4/4: Material Requirements Planning Dependent inventory model For in-house inventory planning.

Slides:



Advertisements
Similar presentations
ISEN 315 Spring 2011 Dr. Gary Gaukler. Hierarchy of Planning Forecast of aggregate demand over time horizon Aggregate Production Plan: determine aggregate.
Advertisements

Material Requirements Planning
15 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Inventory and MRP 15 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
Operations Management Material Requirements Planning (MRP) Chapter 14
Material Requirements Planning
Dependent Inventory: Material Requirements Planning BA 339 Mellie Pullman.
Master Production Scheduling (MPS) – Basic Techniques pom
14 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall 14 Material Requirements Planning (MRP) and ERP.
Principles of Operations Management
Material Requirements Planning (MRP)
4. Production and Material Planning
Push Vs. Pull Part Two – Focus on MRP IE 3265 POM R. R. Lindeke, Ph. D.
© The McGraw-Hill Companies, Inc., Chapter 15 Materials Requirements Planning.
21–1. 21–2 Chapter Twenty-One Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
MRP, MRP II, and ERP.
Material Requirements Planning
Chair Seat Legs (2) Cross bar Side Rails (2) Cross bar Back Supports (3) Leg Assembly Back Assembly Level Product Structure Tree.
1 1 Slide © 2000 South-Western College Publishing/ITP Slides Prepared by JOHN LOUCKS.
1 1 Slide © 2001 South-Western College Publishing/Thomson Learning Anderson Sweeney Williams Anderson Sweeney Williams Slides Prepared by JOHN LOUCKS QUANTITATIVE.
MRP Material Requirements Planning. MRP …is a planning and scheduling technique used for batch production of assembled items. … is a computer-based information.
© 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Operations Management Material Requirements Planning (MRP) & ERP Chapter 14.
11/10: MRP continued. Review: Material Requirements Planning Need to know: –Master Schedule –Bill of Materials –Lead times –Due date. Go to spreadsheet.
1 Material Requirement Planning (MRP) Chapter 16 Feb 9, 2006.
13-1MRP and ERP. 13-2MRP and ERP  Material requirements planning (MRP): Computer-based information system that translates master schedule requirements.
Session 10 Material Requirements Planning pom
Materials Requirements Planning
Operations Management Material Requirements Planning
Material Requirements Planning (MRP)
1 Slides used in class may be different from slides in student pack Chapter 16 Materials Requirements Planning  Material Requirements Planning (MRP) 
Chapter 16 Inventory Systems for Dependent Demand
Material Requirements Planning
Chapter 15 MRP and ERP.
1 Materials Requirements Planning. 2 Material Requirements Planning Defined Materials requirements planning (MRP) is a means for determining the number.
Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 1998 Material Requirements Planning (MRP) Chapter 15 11/7/05 Overview Position of MRP in Operation.
1 Operations Management MRP Lecture 22 (Chapter 14)
Hierarchy of Production Decisions
13-1MRP and ERP William J. Stevenson Operations Management 8 th edition.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. MRP (Material Requirement Planning) (Method under Dependent.
© The McGraw-Hill Companies, Inc., Master scheduling Material requirements planning Order scheduling Weekly workforce and customer scheduling Daily.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 18 Material Requirements Planning.
Chapter 15 Resource Requirements Planning: MRP and CRP.
BA7201: Operations Management Assignment - II Q1: Compute the Net Requirement and timing of production for each component Q2: Draw up the projected available.
Master Production Scheduling
15 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Resource Planning 15 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
13-1MRP and ERP William J. Stevenson Operations Management 8 th edition.
MGMT Materials Management Systems Materials Requirements Planning Chapter 4.
Introduction to Materials Management Chapter 4 – Material Requirements Planning.
Low Level Coded Product Structure Tree
Material Requirements Planning (MRP) and ERP
Resource Planning Chapter 15.
Materials Requirements Planning
Operations Fall 2015 Bruce Duggan Providence University College.
Manufacturing Systems Engineering
© The McGraw-Hill Companies, Inc., Chapter 15 Materials Requirements Planning.
BUAD306 MRP.
11-1  Material requirements planning (MRP): Computer-based information system that translates master schedule requirements for end items into time-phased.
INVENTORY CONTROL OF MANUFACTURING SYSTEMS Prof. Dr. Orhan TORKUL Res. Assistant M. Raşit CESUR.
1 By: Prof. Y. Peter Chiu MRP & JIT ~ HOMEWORK SOLUTION ~
© 2008 Prentice Hall, Inc.14 – 1 Material Requirements Planning (MRP)
CHAPTER-14 MRP AND ERP MD. TAZIDUL ISLAM. 2  Material Requirement Planning (MRP) is the concept of designing and developing information system to aid.
1 © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved Chapter 16 Materials Requirements Planning.
MRP and ERP McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Reid & Sanders, Operations Management © Wiley 2002 Material Requirements Planning 15 C H A P T E R.
Facility Inventory Old Facilities Modern Facilities Classroom Size
Chapter 16 Materials Requirements Planning
Introduction to Materials Management
Material Requirement Planning (MRP)
MRP Introduction EXAMPLES
HOMEWORK ASSIGNMENT— MRP PROBLEMS
HOMEWORK ASSIGNMENT— MRP PROBLEMS
Presentation transcript:

4/4: Material Requirements Planning Dependent inventory model For in-house inventory planning

Requirements of MRP Master production schedule –when to make what Bill of Materials: how to make the product Lead times –how long it takes to get various components Inventory availability Scheduled receipts & on-hand inventory

Master Production Schedule Tells us what is required to meet the production plan. Statement of what is to be produced, NOT a forecast of demand.

