IMPLEMENTATION & MIGRATION WORKING GROUP PROVISIONING EXPERTS MEETING Wednesday 1st March 2006.

Slides:



Advertisements
Similar presentations
Syndicate A - Issues Geographic nos: –DLERange changes re:parenting & DLE closures DTS, some DTM Solution: correct grid reference and Audit overrides Invoice.
Advertisements

For discussion purposes. No implementation assurances 1 Consult 21 Interconnect & Portfolio Working Group NGN Interconnect - PSTN Emulation Blended Rate.
This update is a BT perspective of Working Group status including input from the Co-Chair call of 7 th September Nigel Scott 13 th Sept 05 Consult21 -
1 Chapter 10 Introduction to Metropolitan Area Networks and Wide Area Networks Data Communications and Computer Networks: A Business User’s Approach.
Installing Electrical Switches and Receptacles
DB Audit Expert v1.1 for Oracle Copyright © SoftTree Technologies, Inc. This presentation is for DB Audit Expert for Oracle version 1.1 which.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
What is in Presentation What is IPsec Why is IPsec Important IPsec Protocols IPsec Architecture How to Implement IPsec in linux.
11 NETWORK PROTOCOLS AND SERVICES Chapter 10. Chapter 10: Network Protocols and Services2 NETWORK PROTOCOLS AND SERVICES  Identify how computers on TCP/IP.
For discussion purposes. No implementation assurances 1 Consult 21 Interconnect Working Group NGN Interconnect - PSTN Emulation Technical Consultation.
Diagnostic & Troubleshooting Date 06/09/00, Page 1 Diagnostic & Troubleshooting s.
Virtual Mechanics Fall Semester 2009
Standard Contract Forum 24 April Customer Suite, BT Centre, London.
I&P: Contracts Clinic 24/02/06 1 Minutes Table Derivation & Application of Overflow The focus of the presentation is on principles: How it works how we.
Operation of vDLE concept Revised C&W proposal. Background C&W continue to believe that in the “virtualised” situation CPs should pay connection & rental.
AGENDA Introduction to Virtual Mechanic Demo Architectural diagram and summary QA steps and user acceptance testing Bugs in the software Feedback from.
IBM Global Services © 2010 IBM Corporation RTC Work Item Importing Anoop
CCAT Troubleshooting Training XenApp April 2012 Citrix Consulting Architecture Team.
Anthony Stephens 21CN Customer Engagement 1 21CN High Level Consultation Plan The following plan provides a four month view of key consultation themes.
Consult21 IMWG Pre-Migration Scheduling Consultation Summary & Approach The purpose of this presentation is to share the summary and.
Online Translation Service Capstone Design Eunyoung Ku Jason Roberts Jennifer Pitts Gregory Woodburn Kim Tran.
Unmetered Interconnect Products Erol Ziya CUT. Overview Brief history of CUT History of BT SurfTime and FRIACO FRIACO today: FRIACO ST FRIACO in the future:
Narrowband & IP Strategy Steve Wickenden & Dave Hughes 12 November 1999.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
21CN Legacy Interconnection Working Group 17 th December 2004 Auditorium City Place, Gatwick.
Interconnect Policy & Contract
TCP/IP Honolulu Community College Cisco Academy Training Center Semester 2 Version 2.1.
1 EBC Workshop Introduction and Welcome.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
Consult 21 - TWG The Pathfinder Programme Keith Fowler 14 January 2005.
1 Hertfordshire County Council Knowing your school.
Implementation & Migration Working Group 18 th January 2006 Kevin Young Interconnect & Numbering Services The information in this presentation relates.
Consult 21 Interconnect Working Group 7 Nov 2005 Ian Self Virtual Interconnect Capacity Product Outline The information in this presentation relates to.
Collage at Cass Business School. 12th June IWMW - UKC Cass Business School Major UK Business School Requirements Marketing Programmes, research,
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
V IRTUAL P RIVATE N ETWORKS K ARTHIK M OHANASUNDARAM W RIGHT S TATE U NIVERSITY.
1 eCoRepair New Release Slide Expanded view of Circuit Details Change to Circuit Looping text4 View of closed faults up to 30 days old5 - 7 Minor.
1 DLE to NGS Migration: Contracts Clinic 24 th February 2006 The information in this presentation relates to plans currently under development and subject.
Consult21 Industry Input FAS INTERCONNECT A request from Industry as input to the Consult21 BB/LLU Working Group.
A Guide to SQL, Eighth Edition Chapter Six Updating Data.
Communication Architecture and Network Protocol Layering Networks and Protocols Prepared by: TGK First Prepared on: Last Modified on: Quality checked by:
Pathfinder Working Group BT Centre Showcase, Registration: 9.45 am Start time: am.
1 EBC Conference Introduction and Welcome.
1 User Pays Non-Code Services – Contract Change Process Summary A Contract Change Proposal (CCP) is submitted. The Contract Change Register (CCR) is updated.
Oracle Business Intelligence Foundation – Testing and Deploying OBI Repository.
BT Wholesale Overflow and High Usage Options Current position - OverflowCurrent position - Overflow Principle for Route Dimensioning is that all Traffic.
Clive Feather 6 May 2005 Virtual IECs – playing the game © Copyright THUS Group plc All rights reserved.
12 September Billing Meeting Summary. Objectives Review of EBC concepts Establish how EBC will be calculated for the following BT terminating BT Originating.
Ketty Attal-Toubert and Stéphanie Himpens Insee 22nd of June, 2011 Using SAS to implement additional tools.
The Power of Excel for Ad Hoc Reporting FAB 5013 Brian Caviggiola Controller - Indiana Wesleyan University Mike Ionno Senior.
CORA ASR Gateway 20.0/ASOG 45 Release June, 2012.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Access Control Lists Accessing the WAN – Chapter 5.
Orders – Create Responses Boeing Supply Chain Platform (BSCP) Detailed Training July 2016.
Exploring Excel Chapter 8 The Expert User:
Packet Switching Datagram Approach Virtual Circuit Approach
Winners Cheque Analysis
Paul Woods Chair, MITIGATION: Ensuring we procure cloud services taking into account of the risks involved Paul Woods Chair, ISNorthEast.
Q TRACKER Tracking on the job training hours for Apprentices.
Computer Security Security Concepts September 20, 2018
Implement Inter-VLAN Routing
ECEN “Internet Protocols and Modeling”
Oracle HFM Implementation Boot Camp
Claire Osgood November 2017
OSI Model The Seven Layers
Implement Inter-VLAN Routing
Smart Integration Express
Digital Logic Experiment
Implement Inter-VLAN Routing
Presentation transcript:

IMPLEMENTATION & MIGRATION WORKING GROUP PROVISIONING EXPERTS MEETING Wednesday 1st March 2006

Health Warning The information in this presentation relates to plans currently under development and subject to consultation and may be subject to radical change at any time without notice. The information in this presentation is without prejudice to commercial and contractual discussions. It does not imply acceptance of the Virtual Interconnect Circuit product, System Alteration Notice process nor its associated contractual clauses agreed or otherwise or indeed anything remotely connected with 21CN. This information is not suitable for children or those of a nervous disposition. This information may contain nuts. This information is suitable for vegetarians.

New ACO - Segregated Route Option Objective of session is to: Show current example of route to BT DLE Explain how VIC circuits will be shown on ACO Show result of Cardiff (Pathfinder) changes Summarise results of the exercise

ntl's version of BT ACO has: Extra columns with exchange 'real names' Extra column with transmission identity in ntl terminology ‘Transmission Verifier’ sheet for easy checking of Sneids IEC check system (BT switch against Point of Connection) BT ACO v. ntl version of BT ACO

Cardiff (CF/REX/1) Cardiff DLE E (CF/UE) Cardiff Iolite NGS (CF/ILT) 2 E1s on Sneid A 2 E1s on Sneid B 4 E1s on Sneid C 2 E1s on Sneid D Egress/IDA route (total = 10 E1s) Existing Egress, IDA, Ingress etc routes on six Sneids Migration Cardiff DLE Unit E (CF/UE) Today Note: NTS connection not shown

Cardiff (CF/REX/1) Cardiff DLE E (CF/UE) Cardiff Iolite NGS (CF/ILT) 2 E1s on Sneid A 2 E1s on Sneid B 4 E1s on Sneid C 2 E1s on Sneid D Egress/IDA route (total = 10 E1s) Existing Egress, IDA, Ingress etc routes on six Sneids Migration Cardiff DLE Unit E (CF/UE) Traffic removed from DLE route & segregated route(s) built Note: NTS connection not shown

Cardiff (CF/REX/1) Cardiff DLE E (CF/UE) Cardiff Iolite NGS (CF/ILT) Migration Cardiff DLE Unit E (CF/UE) New route jumpered on existing transmission 2 E1s on Sneid A 2 E1s on Sneid B 4 E1s on Sneid C 2 E1s on Sneid D Egress/IDA route (total = 10 E1s) Existing Egress, IDA, Ingress etc routes on six Sneids Note: NTS connection not shown

Cardiff (CF/REX/1) Cardiff DLE E (CF/UE) Cardiff Iolite NGS (CF/ILT) Migration Cardiff DLE Unit E (CF/UE) Traffic re-instated & old route data recovered 2 E1s on Sneid A 2 E1s on Sneid B 4 E1s on Sneid C 2 E1s on Sneid D Egress/IDA route (total = 10 E1s) Existing Egress, IDA, Ingress etc routes on six Sneids Note: NTS connection not shown

Today’s ACO: connections to CF/UE

ACO showing CF/UE virtual connections

Amended ACO (part) for Cardiff

SUMMARY New ACO format is manageable May be thousand or more additional rows…... Open to errors - no easy checking mechanism Excel not user friendly - need Access to manipulate data Poor data integrity using Excel: - no history log - no audit trail for changes