Traffic Noise Analysis Workshop October 17, 2007.

Slides:



Advertisements
Similar presentations
Presented by: Mike Sisson February 23, It is the Law The Americans with Disabilities Act of It is the Right Thing to do Provide Equal Access.
Advertisements

Interim Guidance on the Application of Travel and Land Use Forecasting in NEPA Statewide Travel Demand Modeling Committee October 14, 2010.
Worked Example: Highway Safety Modeling. Outline –Safety Modeling »Safety Modeling Process –Set-up for Worked Example –Develop / Build Safety Model »Project.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
Interactive Highway Safety Design Model (IHSDM)
Paul M. Kohler Noise Abatement Program Manager INTERSTATE 95 EXPRESS LANES FUNDAMENTALS OF TRAFFIC NOISE.
TRAILS AS TRANSPORTATION Design & Construction Michael J. Kubek, P.E. Ohio Department of Transportation, District 12 Production Administrator.
Environmental Assessment Public Meeting
Interchange Design Nick Hoernke, Bill Roth and Eric Sorensen.
HERO UNIT Training Module Work Zone Traffic Control And Incident Management Operations.
Spring INTRODUCTION There exists a lot of methods used for identifying high risk locations or sites that experience more crashes than one would.
I-65 Added Travel Lanes Project in Tippecanoe County
CE 453 Lecture 7 Noise Analysis See: and
Environmental Justice: Policies, Guidance, and Answers to Frequently Asked Questions FTA Region VII Civil Rights Training.
1 Risk Assessment Develop Objectives And Goals Develop and Screen Cleanup Alternatives Select Final Cleanup Alternative Communicate Decisions to the Public.
Noise Assessment Brett Williams. Scope The measurement of the existing ambient noise (day and night time). A noise study of the future impact during construction.
 Life in communities has changed over the years.  One of those changes is in transportation. Transportation is a way of moving people or things from.
What’s HOT in DOT Noise Policy Revisions? Mia Waters Washington State Department of Transportation TRB ADC40, Transportation Related Noise & Vibration.
Implementing Noise Compatible Land Use  Federal Highway Administration  Lesson 1 Roadway Noise and FHWA Guidelines.
Intersection & Interchange Geometrics (IIG) Innovative Design Considerations for All Users Module 8 Intersection- Interchange Evaluation Process.
Best Practices Related to Research Problem Identification, Scoping, and Programming: A Researcher’s View Martin Pietrucha, Director The Thomas D. Larson.
DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Joint Communications Release JSF Program Office & Lockheed Martin Subject:
Old Policy – which no one ever seem to have heard of.
Barrington Road at Jane Addams Memorial Tollway (Interstate 90) Interchange Improvement Study Hoffman Estates Village Hall June 27, 2012.
Meeting Agenda Stakeholder Participation Panel July 14, 2003 Welcome/Introductions Study Overview Tasks/Products/Schedule Traffic Patterns Break Key Project.
Center for Risk Management of Engineering Systems University of Virginia, Charlottesville 26 Schedule.
IRRPCC Meeting Albuquerque, NM November 8,  Clarification needed on applicability of these roads into the IRR Inventory  Assignment given to IRRPCC.
Roundabout Study and Design EDSM Revisions
Community Development Department ISLAND WALK MASTER PLANNED DEVELOPMENT APPLICATION #2648.
1 Context Sensitive Solutions For Designing Urban Thoroughfares Brian Bochner Senior Research Engineer Texas Transportation Institute Brian Bochner Senior.
