27-March-10 LCWS10 - Beijing Global Design Effort 1 Barry Barish LCWS10 - Beijing 27-March-10 “Cost Containment” for the TDR.

Slides:



Advertisements
Similar presentations
Industry and the ILC B Barish 16-Aug May-05ILC Consultations - Washington DC2 Why e + e - Collisions? elementary particles well-defined –energy,
Advertisements

“The Other Issues” II Moving Forward in Uncertain Times: Clearly, with reduced/loss of funding in the US and the UK, a timeline of 2010 for an EDR is unrealistic.
GDE Meeting B Barish 16-Aug-05 The GDE – who, what and how? The BCD – what is it? Internal Organization toward BCD What do we want out of Snowmass? How.
View from the NSF: Later Years J. Whitmore (EPP-PNA) M. Pripstein (LHC) M. Goldberg, J. Reidy (EPP) LEPP – CLEO CESR Symposium at Cornell, May 31, 2008.
Optimism R&D to be resumed! Three beam tests planned at Kek, –Hybrid target (KEKB Linac) –Liquid target (ATF Linac) –Boron-Nitride Window (KEKB) –(Starting.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
Global Design Effort BDS KOM Opening remarks/comments from EDR Project Management SLAC Marc Ross / Nick Walker.
Towards an International Linear Collider Barry Barish GDE 6-June-07.
Report from GG5, Dec. 20, 2005 Report from ILC GG 5: Cost and Engineering (Updates since Snowmass) Wilhelm Bialowons, Peter Garbincius and Tetsuo Shidara.
Nick Walker, Brian Foster LAL, Orsay WP2: Coordination with the GDE.
Our mandate has been completed The physics and detector perspective of the ILC-TDR Sakue Yamada May 27, /05/271Sakue Yamada ECFA.
P5 and the HEP Program A. Seiden Fermilab June 2, 2003.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
Atsuto Suzuki. 1. Toward ILC Construction : Japanese Activities 1. Toward ILC Construction : Japanese Activities.
Status Update Outline  General remarks - reminder  Progress since last Annual Meeting – June 2010  Next steps - timeline EUROnu Costing Ilias Efthymiopoulos.
30-May-07 LCWS DESY Meeting Global Design Effort 1 A Vision of the Future RDR to ILC Barry Barish LCWS DESY 30-May-07.
WWSWWS Next steps for Detectors by F. Richard LAL/Orsay TILC08 TILC08 Joint ACFA Physics and Detector Workshop and GDE meeting on ILC, 3-6 March 2008,
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
1-Feb-08 P5 Global Design Effort 1 GDE - ILC Barry Barish P5 Meeting - Fermilab 1-Feb-08.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
Recommendations on the scientific programme The PAC endorsed the main lines of the proposed long-term programme. The draft document is expected.
ILC – Recent progress & Path to Technical Design Report Brian Foster (Hamburg/DESY/Oxford & GDE) Plenary ECFA CERN 25/11/11.
14-Nov-11 PAC - Prague Global Design Effort 1 Barry Barish PAC - Prague 14-Nov-11 Global Design Effort Director’s Report Grooved Insert for CesrTA Wiggler.
RD’s Report on Detector Activity General Overview Project Advisory Sakue Yamada December 14, 2012 Sakue Yamada.
1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
Global Design Effort DR Session Introduction S. Guiducci (LNF) ILC10, Beijing 27 March 2010.
Report from ILCSC Shin-ichi Kurokawa ILCSC Chair LCWS06 at IISc Bangalore March 9, 2006.
Report from ILCSC Shin-ichi Kurokawa KEK ILCSC Chair GDE meeting at Frascati December 7, 2005.
Status Report on ILC Project in Japan Seiichi SHIMASAKI Director, Office for Particle and Nuclear Research Promotion June 19, 2015.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
A Satellite Meeting at IPAC-2010 SCRF Cavity Technology and Industrialization Date : May 23, 2010, a full-day meeting, prior to IPAC-2010 Place: Int. Conf.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
Management’s preliminary comments to the ERC Report FINANCE COMMITTEE June 19, 2002.
Global Design Effort WG-1: Cost Reduction Studies Nick Walker John Carwardine Tetsuo Shidara.
Introduction and Charge Barry Barish GDE Meeting Frascati 7-Dec-05.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
19-May-11 PAC Mtg - Taiwan Global Design Effort 1 Barry Barish PAC Meeting Academia Sinica, Taiwan 19-May-11 GDE Director’s Report Grooved Insert for CesrTA.
Conventional Facilities and Siting GG Global Design Effort BILCW 07 - Beijing1 Conventional Facilities and Siting Global Group Summary Report.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Americas comments on Linear Collider organization after 2012 P. Grannis, for LCSGA – Aug. 24, 2011 ILCSC GDE.
Top-Level Change Control (TLCC) Process by which specific themes from SB2009 will be developed and refined –Extension of established AD&I process Formal.
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
Global Design Effort1 September 20-22, 2006 MAC Review Response to 1 st MAC Mtg Barry Barish GDE.
Project X Collaboration Plan Steve Holmes Accelerator Advisory Committee Meeting May 6-8, 2008.
PM Report AS ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design –Marc.
Summary: Site Discussion Jonathan Dorfan SLAC Plenary Session, June 6, 2008.
RD’s Report SiD Group Sakue Yamada December 14, 2011 (remote participation) 2011/12/141SiD-meeting Sakue Yamada.
The ILC Outlook Barry Barish HEP 2005 Joint ECFA-EPS Lisbon, Portugal 23-July-05.
January 9, 2006 Margaret Votava 1 ILC – NI/FNAL/ANL Brief overview of Global Design Effort (GDE) plans, dates, and organization: –Changes since Industrial.
The categories for ILC budget planning are: R&D – work done in laboratories to develop and verify subsystem components. This supports the cost reduction.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Workshop summary Outline  Workshop’s aims  Highlights from the presentations (my selection!)  Costing Exercise – What we learnt  Summary - Roadmap.
AS Webex meeting – January 27, 2010
PM Report CFS /Gbl ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design.
July 11, 2008M Ross for PM - ILC GDE - ILCDR08 closeout 1 GDE Program for the ILC Technical Design Phase Marc Ross for: Akira Yamamoto, Nick Walker GDE.
Conventional Facilities and Siting Global Group (ARCFS)
Oct 22 Group Leaders Planning meeting
Barry Barish LCWS10 - Beijing 26-March-10
Upgrade Strategy for the Experimental Vacuum Systems
Technical Design Report preparation
Stan Whitcomb LSC meeting Livingston 21 March 2005
Barry Barish LCWS10 - Beijing 26-March-10
Barry Barish JSPS - Sendai 12-Sept-11
Barry Barish Paris ICHEP 24-July-10
DR Session Introduction
Presentation transcript:

