Categorically, Demand It on Your Schedule: You Con-Du-It in Autodesk® Revit® MEP Martin Schmid, P.E. Industry Success Manager, Autodesk.

Slides:



Advertisements
Similar presentations
Construction Documents and Details
Advertisements

© 2012 Autodesk CI5180-V Hydraulics and Hydrology: Autodesk® Infrastructure Design Suite Tools in Your Toolbox Dino Lustri, P.E., P.S. Civil Engineering,
© 2011 Autodesk Capitalize on Corridor Improvements in AutoCAD ® Civil 3D ® Don Quinn Civil Engineer / Eagle Point Product Specialist.
© 2012 Autodesk MP Finally, Electrical Schematics and Local Standards Support in Autodesk® Revit® MEP Marseille BELTREY Product Manager, ALPI Julien.
© 2010 Autodesk Autodesk Structural Curriculum 2013 Unit 1: Introduction to Structural BIM Building Information Modeling.
© 2012 Autodesk CM6070-V Extend Revit Server with IMAGINiT Clarity Beau Turner Product Director.
© 2012 Autodesk Conceptual and Design Workflows Using Autodesk ® 360 Integrated Applications Anirban Ghosh Principal User Experience Designer – DLS Mobile.
© 2011 Autodesk Autodesk® Revit® MEP: Fast Families for Engineers David Butts BIM Specialist – Gannett Fleming.
Scripting Components for AutoCAD Plant 3D
Using Autodesk® Revit® Structure in Investigative Engineering Desirée Mackey, PE Structural Engineer / BIM Manager, Martin/Martin Brian Mackey BD Mackey.
© 2011 Autodesk Living the Dream: How to Automate Common Workflows and Tasks for Mechanical Engineers Plamen Hristov Virtual Design Manager.
© 2012 Autodesk Autodesk® Revit® Structure: From Design to Detailing and Fabrication to Construction Allen Levy Applications Specialist.
© 2012 Autodesk Autodesk 360 Jerry Campbell VDC Consultant.
Get Connected Autodesk Revit MEP Connectors Demystified Shawn C. Zirbes Chief Technical Officer Image courtesy of Hobart, Yañez, Ramos, Maguey, and Martínez.
Quality Control for Autodesk® Revit® MEP Models
© 2012 Autodesk The Devil Is In The Workflow Module 1: Successfully Plan and Implement BIM Luis Rojas Building Design Product Line Manager, Eagle Point.
© 2012 Autodesk Project Architect-Times-a-Changing: How to transition from yesterday to today Christopher Ozog Project Architect.
© 2012 Autodesk AutoCAD on Electrical Steroids Randy Brunette Electrical Subject Matter Expert (Autodesk)
© 2012 Autodesk Autodesk® Revit® MEP Templates: Increasing Productivity Plamen Hristov Director of Design Technology Capital Engineering Consultants, Inc.
Join us on Twitter: #AU2013 Roundtable: Electrical in a 3D World Randy Brunette Electrical Subject Matter Expert Janna Spicer Product Manager, Mechanical.
© 2012 Autodesk Matthew Stuver, LEED AP BD+C BIM Manager Dynamix Engineering Ltd. MP1425-R: AU2012 AutoCAD® Revit® MEP Family Reunion.
© 2012 Autodesk How to Get the Most from Integrated Project Delivery (IPD) David J. Patera Team Project Manager & VDC Coordinator.
© 2012 Autodesk Autodesk Structural Curriculum 2013 Unit 5: Advanced Structural Analysis & Coordination Advanced Structural Analysis & Coordination.
© 2012 Autodesk Autodesk Structural Curriculum 2013 Unit 2: User Interface Autodesk® Revit® Structure Software User Interface.
© 2012 Autodesk Can I Survive Using Autodesk® Revit® MEP for Major Renovation Work? Jason Boehning Author/Instructor 4D Technologies –
© 2012 Autodesk From Nothing to Something using AutoCAD ® Electrical Todd Schmoock Solutions Engineer - Synergis Technologies, Inc.
Rockin’ Hot Revit MEP 2011 Tips David Butts BIM Analyst – MEP – Gannet Fleming Image courtesy of Hobart, Yañez, Ramos, Maguey, and Martínez.
© 2012 Autodesk Adding Instrumentation and Electrical Capabilities to Autodesk® Plant Design Suite Andy Bonfield.
© 2012 Autodesk Autodesk® Revit® MEP: Get Current with Electrical Engineering Module 1 – Dual Circuiting Seth Mathis Schmidt Associates BIM Designer.
© 2011 Autodesk Autodesk® Revit® MEP: Not Enough Content - What is the Problem Again? Plamen Hristov Virtual Design Manager.
© 2012 Autodesk Parametrics Master Class Martin Duke Business Systems Manager.