Highway Location Study CE 453 Lecture 4 See also lab 2 and lab 4 instructions, and EIS lecture notes See also 04 DOT development process.doc Refs:
BASICS IN IRRIGATION ENGINEERING 2.1. Planning Irrigation systems 2.2. soil-plant-water relation – over view 2.3. Crop water requirement 2.4. Base, delta.
Introduction Session 01 Matakuliah: S0753 – Teknik Jalan Raya Tahun: 2009.
Data Palooza Workshop May 9, 2013 Rabinder Bains, FHWA – Office of Policy and Government Affairs.
Chapter 13: Weaving, Merging, and Diverging Movements on Freeways and Multilane Highways Chapter objectives: By the end of these chapters the student will.
STRATEGIC ENVIRONMENTAL ASSESSMENT METHODOLOGY AND TECHNIQUES.
Strategic Highway Research Program 2 Project L07 Identification and Evaluation of the Cost- Effectiveness of Highway Design Features to Reduce Nonrecurrent.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
1 Federal Highway Administration, USDOT The Final Rule on Work Zone Safety and Mobility Updates to 23 CFR Section 630, Subpart J Presented by Tracy Scriba,
The Fargo/Moorhead Area Interstate Operations Study Opportunities and Planned Activities Presentation for the Mn/DOT Travel Demand Modeling Coordinating.
CHAPTER 4 ALTERNATIVES. --- “The driving impetus for conducting environmental impact studies is to comparatively present the effects of proposed alternatives.
REMOTE SENSING and the CSX RAIL RELOCATION EIS NCRST-E GICAP 2002 Workshop Session 3.
State Route 109 (Portland Bypass) Robertson & Sumner County, TN NEPA Public Hearing November 12, 2015.
Tools for Expedited Regional Transportation Noise Modeling Jim Cowan and Ken Kaliski Resource Systems Group, Inc. White River Junction, VT.
Preparing the Phase 0 Proposal What in the world are the proposal reviewers looking for?
Highway Safety Analysis: Engineering Kenneth Epstein, P.E. Federal Highway Administration Office of Safety Programs Safety Data and Analysis Tools Workshop.
TRANSPORTATION ALTERNATIVES PROGRAM 2016 Project Scoring Update Workshop.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 9 January 19, 2016.
Texas Department of Transportation Corpus Christi District U.S. 181 (Harbor Bridge) Environmental Documentation and Schematic Development Citizens’ Advisory.
Geometric Design: General Concept CE331 Transportation Engineering.
How are Highway Designs Actually Represented in Surface Models for Automated Machine Guidance and How Should We Control Them? Alan Vonderohe Construction.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Public.
POLK RAIL QUIET ZONE ANALYSIS Conditions Assessment CSX “S” Line March 24, 2016.
Connecting South Dakota and the Nation Access Management Training Brooke White, Access Management Engineer.
PURPOSE & NEED Categorical Exclusion Training Class.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
Iron Range Tourism Bureau April 25, 2013 Hwy 53 Update.
DETECTION AND ASSESSMENT OF SAFETY PROBLEMS WITHIN ROAD TRANSPORT DECISION MAKING Prof. Dr. Nikolay Georgiev eng. Violina Velyova ‘Todor Kableshkov’ University.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Network Optimization Executive Seminar Track 1, Session A
Project Management Team Meeting #3
Draft Transportation Element September 6, 2017
Workshop Presentation
NORTH TRUNK SEWER REPLACEMENT PROJECT
I-94 Maple Grove to Rogers Community Noise Engagement Meeting #1
Lower Makefield Township Community Meeting
Geometric Design: General Concept CE331 Transportation Engineering.
Balanced Approach to Noise Mitigation
LIONS BAY MITIGATION PROGRAM
Balanced Approach to Noise Mitigation
Presentation transcript:

