NCSX CDR May 21-23, 2002 H.W. Kugel Slide 1 Conceptual Design for NCSX Auxiliary Systems Heating, Fueling,Wall Conditioning and Vacuum Systems.
NCSX NCSX Trim Coil Peer Review 11/6/07 1 Tom Brown Art Brooks Raki Ramakrishnan Mike Kalish NCSX Trim Coil Peer Review.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62) Manager.
SC Project Review of NCSX, April 8-10, 2008 NCSX Machine Assembly E. D. Perry.
NCSX P. Fogarty, K. Freudenberg, T. Hargrove, G. Lovett, B. Nelson, P. Goranson, D. Williamson October 15, 2004 Twisted Racetrack Coil Final Design Review.
1 Stellarator Core Metrology issues NCSX WBS-1 Meeting April 2, 2003 What are we measuring? When? How do we take the measurements? How do we correlate.
NCSX VACUUM VESSEL PL Goranson Final Design Review November 17, 2005 Man Access Port /Lateral Supports NCSX.
Nonlinear Analyses of Modular Coils and Shell structure for Coil Cool-down and EM Loads Part 1 – Results of Shell Structure and Modular Coils H.M. Fan.
1 PFC requirements  Basic requirements  Carbon based  Provisions for adding (interface design included in research prep budget)  NBI armor  Trim coil.
A View of NCSX Structural System and Load Path for the Base Support Structure.
NCSX 21 March 2003 Reiersen - 1 PDR Preparations Wayne Reiersen NCSX Engineering Meeting 21 March 2003.
NCSX NCSX TF Coil Conductor FDR 5/17/05 1 Michael Kalish NCSX TF Conductor.
9/28/20051 Mike Viola 1, T. Brown 1, P. Heitzenroeder 1, F. Malinowski 1, W. Reiersen 1, L. Sutton 1, P. Goranson 2, B. Nelson 2, M. Cole 2, M. Manuel.
NCSX Stellarator Core Pre-conceptual Design Progress and Status Mike Cole, Paul Goranson, Brad Nelson, Dave Williamson NCSX PAC Meeting PPPL June 3-4,
NCSX VVSA / MCWF FDR A Systems Engineering Perspective Wayne Reiersen Bob Simmons NCSX VVSA / MCWF FDR May 19-20, 2004 PPPL.
A PROPOSED TF JOINT DESIGN FOR THE NSTX CENTERSTACK UPGRADE Robert D Woolley 25 February 2009.
Stellarator Core Machine Configuration NCSX Project Meeting Dec 19-20, 2000 B. Nelson, M. Cole, P. Fogarty P. Goranson, G. Jones, D. Williamson O AK R.
1 First wall mods status NCSX SIT Meeting Aug 12, 2002 Points at 0, 30, 60 degrees from Art Points x and 1.00 in cross sections First try at vessel.
1 NCSX radial build NCSX Project Meeting December 18, Modular coil build assumptions 2.Vessel build assumptions 3.FW/internal build assumptions.
Review of Modular Coil Winding Pack Configuration David Williamson March 19, 2004.
NCSX Vacuum Vessel Fabrication
Instrumentation for status monitoring of SST-1 superconducting magnets
MANUFACTURING OF MAGNETS FOR SST-1 TOKAMAK
Update on PANDA solenoid design
X.R. Wang, M. S. Tillack, S. Malang, F. Najmabadi and the ARIES Team
Stellarator Program Update: Status of NCSX & QPS
Presentation transcript:

Presented by Brad Nelson Tom Brown, Mike Cole, Paul Fogarty, Paul Goranson, Phil Heitzenroeder, Wayne Reiersen, Dave Williamson, and others NCSX PAC Meeting August 2, 2000 Stellarator Core Engineering

Presentation Outline Review of original option, “saddle coils in PBX-M” –Vacuum vessel and PFCs –Coil / structure design –Access for heating and diagnostics Development of winding design criteria Design solutions for “out-of-PBX” options –modular options –Saddles with new 1/R coils Plans for design development for CDR and PVR.

“In-PBX” was original option Re-use PBX TF, PF coils and structure Add pre-assembled, “drop in “ stellarator core, consisting of –vacuum vessel, –saddle coils, –saddle coil structure –conformal cryostat Studies provided design information that can be transferred to other configurations

Vacuum Vessel Vessel is stand-alone structure bake-able to 350C

Vessel fabrication options Press-forming is preferred option –Only 3 segment shapes required –Explosive forming a possible variant Brake-bending (ala W7-AS) possible but requires too much welding

PFC requirements Carbon-based material, bake-able to 350C Neutral beam armor –Protect VV from NBI shine-through and during beam calibration –Peak power density ~ 800 W/cm^2 Limiters / Divertor –Task force developing options for September –Limiters may be adequate for initial operation Vessel coverage –Coatings (eg boronization) may be acceptable initially –Full coverage may be required ultimately –Avg. heat flux ~ W/cm^2 for 12 MW heating Geometry: PFCs fit within 25 mm envelope inside VV

NBI armor Assume graphite tiles attached to VV, inertial cooling Temperature < 700 C, well below 1200 C limit

PFC coverage Plan staged approach, with limiters and coatings for initial operation Preferred approach is full graphite tile coverage, but: Total coverage of wall with conformal tiles is costly –major cost driver, equal to VV cost –large number of tile shapes Options under study –coatings on low heat flux regions –simplified tile design –conformal blankets