© 2012 Autodesk Ask the Experts – International CAD Managers panel Martin Duke, with Stewart Smith, Steve Fiorio and Devon Middleditch Business Systems.
© 2012 Autodesk Chutes and No Ladders – Using Inventor Professional’s Tube and Pipe For Facilities Design Mike Jolicoeur Field Product Manager, Factory.
Join us on Twitter: #AU2014. Class summary text goes here Class summary.
© 2012 Autodesk Sweet Suite Collaboration Module 1: Suite Interoperability Veronica Lamb Technical Specialist, US CAD of Hawaii.
© 2012 Autodesk Customizing AutoCAD P&ID David Wolfe Process and Power Specialist.
© 2012 Autodesk AB1851 Optimizing the Design Development Stage using Revit Architecture Douglas Bowers, AIA, LEED AP BD+C Doug Bowers Consulting, LLC.
Join us on Twitter: #AU2013.  An appropriate image has been provided for your presentation based on the AU look and feel  You can replace the Title.
© 2011 Autodesk AC2182 P - Autodesk 3ds Max for Starters Create Stunning Renderings For All Situations Christopher Fernandez Senior Applications Specialist,
© 2012 Autodesk The Picture Says It All: Commercial Site Plan 3D Visualizations Using Autodesk® IDS John Sayre Civil Application Engineer.
© 2012 Autodesk Autodesk Structural Curriculum 2013 Unit 3: Modeling for Building Structures Building Information Modeling.
© 2011 Autodesk The Suite Life of AutoCAD® Guillermo Melantoni Sr Product Manager: Workflows and Interoperability at Autodesk.
© 2012 Autodesk SM3595-R | Thinking of Design, Engineering, and Simulation Differently! Luke Mihelcic Product Marketing Manager | ISM – Simulation Industry.
© 2012 Autodesk Collaboration Systems – It’s good to share Martin Duke Business Systems Manager.
© 2012 Autodesk PL Autodesk ® PLM 360 for the AEC Space Klaus Lörincz PLM Product Manger Autodesk Frank Schley Development & Pilot Projects Ed. Züblin.
© 2014 Autodesk Getting started with Desktop Subscription.
© 2011 Autodesk The Autodesk® Revit® Theory of Relativity: Understanding Shared Coordinates Paul F. Aubin Author/Consultant.
© 2011 Autodesk Publish Autodesk® Inventor® Building Components for Consumption in AutoCAD® MEP and Revit® MEP Jay Ayala Solutions Engineer.
© 2012 Autodesk From CAD to Awesome: AutoCAD® and Autodesk® SketchBook® Designer Guillermo Melantoni Product Line Manager: Personal Design & Fabrication.
Making Use of Substation Design Models for Project Estimating Trevor Scullion Managing Director, Automationforce inc.
1.Click on the link below, this will open your web browser 2.Use “Extended Display” to project the.
© 2016 Autodesk What’s New in Autodesk ® AutoCAD Electrical 2017 Gaurav Sachdeva Product Manager.
Managing the Construction Administration Phase in Autodesk® Revit®
AB2623-Triage for Your Autodesk Revit Family
Water! Water! Quenching Your Thirst for Water in AutoCAD® Civil 3D®
Step it up a Rung from AutoCAD® Designs to AutoCAD® Electrical (MA4762-L) Todd Schmoock Solutions Engineer - Synergis Technologies, Inc.
Autodesk® Revit® Rendering Tips You Can Use
Creating Intelligent Details in Autodesk® Revit®
Check Out These ‘Suite’ Workflows
Using Quantity Takeoff and Linked Models in Revit to Estimate a Project as the Design Changes Kevin R. Miller, Brigham Young University Scott Davis & TJ.
Autodesk Navisworks: Practical Tips and Tricks from Seven Years in the Construction Industry Josh Lowe Project Lead, TURIS Systems.
AB6105-V: Autodesk® Revit® Reality Check for Residential Construction
EET 323 – Electrical System Design Lecture 1: Introduction to Electrical System Design Radian Belu, PhD.
BIM for Interiors: Making Autodesk® Revit® Work for You
MP1483 Massing and using Architecture Models for Revit MEP 2013 Analysis Simon Whitbread Application Specialist.
The Family Lab Harlan Brumm Product Support Technical Lead.
EET 323 – Electrical System Design Lecture 3: Load Characteristics
Using Quantity Takeoff and Linked Models in Revit to Estimate a Project as the Design Changes Kevin R. Miller, Brigham Young University Scott Davis & TJ.
Beyond Massing: Conceptual Design in Autodesk® Revit® Architecture 2012 David Fano Partner | CASE Design, Inc |
Presentation transcript:

Categorically, Demand It on Your Schedule: You Con-Du-It in Autodesk® Revit® MEP Martin Schmid, P.E. Industry Success Manager, Autodesk

Load Categories Typically, Demand Factors are assigned on a per category basis. I.e., a demand factor ‘rule’ is associated with Elevators, and a separate rule applies to Receptacles. Thus, each load is assigned a Load Category. Each Load Category is assigned a Demand Factor (rule). Multiple Load Categories can use the same Demand Factor rule. For example, you may associate the Lighting category and the Electric Heat category with a single Continuous Demand Factor rule… or, you can create separate Demand Factor rules for each. You can only associate one Demand Factor rule with a load Category, but the Demand Factor rules are flexible and let you associate multiple factors with the rule.

Demand Factors Demand factors are adjustments to the Connected Load to account for physical phenomenon, and affect the Calculated (or Demand) Load on Equipment. Why kind of physical phenomenon? greater Inrush Current – when a motor starts up, it draws more current (to overcome inertia) to get the motor running. Once the motor is running, the ‘nameplate rating current’ is drawn. Thus, the Demand is greater than the Connected. greater Heat – as current is drawn through a conductor, over time, heat accumulates. Thus for continuous loads, the Demand is greater than the Connected to provide a ‘buffer’. less Usage – things like receptacles, elevators, commercial kitchen equipment, etc, are not all likely to be used at the same time. Thus, factors are prescribed that allows the Demand to be less than the Connected load.

Electrical Connectors – Load Classification

Constant

Example: Lighting – 125% C: Connected D: Demand P1A C: 10kVA D: 12.5kVA P1B C: 6kVA D: 7.5kVA P2A C: 12kVA D: 15kVA P2B C: 8kVA D: 10kVA P1 C: 16kVA D: 20kVA P2 C: 20kVA D: 25kVA DP C: 36kVA D: 45kVA

By Quantity / Total

Example: Elevators C: Connected D: Demand Factor P1 C: 3 elev D: 0.90 P2 C: 4 elev D: 0.85 DP C: 7 elev D: 0.77 Qty of Elevators Demand Factor

By Quantity / Total Limitation NEC : “In no case shall the feeder or service calculated load be less than the sum of the largest two kitchen equipment loads.” In most cases not an issue. I.e., other loads will bring up the calculated load. Load Qty23 Load Load Load Sum Factor100%90% Result

By Quantity / Incrementally

Example: Farm Load C: Connected D: Demand Factor P1 C: 60kVA D: 51.5kVA P2 C: 30kVA D: 27.5kVA DP C: 90kVA D: 68kVA QuantityDemand Factor kVA 100%100% 20kVA 75%65% 10kVA 65%50% 20kVA 100%75% 10kVA 75%50% Italics Italics indicate what the ‘parent’ panel sees. P1 CDFD P2 CDFD DP CDFD

By Load / Total

Greater ThanLess Than or Equal % Demand Factor 0kVA10kVA100 10kVA20kVA90 20kVAunlimited80 P1A C: 6kVA D: 6kVA (100%) P1B C: 12kVA D: 10.8kVA (90%) P2A C: 9.5kVA D: 9.5kVA (100%) P2B C: 10.5kVA D: 9.45kVA (90%) P1 C: 18kVA D: 16.2kVA (90%) P2 C: 20kVA D: 18kVA (90%) DP C: 38kVA D: 30.4kVA (80%) C: Connected D: Demand No real-world example to my knowledge By Load Total

By Load / Incrementally

Greater ThanLess Than or Equal % Demand Factor 0kVA10kVA100 10kVAunlimited50 P1A C: 6kVA D: 6kVA (100%) P1B C: 12kVA D: 11kVA (91.7%) P2A C: 9.5kVA D: 9.5kVA (100%) P2B C: 10.5kVA D: 10.25kVA (97.6%) P1 C: 18kVA D: 14kVA (77.7%) P2 C: 20kVA D: 15kVA (75%) DP C: 38kVA D: 24kVA (63.2%) C: Connected D: Demand Receptacles

Motor Loads Any load can be a motor load (i.e., Elevator) See subclassification-motor-parameter.html#tp for how to map the parameter (this must be mapped for the functionality to work.). subclassification-motor-parameter.html#tp If the load is the largest motor load, it is deducted from its Load Category total, and associated with the Motor category. Note: In some cases, this may result in a conservative calculation. I.e., for Elevators, this would mean there is one less elevator, thus a greater factor being applied. The Demand Factor rule associated with the Motor category will then be applied accordingly.

Motor Loads The largest motor connected to each component in the distribution system is increased per the Motor load category (which, by default, is associated with the Motor Demand Factor).

Limitations Non-Coincident Loads : Five pumps, two as backup, for example. Non-Coincident Load Types : Heating vs. Cooling where building is in only one ‘mode’ or the other. Not designed for residential applications (i.e., where loads are based on a per-area basis) Demand is ALWAYS computed at the Panel (not on the circuit). Sample from “The Electricity Wiring Regulations 2007”, published by the Regulation and Supervision Bureau for the Water, Wastewater and Electricity Sector in the Emirate of Abu Dhabi. The basis of this document is the IEE Wiring Regulations (BS 7671)

Autodesk [and other] are registered trademarks or trademarks of Autodesk, Inc., and/or its subsidiaries and/or affiliates in the USA and/or other countries. All other brand names, product names, or trademarks belong to their respective holders. Autodesk reserves the right to alter product and services offerings, and specifications and pricing at any time without notice, and is not responsible for typographical or graphical errors that may appear in this document. © 2010 Autodesk, Inc. All rights reserved.