Traffic Noise Analysis Workshop October 17, 2007

 This Workshop was created to provide an overview and greater insight into how Traffic Noise Analysis is conducted for highway projects.  No specific discussions regarding the anticipated results of the NE Extension Widening Project Final Noise Results will occur during this workshop.  The workshop will conclude with a Question/Answer session. What is the Purpose of this Workshop? 1

Policy Overview  Legal basis for performing Traffic Noise Analyses:  Federal – FHWA Title 23 CFR Part 772;  State – PennDOT Publication #24, Project Level Highway Traffic Noise Handbook, May 2007;  PTC follows the established Federal and State policies;  These resources are available on-line and can found by accessing the PTC’s website: 2

 Type I Projects:  Highway Projects that would: 1) Construct a highway on a new location; 2) Increase number of through-traffic lanes or; 3) Physically alter an existing highway in a way that significantly changes the horizontal or vertical alignments.  Type II Projects:  Also referred to as “Retrofit Projects”: 1)Proposes noise abatement for existing highways without the improvements listed above. Source: Making Sound Decisions About Highway Noise Abatement – PennDOT & FHWA What are the Types of Noise Projects? 3

Noise Abatement Consideration  Highway noise abatement analysis employs a three-step process for determining when and where mitigation would be proposed for a project: Warranted 1) Warranted; Feasible 2) Feasible; Reasonableness 3) Reasonableness. 4

Typical Traffic Noise Analysis Methodology  Identification of noise-sensitive land use in the corridor. 5

 What is a NSA?  A NSA is an organizational tool comprised of subjective boundaries based on common noise source elements and geographic proximity.  Typically extends 500 ft from the edge of the highway shoulder;  Example: choose roadway segments (overpass) as a logical termini since they provide a break in an acoustically designated zone.  How is a NSA Delineated? Noise Sensitive Areas (NSA) 6

7 Sample Project Area

8 Sample Project Area Showing N oise S ensitive A reas NSA ANSA B NSA CNSA D

 24-hour Noise Monitoring to determine peak traffic noise hours.  Short-term noise monitoring:  Purpose – to assist in the development of a traffic noise model.  Performed during peak traffic noise hours or equivalent periods (derived from 24-hour data). Typical Traffic Noise Analysis Methodology 24-hr vs. Short-Term Monitoring 9

How are Monitoring Sites selected?  Based on land use.  Sites typically represent land use that is acoustically dominated by traffic noise from the subject roadway: Ex:1 st row receptor vs. 2 nd row receptor.  Identify individual monitoring sites that could present anomalies within the NSA.  Other sites potentially included to assist in noise model calibration. Typical Traffic Noise Analysis Methodology 10

11 NSA ANSA B NSA CNSA D Sample Project Area Showing N oise S ensitive A reas

12 NSA ANSA B NSA CNSA D Sample Project Area Showing N oise S ensitive A reas and Monitoring Sites

Data collected during short-term monitoring period:  Traffic counts and classifications from nearby roadways;  Site sketches to accurately show location of noise monitoring site;  Weather conditions;  Seasonal consideration;  Ambient noise sources other than traffic noise;  Irregular noise events during the monitoring period (low-flying planes, dogs barking, etc). Typical Traffic Noise Analysis Methodology 13

Sample Noise Monitoring Meter at Monitoring Site 14

Example Monitoring Site Sketch Form 15

 Noise Modeling  What is the Purpose?  Development of an accurate noise model allows prediction of present-day and future case noise levels.  Model is also used to develop mitigation alternatives if mitigation is warranted. Typical Traffic Noise Analysis Methodology 16

 Model Calibration  FHWA Traffic Noise Model (TNM) is a state-of-the-art analytical computer program used for predicting noise impacts in the vicinity of highways operating throughout the country.  FHWA TNM was developed and validated through the U.S. Department of Transportation’s John A. Volpe National Transportation Systems Center, Acoustics Facility.  This program replaces the prior FHWA-approved noise model STAMINA/OPTIMA. Typical Traffic Noise Analysis Methodology 17

 TNM Inputs  3-D representation of roadways – digitized from engineering design files;  Observed traffic counts and classifications for subject roadways;  Significant topography, represented as 3-D terrain lines;  Other features that affect sound wave propagation such as irregular ground zones, median barriers, shoulder barriers, etc. Typical Traffic Noise Analysis Methodology 18

 If the model accurately predicts sound levels within 3 dBA of the monitored levels, the model is considered calibrated.  3 dBA is mandated as this represents the typical change in dBA detectable to the human ear.  If the model cannot duplicate the monitored sound levels, this can be rectified by checking for dominant ambient noise sources other than traffic or resolved by re-monitoring sites. Typical Traffic Noise Analysis Methodology 19