Bill of Materials A list of quantities of components, ingredients, or materials to make a final product. Provides the product structure. EX: A “Blast ‘em, dude” audio kit (A) is made of 2 small tweeter boxes (B) and 3 large woofer boxes (C). Each tweeter is made of two speakers (D) and two shipping boxes (E). Each woofer consists of two boosters (F) and two shipping boxes (E). Each booster is made of a circuit board (G) and a speaker (D).

A 2B 3C

EX: A “Blast ‘em, dude” audio kit (A) is made of 2 small tweeter boxes (B) and 3 large woofer boxes (C). Each tweeter is made of two speakers (D) and two shipping boxes (E). Each woofer consists of two boosters (F) and two shipping boxes (E). Each booster is made of a circuit board (G) and a speaker (D). A 2B 3C 2D2E

EX: A “Blast ‘em, dude” audio kit (A) is made of 2 small tweeter boxes (B) and 3 large woofer boxes (C). Each tweeter is made of two speakers (D) and two shipping boxes (E). Each woofer consists of two boosters (F) and two shipping boxes (E). Each booster is made of a circuit board (G) and a speaker (D). A 2B 3C 2D2E 2F 2E

EX: A “Blast ‘em, dude” audio kit (A) is made of 2 small tweeter boxes (B) and 3 large woofer boxes (C). Each tweeter is made of two speakers (D) and two shipping boxes (E). Each woofer consists of two boosters (F) and two shipping boxes (E). Each booster is made of one circuit board (G) and one speaker (D). A 2B 3C 2D2E 2F 2E G D

EX: A “Blast ‘em, dude” audio kit (A) is made of 2 small tweeter boxes (B) and 3 large woofer boxes (C). Each tweeter is made of two speakers (D) and two shipping boxes (E). Each woofer consists of two boosters (F) and two shipping boxes (E). Each booster is made of one circuit board (G) and one speaker (D). A 2B 3C 2D2E 2F 2E G D Note that the numbers here are only relevant to the level above them!

A 2B 3C 2D2E 2F 2E G D “Exploded” Product Structure Items above a level are PARENTS; Items below a level are COMPONENTS or CHILDREN.

A 2B 3C 2D2E 2F 2E G D Level 0 level 1 level 2 level 3 Exploded Product Structure: 4 levels.

Lead times Time required to acquire (purchase, produce, or assemble) an item. Manufactured part: lead time made of move, setup, and assembly or run times for each component. Purchased part: lead time made of difference between when part is ordered and when it is received.

A 2B 3C 2D 2E 2F 2E G D Lead times A1 wk. B2 C1 D1 E2 F3 G2 Time-Phased Product Structure Rotate BOM below and reflect lead times with time as the X axis.

A 2B 3C 2D 2E 2F 2E G D Lead times A1 wk. B2 C1 D1 E2 F3 G Time-Phased Product Structure Rotate BOM and reflect lead times on X axis.

Gross Material Requirements Assume we need 50 “Blast ‘em, dude” speaker kits in eight weeks. We need to calculate when and how many of each component we need to start making. Go to spreadsheet

Lot sizing lot-for-lot (L4L): order exactly the amount you want. Lot size required: order in certain amounts (ex. a dozen eggs).

Scheduled Receipts & On-Hand Inventory Scheduled Receipts: –Units (of any component) that you have already scheduled to come in at a particular time. On-Hand Inventory –Units (of any component) that you already have in stock (at the beginning).

Gross Req. vs. Net Req. Gross required is the total amount of a component you need. Net required is (Gross) - (On-hand inventory) - (Scheduled receipts)

Planned Order Receipts & Releases Planned Order Receipts: –When you PLAN to RECEIVE what you ORDERED. Planned Order Releases: –When you PLAN to RELEASE what in an ORDER.

MRP: What you need to know Master Schedule Bill of Materials Lead times Lot sizes Scheduled receipts & on-hand inventory

Group Exercise:Create an MRP You make the PalmPointer, a handy PDA. You have received an order for 200 units to be shipped in 12 hours. A PalmPointer is made of a LCD screen, 4 buttons, 1 toggle button, and a motherboard. The motherboard is made of 3 processors, 2 clock batteries, and a circuit board. Assembly time for the assemblies are as follows: All parts are L4L except the batteries, which must be ordered in packs of 40. You already have 50 motherboards and 100 processors. –PalmPointer2 hoursLCD screen1 –buttons2toggle button3 –motherboard6processors2 –batteries1circuit board3 Create an MRP schedule to determine when to begin assembling each component. Go back to spreadsheet

Homework due 4/11 Download handout at There are two problems to be answered. Print out problems and turn in ON PAPER – no submissions.