John Arthur LUSI DOE Review August 19, 2008 Transition to Operations p. 1 From construction project to operating facility Structure.

Slides:



Advertisements
Similar presentations
Jose Chan FAC- Undulator System Installation & Assembly 10/30/07 1 Undulator System Installation & Assembly Schedule Jose.
Advertisements

LCLS Transition to Science DOE Status Review of the LUSI MIE Project LCLS NEH ARR John Arthur LCLS Experimental Facilities Division August 11, 2009 Welcome.
Tom Fornek LUSI 12 November 2008 SLAC National Accelerator Laboratory 1 LUSI Status Update Tom Fornek Project Manager.
Hal Tompkins FEE/FEL June 16, FEE/FEL Commissioning Overview By Hal Tompkins Photon Beam Systems Deputy.
1 John Arthur 1 FEH Status CXI Review June 3, 2009 FEH Layout, Status John Arthur – LCLS Expt’l Facilities Div June 3, 2009.
Tom Fornek LUSI June 17, LUSI UPDATE – June, 2008.
Jochen R. Schneider AMO Proposal June 2, LCLS User Access Policy Goals Scientific thrust areas - Instrument Teams.
John N. Galayda LCLS Facility Advisory November 11, LCLS Update November 11, 2008 Construction Status LCLS Instruments.
John Arthur X-ray November 11, 2008 SLAC National Accelerator Laboratory 1 X-ray Overview LCLS Directorate structure.
John N. Galayda LCLS FAC 20 April Linac Coherent Light Source Overview and Charge Facility Advisory Committee John.
John Arthur LCLS September 26, 2005 John Arthur SLAC LCLS Construction and Science.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project The Instrument Readiness Review Process John Arthur LCLS Experimental Facilities Division.
Stefan Moeller Revised XES April 7, 2005 Revised X-Ray Endstation Scope Stefan Moeller.
J. B. Hastings LCLS FAC October 29, 2007 LUSI Overview 1 LUSI Overview J. B. Hastings Science Opportunities Project Description Project.
John Arthur X-ray June 17, X-ray Overview XTOD current status XES current status Schedule to first experiments.
J. B. Hastings LCLS User October 12-13, 2004 LCLS User Program J. Hastings SLAC/SSRL.
Diffraction studies of stimulated dynamics (pump-probe) Coherent-scattering studies of nanoscale fluctuations Atomic, molecular and optical science High.
John Arthur Photon Systems April 16, LCLS Photon Systems Status Technical status and accomplishments Response to.
Accelerator Systems Division FACET Project Management John Seeman for the FACET Study Group PPA Directorate Stanford Linear Accelerator Center DOE FACET.
John Arthur Photon October 29, Photon Systems Update FAC recommendations Current status New plan for Photon Systems.
John Arthur Photon October 27, Photon Systems Overview John Arthur SLAC.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project NEH status and XFD operations Hal Tompkins, John Arthur LCLS Experimental Facilities.
John N. Galayda LCLS FAC October Linac Coherent Light Source Overview and Charge Facility Advisory Committee.
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
John Arthur Photon April 20, 2006 Photon Systems Update John Arthur SLAC Photon Systems Manager.
John N. Galayda LCLS Facility Advisory 29 October 2007 Linac Coherent Light Source Overview 29 October 2007  Project.
John Arthur X-Ray Endstation April 29, 2004 X-Ray Endstations Overview John Arthur.
1 T. Fornek 1 LUSI CXI FIDR June 3, 2009 Thomas Fornek Project Manager June 3, 2009 LUSI Coherent X-Ray Imaging Instrument Final.
John Arthur PIXEL Project April 7, 2005 Status of the Proposed PIXEL Project John Arthur SSRL/SLAC Photon Instrumentation.
1 T. Fornek 1 LUSI XCS FIDR June 17, 2009 Thomas Fornek Project Manager June 17, 2009 LUSI X-Ray Correlation Spectroscopy Instrument.
John Arthur X-ray April 20, 2006 X-Ray Beamline and Experiment Layout John Arthur LCLS Photon Systems Manager.
John Arthur Photon October 12, Photon Systems Update John Arthur SLAC 1.
LCLS Undulator Systems TDR Charge Linac Coherent Light Source Stanford Linear Accelerator Center Technical Review, March 3, 2004.
Stefan Moeller XES Plan for FAC Review - April 20, 2006 X-Ray Endstation Systems (XES) Status and Plan for FY06 Stefan Moeller.
Arturo Alarcon Undulator Controls Module Status 11/12/2008 SLAC National Accelerator Laboratory 1 Undulator Controls Module Status.
John Seeman LCLS December 2, Conduct of LCLS Accelerator Operations John Seeman Assistant Director LCLS Directorate.
Keith O. Hodgson SSRL Director Brief Update on the Linac Coherent Light Source - LCLS February 26, 2002 Basic Energy Sciences Advisory Committee Undulator.
Introduction to FACET & Test Facilities and charge to SAREC committee Vitaly Yakimenko June 25, 2013.
David Schultz Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory 1 Undulator Complex Status LCLS Introduction.
M. Reichanadter LCLS Project November 2008 FAC Meeting Slac National Accelerator Laboratory Report to the LCLS.
John N. Galayda LCLS Accelerator Readiness December 2, LCLS Overview December 2, 2008 Project Construction Status.
DOE Stanford Site Office Office of Science U.S. Department of Energy 1 U.S. Department of Energy’s Office of Science Office of Science Review of the LCLS.
John N. Galayda DESY October 8, LCLS Commissioning in 2008 J. Galayda, for The LCLS Construction/Commissioning.
J. B. Hastings LUSI DOE Review July 23, 2007 LUSI Overview 1 LUSI Overview J. B. Hastings Science Opportunities Project Description.
LCLS-II Project Overview David Schultz LCLS-II Deputy Project Director March 19, 2012.
LCLS User Access Policy
LUSI Coordination with LCLS
Experimental Facilities Planning
LCLS Ultrafast Science Instruments
LTU/Undulator Installation Status
Linac Ops Budget Review LCLS Overview / Org Structure / Legacies
WBS 5.0 LCLS Strategic Projects Division
John N. Galayda – Director of LCLS Construction March 30, 2009
LCLS History and Science Overview Keith Hodgson, SSRL Director April 23, 2002 LCLS DOE Review, April 23, 2002 Keith Hodgson, SSRL.
John N. Galayda – Director, LCLS Construction May 13, 2009
X-Ray Endstations Update
LCLS User Access Policy
Project Management Issues John N. Galayda, SLAC April 24, 2002
Project Status Review May 13-15, 2008.
John Arthur – LCLS Experimental Operations
The Transition to User Operations
PIXEL Project Status John Arthur Photon Instrumentation for
LCLS Project Transition to Operations 14 May 2008
LTU/Undulator Installation Status
Linac Coherent Light Source Project Update
Linac Coherent Light Source Transition to Operations 11 July 2007
X-Ray Endstation Design & Management/Commissioning
X-Ray Endstation Systems (XES) 2006 Schedule
LCLS Instrument MIE Project: Staffing, Schedule
LUSI Controls and Data Systems W.B.S. 1.6
Presentation transcript:

John Arthur LUSI DOE Review August 19, 2008 Transition to Operations p. 1 From construction project to operating facility Structure of the LCLS facility organization Operations and the experiment program Transition to Operations John Arthur LCLS

John Arthur LUSI DOE Review August 19, 2008 Transition to Operations p. 2 Steps in turning on the LCLS Timeline Accelerator commissioning X-ray commissioning

John Arthur LUSI DOE Review August 19, 2008 Transition to Operations p. 3 LCLS Installation and Commissioning LTU/Und/Dump Install LTU/UndComm. Re-commission Inj/BC2 to SL2 First Light in FEE PEP-II run ends FEE/NEH Install PPS Cert. LTU/Dump FEH Install CD-4 (7/31/2010) X-Rays in NEH First Light in FEH JJFFMMAAMMJJJJAASSDDJJFFMMAAMMJJJJAASSOONNDDJJFFMMAAMMJJJJ ON A A Down PPS A A M M now Linac/BC2 Commissioning FEEComm. FEH Hutch BO AMO Experiment program begins

John Arthur LUSI DOE Review August 19, 2008 Transition to Operations p. 4 Accelerator Commissioning Ground rules for transfer of new accelerator systems from construction to Accelerator Systems Div were defined in Lab Director’s memo, 12/2006 ASD SOP for control of accelerator configuration implemented from start of commissioning Staged handover of new systems Injector + BC-1 Commissioning: April 2007 start, November 2007 finish + Linac through Sector 30 Commissioning: January 2008 start, April 2008 finish + Beam Transport through Undulator and Beam Dump January 2009 start, July 2009 finish

John Arthur LUSI DOE Review August 19, 2008 Transition to Operations p. 5 X-Ray Commissioning Front End start commissioning May 2009 Near Hall start commissioning July 2009 Far Hall start commissioning February 2010

John Arthur LUSI DOE Review August 19, 2008 Transition to Operations p. 6 Organization LCLS Directorate within SLAC Structure of the LCLS Directorate

John Arthur LUSI DOE Review August 19, 2008 Transition to Operations p. 7 SLAC Organization SLAC Director P. Drell Engineering & Technical Support L. Klaisner Operations A. Merola LCLS D. Knutson SSRL J. St ö hr Particle Physics & Astrophysics S. Kahn Photon Science K. Hodgson

John Arthur LUSI DOE Review August 19, 2008 Transition to Operations p. 8 LCLS Directorate Organization LCLS Director Dale Knutson Accelerator Systems Div John Seeman Business Div Cindy Lowe Experimental Facilities Div Jochen Schneider Engineering Physics Div David Schultz Strategic Projects Div John Galayda LCLS Construction LUSI

John Arthur LUSI DOE Review August 19, 2008 Transition to Operations p. 9 Operations Budgets Staffing plans Operation goals