Prediction of Existing and Future Worst-case traffic noise levels:  Purpose – to determine if noise abatement consideration is warranted.  Calibrated model used as basis for other models.  Significant changes incorporated to predict existing and future noise levels. 20 Typical Traffic Noise Analysis Methodology

Existing/Future No-Build case:  Yearly worst-case peak-hour traffic volumes and compositions are used in place of field observed numbers.  Traffic Data projected 20 Years in Future is used to establish future conditions. Future Build case:  Future worst-case peak-hour traffic volumes and composition;  Geometric alterations of the roadway footprint/elevation/configuration;  Significant changes to terrain or other features that affect traffic noise propagation. 21 Typical Traffic Noise Analysis Methodology

warranted  Comparison of existing and future predicted noise levels to determine if mitigation investigation is warranted:  Noise levels approach or exceed 67 dBA (defined as 66 dBA or greater);  Significant increase of future noise levels above existing (>10 dBA increase). 22 Typical Traffic Noise Analysis Methodology

Mitigation Investigation warranted feasibilityreasonableness  If warranted, sites are reviewed to determine the feasibility and reasonableness of mitigation.  Accomplished by assessing the TNM Barrier configurations of the future-case Noise Model.  Model amended to reflect potential 3-D barrier configurations.  Barrier configurations can be manipulated in the model by changing location, length, and height to achieve optimal noise level reduction for impacted sites. Typical Traffic Noise Analysis Methodology (continued) 23

Feasibility Feasibility requirements:  Can mitigation provide a minimum of 5 dBA reduction in noise levels at the majority of impacted sites?  Can mitigation be designed and physically constructed at the appropriate location?  Will the mitigation create a safety problem?  Will mitigation restrict access for vehicular or pedestrian travel?  Will the placement of the mitigation make it inaccessible for maintenance?  Will the barrier impact utilities or drainage? Typical Traffic Noise Analysis Methodology (continued) 24

Reasonableness Reasonableness requirements:  Cost/benefit analysis to determine if effective mitigation falls within cost limitations;  FHWA allows for up to $50,000 per benefited residence and Pennsylvania has adopted this maximum number;  Who are the benefited residences? * Impacted Sites – minimum of 3 dBA insertion loss. * Non-impacted sites – minimum of 5 dBA insertion loss.  If the total cost of mitigation is less than or equal to $50,000 per benefited residence, than mitigation is considered reasonable. Typical Traffic Noise Analysis Methodology Cont. 25

26 Representative Sample Area: Benefited vs. Non-Benefited Sites Impacted and Benefited 1. Noise levels exceed Noise Abatement Criteria 2. Receive a minimum of 3 dBA noise reduction due to mitigation Benefited 1. Noise levels do NOT exceed Noise Abatement Criteria 2. Receive a minimum 5 dBA noise reduction due to mitigation

28 Final Design Measures 16 1.Focus is on identifying detailed mitigation for NSAs meeting the warranted/feasible/reasonable requirements; 2.Verify land usage consistency from prior design phase; 3.Duplicate and expand noise monitoring effort performed in preliminary design phase; 4.Develop highly detailed noise models to meet final design specifications; 5.Determine extent of sites warranting noise abatement;

Final Design Measures (continued) 16 6.Perform mitigation investigation to determine feasibility and reasonableness for sites warranting abatement consideration; 7.Provide an opportunity for public involvement for those communities anticipated to qualify for a barrier. This includes the opportunity to vote on whether or not a barrier is desired and, if so, to provide input on the residential-side color and texture of the barrier; 8.Proposed abatement will be reviewed with design engineers to develop the Type, Size and Length (TS&L) Package. This package will contain detailed schematics showing location of caissons, individual panel heights, and aesthetic treatments to be used for the noise barriers.

30 Questions & Answers 16