27-March-10 LCWS10 - Beijing Global Design Effort 1 Barry Barish LCWS10 - Beijing 27-March-10 “Cost Containment” for the TDR

27-March-10 LCWS10 - Beijing Global Design Effort 2 RDR Design & “Value” Costs Summary RDR “Value” Costs Total Value Cost (FY07) 4.80 B ILC Units Shared B Units Site Specific K person-years (“explicit” labor = 24.0 M person- 1,700 hrs/yr) 1 ILC Unit = $ 1 (2007) The reference design was “frozen” as of 1-Dec-06 for the purpose of producing the RDR, including costs. It is important to recognize this is a snapshot and the design will continue to evolve, due to results of the R&D, accelerator studies and value engineering The value costs have already been reviewed three time 3 day “internal review” in Dec ILCSC MAC review in Jan International Cost Review (May) Σ Value = 6.62 B ILC Units

27-March-10 LCWS10 - Beijing Global Design Effort 3 Evolving Design  Cost Reductions Some possible cost reductions (e.g. single tunnel, half RF, value engineering) deferred to the engineering phase July 2006

27-March-10 LCWS10 - Beijing Global Design Effort 4 SB2009 Themes N Walker Cost Savings ~ 13%

27-March-10 LCWS10 - Beijing Global Design Effort 5 PAC Report – Nov 09 “The PAC supports the “Minimum Machine” activities to carefully review the RDR design, although it is not enthusiastic about the use of the term “Minimum Machine”. The Committee believes that this activity should not compromise the existing ILC physics goals, and reiterates its belief that the 1 TeV upgrade option should be maintained.”

