Nigel Makins EUROCONTROL

Slides:



Advertisements
Similar presentations
Transport TEN-T 2012 Calls for Proposals Info Day SESSION 2 MULTIMODAL AND CROSS-CUTTING PRIORITIES AIR TRAFFIC MANAGEMENT Unit Single European Sky - DG.
Advertisements

Joint Action for ECHIM European Community Health Indicators and Monitoring Antti Tuomi-Nikula National Institute for Health and Welfare (THL), Helsinki,
1 The EPO Co-operation Programme to reorient patent information centres Heidrun Krestel European Affairs, Member States 4 October 2010.
The Just Culture Initiative
ICAO TEM/NOSS Symposium November 2005
The CASCADE Programme From Concept to Operations ICAO ACP 5 July 2006 José Roca CASCADE Deputy Programme Manager
Objective ATC 12 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective ATC 15 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
17th February 2004: Slide 1 DG Transport and Energy OATA Workshop 17th February 2004 European Commission OATA and the Single European Sky.
The framework of the Convention on Long-range Transboundary Air Pollution Henning Wuester Secretariat of the United Nations Economic Commission for Europe.
E-OCVM (Version 2) Explained Episode 3 - CAATS II Final Dissemination Event Alistair Jackson EUROCONTROL Episode 3 Brussels, 13 & 14 Oct 2009.
Explosives Working Group 4 November 2014 Notified Bodies and NANDO Norma McGovern, DG ENTR.C1 – Internal Market and its International Dimension.
The European Strategic Safety Initiative NARAST and SEARAST Meetings Nov 07 J. Vincent, EASA Safety Analysis and Research Head M. Masson, EASA Safety.
Improving Communication in the Madrid System July 2010 Neil WILSON Director, Functional Support Division.
Swedish National Board of Trade - Christer Arvíus MARS Group meeting Bratislava, Slovak Republic 10 – 13 October 2007 Christer Arvíus Chairman UNECE WP.6.
Objective ATC 15 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
The Convention on Long-range Transboundary Air Pollution and EMEP (The Cooperative Programme for Monitoring and Evaluation of the Long-range Transmission.
EDEP UG Bretigny, June 9 th 2008 eDEP Users Group Meeting Radar Skills Trainer Road map Vladimir Bubalo, IANS TDH.
Objective ATC 12 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
SESAR Single European Sky Air traffic management Research
Dr. Barry Kirwan, EUROCONTROL Safety Culture Seminar introduction.
The CASCADE Programme Validation Status and Plans ASAS-TN2 Workshop 3-5 April 2006 Christos Rekkas CASCADE Deputy Programme Manager European Organisation.
David Bowen Head of ATM Operations and Systems
Scene setting for CAATS II Episode 3 - CAATS II Final Dissemination Event Carlos Regidor Isdefe CAATS II Brussels, 13 & 14 Oct 2009.
WORKSHOP, Nicosia 2-3rd July 2008 “Extension of SAFETY & QUALITY Common Requirements to the EMAC States” Item 3 : Regulatory Context Peter Stastny EUROCONTROL.
Social Europe ETUC Social Protection Working Group 24 September 2013 Egbert Holthuis DG Employment, Social Affairs and Inclusion.
European Operational Concept Validation Methodology E-OCVM Version 3: What’s New Episode 3 - CAATS II Final Dissemination Event Matthias Poppe DFS Episode.
ASAS-TN Workshop Glasgow 11 September 2006 Alex Wandels CASCADE Programme Manager EUROCONTROL European Organisation for the Safety of Air Navigation CASCADE.
1 EUROCAE EUROCAE Dedicated to Aviation Standardisation ASAS Standards: “From concept to equipment” David Bowen (Technical Secretary) April 24 th 2007.
U.S./Europe International Aviation Safety Conference By: Eric Sivel Date: 8 June 2006 “Global Aviation Safety Processes: Refining, Reinforcing, and Streamlining”
10/11/2015 National Renewable Energy Action Plans: Towards the EU Renewables 2020 Targets EUFORES 10th Inter-Parliamentary meeting - Madrid, 16 April 2010.
Visit of Mr Griffiths, DG CAA UK - 20 December 2007 EUROCONTROL.
Christos Rekkas ADS Programme Manager EUROCONTROL
The European Organisation for the Safety of Air Navigation V & V Some lessons learned in Europe FAA V&V Symposium, Atlantic City, October 2010 Nigel.
Using JASPERS Throughout the Project Cycle Including IQR and PSA Mark Mawhinney Belgium Nov 2015.
Objective ATC 07.1 ESSIP Plan 2013 Luca DELL’ORTO DSS/EIPR
Progress under the Convention on Long-range Transboundary Air Pollution Twenty-ninth meeting of the Task Force on Integrated Assessment Modelling
Gender Equality is key towards the eradication of Violence against Women.
Comparative analysis of the National Rural Networks (NRNs) in the EU Member States Martin Law Contact Point of the European Network for Rural Development.
Module V Creating awareness on validation of the acquired competences
Insurance Comparison Websites: EIOPA Good Practices
Unique in Europe. Across Europe.
ERIC Experiences and New Developments
Eurojust cases involving crimes against children
The Single European Sky Implementation Programme: SESAME
Statistical indicators for the Bologna implementation report
Erasmus+ Come to study or teach in Europe Erasmus+
Dr Mario Oetheimer Civil Society Days 2018 Brussels, May 2018
State of legal transposition (1)
Ag.no.16 A65 country manuals and country assessments
Report on WISE Art.8 and GIS issues
Habides update (May 2011).
State of play Article 5 reports
Strengthening the social dimension of the EMU COM (2013) 690 ESF Informal Technical Working Group Brussels, 5 December 2013 Carola BOUTON DG Employment,
Marine Strategy Framework Directive: Transposition and Implementation
Item 8.1 Implementation of the 2016 Adult Education Survey
Programme adoptions Cohesion Policy:
ETS Working Group meeting 24-25/9/2007 Agenda point 7 CVTS3 brief update /09/ 2007 ETS working group.
The Macroeconomic Imbalances Procedure - brief overview
3.6. Impact of population and housing census results on population stocks and on LFS and SILC–follow-up DSS Meeting September 2012.
2015 Update of Union Lists of Sites of Community Interest
State of Play RBMPs and WISE reporting (9/07/10)
STEM Education Policies and Practices in Europe
Overview of the implementation of the SEA directive
Doc.A6465/16/03 Ag.no.16 A65 country manuals
The Convention on Long-range Transboundary Air Pollution
IT security assurance – 2018 and beyond Item 2 of the agenda DIME/ITDG Steering Group June 2018 Pascal JACQUES ESTAT B2/LISO.
LAMAS Working Group June 2015
Input Presentation for Working Group 6
DG Environment, Unit C.2 Marine Environment and Water Industry
Presentation transcript:

Nigel Makins EUROCONTROL nigel.makins@eurocontrol.int Turning research into real systems The role of Validation and the E-OCVM Nigel Makins EUROCONTROL nigel.makins@eurocontrol.int

‘Are we building the right system’ Overview Overview of European R&D structure Overview of European R&D Validation methodology Key areas that R&D needs to address in order to turn research into reality Scope is ATM Research & Development Its about ensuring that research supports procurement Its about using research to answer the stakeholders question ‘Are we building the right system’

Europe Eurocontrol (38) EU (27) ECAC (42) XX IS FI Massive expansion of European Union (EU) and EUROCONTROL in 90’s EU expands to 27 members - able now to make law and set rules and mandates 2001 - Single European Sky (SES) initiative to re-organise European Air Traffic Management 2004 – SES ATM Research (SESAR) programme start – with Definition phase Definition phase sets out working methods incl Validation. 2008 – SESAR Joint Undertaking (SJU) formed to manage the 2.1 billion Euro Development phase of SESAR RU NO SE Nov 9th 1989 EE LV DK LT IE BY KZ GB NL PL BE DE UA LU CZ SK MD AT FR CH HU RO GE SI AZ HR AM BA SR BG IR IT CG PT ES MK TR AL GR IQ SY CY DZ MA TN MT

SESAR Joint Undertaking SESAR – R&D 2005 2010 2015 2020  Definition SESAR Phases Development Deployment SESAR Joint Undertaking Implementation Development work ATM System 2005 2010 2015 2020

3 Implementation Packages SESAR Implementation 3 Implementation Packages 2009 2013 2017 2020 2025 IP1 IP2 IP3 Each individual Air Traffic Service Provider (ANSP) will manage own procurement to comply with SESAR expectations EUROCONROL 38 member states of which 27 EU. Need clear processes. Validation methodology one of those processes Now embedded in SESAR System Engineering Methodology

From a dream to reality The dream! Research determines the new transport capability (elephant) To build that dream many ‘specialists’ are needed Different ‘specialists’ describe the various parts of this new system so that it can be built

The build Result of not having a shared vision !! a collection of parts R&D must build a shared vision of the future. This is what the European Operational Concept Validation Methodology sets out to do.