Cast Nickel-Al-Bronze structure, 48 segments, ~0.5-in wide x 3.5-in deep slots Typical Coil Cross-SectionCore Assembly Vacuum Vessel Helical Coils Structural Shell Saddle coils wound on shell

Outboard shell subassembly Vessel sector Inboard shell subassembly Shell / VV assembly

Leads and thermal insulation Saddle coils wound on shell coaxial lead for each coil installed Thermal insulation sprayed over shell (7 cm polyurethane with butyl rubber vapor barrier)

What are the issues? Access for Heating and Diagnostics Allowable winding parameters : Design Criteria –Current density –Bend radius –Shell groove dimensions

Access requirements Heating Systems –4 NBI injectors: adapt existing PBX-M systems –6 MW ICH (4 antennas) Diagnostics –Ports with correct size and view for initial set of diag. (83 listed) –Spare ports for upgrades (20) Fueling/pumping Man access Table 1 - Summary of Diagnostic Port Needs on NCSX Preliminary Assessment

Access for NBI Workable solutions found Beams tangent at 1.5 m Slight interference between beam boxes and with TF coils will require modifications No symmetry with 3 field periods and 20 TF coils

Access for RF heating Launcher envelope is 400x440x240 mm 4 launchers will fit within the large ports

MJC Access for diagnostics Access solutions identified for nearly all diagnostics Access ports must avoid saddle coils, shell parting lines, and external coils

Vacuum pumping on NBI duct

Winding design criteria Current density is the primary issue -LN2 cooling required for J up to ~20 kA/cm 2 -Room temperature cooling possible for J < 10 kA/cm 2 Current density is limited by a number of factors -material temperature limits -thermal stress due to temperature rise -power consumption -cooldown and pulse repetition rate -fatigue, other effects The issues, then, are: -how hot does the conductor get during a pulse? -how hot can the conductor get before it reaches a limit?

Temp. depends on J in copper

How hot is too hot? –Thermal stress in shell depends on winding spacing, bolt spacing and stiffness of winding –Stiffness of winding is the primary factor, “stiff” conductor would limit temp rise to < 20K current density to < 10 kA/cm 2 Outboard Flange Bolt Pocket Top/Bottom Interface Coil Slot Thermal stress was considered primary limit

Tests show cable soft enough to allow 250K rise Conductor Sample 4-in dia 13-in Plunger R&D shows cable is soft Current density target set at <20 kA/cm 2 in copper considering all factors

The cable conductor is made from very fine (36 Gage) wire Even after compaction, this cable is very flexible, and can be readily wound on a radius of 1.5 times the conductor thickness Recommend bend radius of 3 times the thickness to avoid excessive key- stoning and bunching What is minimum bend radius?

Design criteria summary “In-PBX” studies provided insight for design saddle coil windings –Current density limit is 22 kA/cm 2 in copper –Bend radius limit is 3 x conductor width –Winding groove > 13 mm for machining –Winding spacing depends on current in winding (ie, loads on ligament) Criteria used to develop / optimize new options

2 options now being studied Saddle coils plus 1/R (TF) background coils and PF/OH set Modular coils Plus weak 1/R background coils and PF/OH set

Coil option studies Design concepts being developed for both the saddle and modular coil options –Vacuum vessel and PFCs –Winding (including conductor, leads, etc.) –Structure (including field/force/stress analysis) –Integration with background PF/TF coils Design evaluation process has begun

3 period modular coils

Modular coil winding pack

A B C Lateral force direction is away from structure EM Force (lb/in) for Coil #1 in Coil Local Coordinate System Winding forces are toward web

I-beam casting supports two winding packs per coil Coil radial forces reacted by inner cylinder - tabs part of casting Vertical tabs extend to surface at +/- 1-m for coil-to-coil support Additional shear structure required Alternate Concepts Structure concepts

Coil Structure, Windings, and Side Plates Assembly Sequence based on QOS Study Figures are for QOS design Modular coil fab and assy.

Modular coil issues Coil winding trajectory –Bend radius –twist Access for heating and diagnostics Current density –Thermal insulation of modular coils difficult

Minimum bend radius Bend radii should be on the order of 10 cm Initial coil cases only 4 cm, but optimization has produced ~9 cm minimum radius W7-AS and HSX coils have 11.5 and 8.1 cm minimum bend radii Twist must also be addressed

Design Evaluation Process

Plans for PVR, CDR Evaluate and select best option for chosen plasma (Saddles + 1/R, Modular + weak TF coils,) Optimize geometry –Iterate winding aspect ratio, twist, bend radius, etc. –Configure ports Continue R&D (primarily CDR) –Small coil winding test –Small structural casting test –Vacuum vessel pressing

Summary The stellarator core design effort has included several different magnetic configurations, but only two are now candidates –Saddle coils plus background TF and PF coils (includes “In-PBX” option) –Modular coil option with “weak” 1/R coils and PF coils Concepts for vacuum vessel, saddle coils, and modular coils have been developed Access for heating and diagnostics evaluated in detail for C82, tools in place for detailed look at other specific configurations Plans in place to reach the PVR and CDR, most R&D is pending selection of configuration option