27-March-10 LCWS10 - Beijing Global Design Effort 6 AAP Review - Conclusion (1) “The SB2009 exercise was carried out to save cost and consolidate the design. The cost savings in SB2009 amount to 12.6% and are composed of several savings at the few per cent level. The AAP recognizes that a cushion of savings at this level will have to be identified to contain the cost of the project which is likely to change because of both a better understanding of the cost composition, of progress in optimization and of external influences such as the variations in cost of raw material and external services until the end of Technical Phase II.”

27-March-10 LCWS10 - Beijing Global Design Effort 7 Recommendations of GDE EC (1) After review and subsequent discussion of the AAP SB2009 Review Report, the GDE EC agreed and confirmed: –That containment of the capital cost (VALUE) estimate at the RDR level is a primary TD Phase 2 goal. Our design activity is now aimed at making the project more robust against possible (expected) unit cost increases. –To move forward with studies aimed at the possible adoption of the themes in SB2009 proposal, but not necessarily the exact details. –To establish a formal process to make these changes to the baseline in an open and transparent fashion, and where necessary after due process and consultation with all stakeholders.

27-March-10 LCWS10 - Beijing Global Design Effort 8 TDR vs RDR Costs Why does cost containment matter? –Cost of large international science projects have a very bad history and governments are more and more cautious as a result. Will a ~ 15% cost savings make a difference for project approval? –We are on record for a cost of 6.6 BILCU for the ILC. That cost has frightened governments! –15% corresponds to $1B, not a negligible amount –We will have unavoidable areas of cost growth, probably greater than the anticipated savings. – Significant net cost increase for the TDR over RDR will be considered (by some) as a signal of another ‘out of control’ project.

27-March-10 LCWS10 - Beijing Global Design Effort 9 International Space Station Final and Total Cost Growth Even Greater

27-March-10 LCWS10 - Beijing Global Design Effort 10 LHC “The construction of LHC was originally approved in 1995 with a budget of 2.6 billion Swiss francs, with another 210 million francs (140 M€) towards the cost of the experiments. However, cost over-runs, estimated in a major review in 2001 at around 480 million francs (300 M€) in the accelerator, and 50 million francs (30 M€) for the experiments, along with a reduction in CERN's budget pushed the completion date out from 2005 to April 2007.[12] 180 million francs (120 M€) of the cost increase has been the superconducting magnets.” - (Wikipedia)

27-March-10 LCWS10 - Beijing Global Design Effort 11 ITER

27-March-10 LCWS10 - Beijing Global Design Effort 12 Cost Containment is essential for ILC Our problem is worse than the example projects –International Space Station was dominantly a US project that was heavily supported by US industry, so it could absorb large increase without cancellation –LHC has a large well-funded host laboratory that could absorb cost increase by stretching schedule and paying for it from future years –ITER has more trouble and more jeopardy! A significant (~ % increase) is causing enormous problems for the project. We need governments to take ILC seriously. That requires 1) science goals that are important enough to convince making the investment, a technical design and project that is considered robust and worthwhile, and finally, costs that are considered affordable and UNDER CONTROL.

27-March-10 LCWS10 - Beijing Global Design Effort 13 Achieving ILC Cost Containment We must continually balance science performance with cost and risk to propose a convincing construction project. We must have continuing close GDE / detector / physics studies and interaction to evaluate science impact of proposed changes to ILC baseline.

27-March-10 LCWS10 - Beijing Global Design Effort 14 Technical Design Phase and Beyond AD&I studies RDR ACD concepts R&D Demonstrations TDP Baseline Technical Design RDR Baseline Beijing Workshop TDR TDP-1 TDP-2 Change Request SB2009 evolve change control process AAP PAC Physics CERN Workshop