Validation during R&D European methodology is based on the belief that stakeholder’s must be consulted through the R&D phases Only way to get agreement about are we building the right system The concept will change as it develops Validation criteria not easy to determine during these phases Validation during research and early development is an iterative consultation process to build a shared vision.

European Ops Concept Validation Methodology - E-OCVM Three parts to the methodology Lifecycle Structured Planning checklist Cases. Following slides more detail on each part

1 - Life cycle This life cycle has been adopted R&D E-OCVM Scope De-commissioning Deployment Performance needs Industrialisation Operations V0 V1 V2 V3 V4 V5 V6 V7 Scope Feasibility Integration This life cycle has been adopted by SESAR Master Planning

2 - Structured Planning Acts as a check list of what to do Provides structure to contracts for validation projects Applied to each R&D phase V0 V1 V2 V3 V4 V5 V6 V7

Performance driven Understand the problem Understand the solution What is stopping the current system from delivering better performance Understand the solution What is the performance expectation What is the benefit mechanism How can improvements be measured Create a strategy to develop and test the solution Ensure show-stopping issues identified early e.g. need for; Technical standards Safety regulatory tests SARPS (ICAO Operational procedures)

Learning from research Concept description Re-consider solution Validation strategy Revisit strategy Exercise objectives Revisit exercise plan Results Exercise Results as expected? Feedback from research is essential to ensure we get what we expect

Human Performance Case 3 - Cases Packaging the evidence to support stakeholders decisions Standards Case Regulations Case Safety Case (for R&D) Human Performance Case Environmental Case Safety Case Business Case R&D E-OCVM Scope De-commission V0 V1 V2 V3 V4 V5 V6 V7 Scope Feasibility Performance needs Integration Industrialisation Deployment Operations

A process Three parts A process that follows the lifecycle phases Performance driven Interactive with stakeholders & Evidence dependant

Interface with SESAR Industrial partners E-OCVM V1 V2 V3 V4 V5 V6 End of V3 = TRL 6 End of V5 = TRL 8 Procedures deployed Ops Procedure & Requirements draft Procedures approved Concept, scope Mature procedures Costs, benefits and performance Mock-up simulation First dev. std Function certified Certif. dev. std prototypes 2 3 4 5 6 7 8 9 NASA TRL R & D phases Development phases In service phase

Regulations to standards Community specifications are standards or specifications covering technical and operational issue. They are Fundamental to building the system described during R&D, & Important aspect of the R&D validation strategy

Community Specifications. Standards milestones OSED - Ops Services &Environment description - key document linking concept to technical description Safety & Performance requirements Interoperability requirements Community Specifications. Origin of SPR and INTEROP in 90s SPR is based on an operational perspective, acceptable safety and performance SPRs and INTEROPs cover three components of system = AOC, ATM and aircraft MOPS is the airplane standard INTEROP is technology oriented – can have multiple INTEROPs for one SPR. INTEROP can replace the MOPS (the aircraft portion of the INTEROP) if it has all the test procedures needed in a MOPS SPR is global and only used in its entirety when making a total system change may obviate a MASPS or MOPS if no specific technology being proposed – only need a MASPS or MOPS if trying to certify a specific technology and need a technology-specific standard advice on OSED writing (noting that it is part of the SPR) don’t spend too much time on the Environmental Conditions focus on OSA (Operational Safety Analysis) and OPA (Operational Performance Assessment) start SPR as soon as possible since OSED is not complete till SPR is done since OSED might give manufacturers a false sense that they have all they need from an OSED ICAO Standards & recommended practices Minimum operational performance standards

Turning research into reality by building consensus Building a shared vision based on evidence is critical in turning research into reality. Validation during R&D is getting buy-in from key stakeholders operational staff, airspace users, technology supply industry, regulators Making sure ‘we are building the right system’

Questions For info. google search word e-ocvm