John Arthur LUSI DOE Review August 19, 2008 Transition to Operations p. 10 LCLS Proposed Budget Accelerator Systems FY2009: $ 96.7M(similar to FY08) Experiment Facilities FY2009: $ 2M(new money) FY2010: $ 9M

John Arthur LUSI DOE Review August 19, 2008 Transition to Operations p. 11 Accelerator Systems Budget

John Arthur LUSI DOE Review August 19, 2008 Transition to Operations p. 12 FY09FY10Long term Instrument scientists Engineering (laser, mech, elec)2630 Development scientists Detectors0.523 Computer applications2512 Technicians1434 Admin1511 Totals Photon Operations Staffing (FTE)

John Arthur LUSI DOE Review August 19, 2008 Transition to Operations p. 13 Target Running Schedule 2009: AMO, SXR 2010: AMO, SXR, XPP 2011: AMO, SXR, XPP, CXI 2012: AMO, SXR, XPP, CXI, XCS HED? (hours of operation)

John Arthur LUSI DOE Review August 19, 2008 Transition to Operations p. 14 LCLS Facility in its Science Context Advisory groups User outreach Access policy

John Arthur LUSI DOE Review August 19, 2008 Transition to Operations p. 15 LCLS Science Advisory Committee Roger Falcone UC Berkeley, USA - Chair Massimo Altarelli European XFEL Project Phil BucksbaumStanford University Robert L. ByerStanford University Hans FrauenfelderLANL Wayne HendricksonColumbia University Tetsuya IshikawaRIKEN Spring-8 Center Margaret MurnaneUniversity of Colorado-Boulder Francesco SetteESRF Sunil SinhaUCSD Dietrich von der Linde University of Essen Justin WarkOxford University C. Lewis CockeKansas State University Robert SchoenleinLBNL Philip AnfinrudNIH Geraldine RichmondUniversity of Oregon

John Arthur LUSI DOE Review August 19, 2008 Transition to Operations p. 16 LCLS/LUSI Instrument Teams SAC recommended scientific thrust areas, based on letters of intent to do LCLS science (250 signatories) Thrust areas: AMO, XPP, CXI, HED, XCS, SXR Scientists chose team leaders for each area Interface with SLAC Provide input to instrument design process Instrument scientists in regular contact with team leaders Team leaders review and accept instrument physics requirement documents Workshops have brought many team members to SLAC LCLS encourages instrument team presence from start of instrument operation

John Arthur LUSI DOE Review August 19, 2008 Transition to Operations p. 17 Instrument Team Leaders (LUSI) XPP (Instrument scientist: David Fritz) K. Gaffney (SLAC, leader) D. Reis (U. of MI) T. Tschentscher (DESY) J. Larsson (Lund Inst Tech) CXI (Instrument scientist: Sebastien Boutet) J. Hajdu (SLAC + Uppsala U, leader) H. Chapman (DESY) J. Miao (UCLA) XCS (Instrument scientist: Aymeric Robert) B. Stephenson (ANL, leader) K. Ludwig (Boston U) G. Grübel, DESY

John Arthur LUSI DOE Review August 19, 2008 Transition to Operations p. 18 AMO (Instrument scientist: John Bozek) L. Di Mauro (Ohio State, leader) N. Berrah (Western Michigan U) SXR (Instrument scientist TBD) A. Nilsson (Stanford) W. Wurth (U Hamburg) HED (Instrument scientist TBD) R. Lee (LLNL, leader) P. Heimann (LBNL) Instrument Team Leaders (non-LUSI)

John Arthur LUSI DOE Review August 19, 2008 Transition to Operations p. 19 Outreach: Web ( LCLS.slac.stanford.edu )

John Arthur LUSI DOE Review August 19, 2008 Transition to Operations p. 20 Information on LCLS instruments

John Arthur LUSI DOE Review August 19, 2008 Transition to Operations p. 21 User site (LCLS.slac.stanford.edu/USER/) “Proposals for experiments using the AMO station must be submitted by September 1, 2008.” “During 2010 it is anticipated that the spectral range of the LCLS will be extended to 8 keV. A call for proposals for XPP will be issued in early 2009.”

John Arthur LUSI DOE Review August 19, 2008 Transition to Operations p. 22 LCLS Users Organization First met at 2007 LCLS Users Meeting Elected an Executive Committee A. Barty (LLNL) R. Lee (LLNL) L. Young (ANL) First task: create charter Draft in circulation

John Arthur LUSI DOE Review August 19, 2008 Transition to Operations p LCLS/SSRL Users Meeting Oct 15-18, 2008

John Arthur LUSI DOE Review August 19, 2008 Transition to Operations p. 24 User Access Policy All instruments are managed by LCLS Every experiment starts with a proposal Beam time allocated primarily on scientific merit Some time reserved for instrumentation proposals Small fraction reserved for Director’s discretion & in-house research Special, limited-time arrangements of preference for LCLS/LUSI instrument team Groups making significant additions of general utility to LCLS can negotiate limited-time preference

John Arthur LUSI DOE Review August 19, 2008 Transition to Operations p. 25 Summary LCLS operations organization is taking shape User outreach is progressing well User policy encourages and supports widespread accessibility LCLS is open for business