CA Regional Water Quality Control Board San Diego Region CEQA SCOPING MEETING: TENTATIVE CLEANUP AND ABATMEMENT ORDER (CAO) NO. R9-2010-0002 January 21,

Slides:



Advertisements
Similar presentations
Public Scoping Meeting December 3, 2012
Advertisements

November 8, California Environmental Quality Act California Environmental Quality Act SB 97 (Dutton) SB 97 (Dutton) Consistency Consistency Lead.
Scoping Meeting Yuba Goldfields 200-Year Flood Protection Project Environmental Impact Report June 23, 2014.
City Council Hearing March 3, 2008 SIERRA POINT BIOTECH PROJECT.
Planning Commission, City of Brisbane Public Hearing for the Sierra Point Biotech Project November 29, 2007 SIERRA POINT BIOTECH PROJECT.
Sacramento Local Agency Formation Commission (LAFCo) Draft Environmental Impact Report SMUD Amendment of the Sphere of Influence and SMUD Yolo Annexation.
Yuba-Sutter Regional Conservation Plan EIS/EIR SCOPING MEETING January 6, 2015.
Final Program Environmental Impact Report Gillespie Field Development Council January 17, 2012 Item #5.
PUBLIC SCOPING MEETING Draft Environmental Impact Report for the SEWER AUTHORITY MID-COASTSIDE (SAM) WET WEATHER FLOW MANAGEMENT PROJECT August 28, 2007.
Draft Program Environmental Impact Report Public Meeting November 30, 2011.
Bill Orme, Senior Environmental Scientist, State Water Board Liz Haven, Asst. Deputy Director, Surface Water Regulatory Branch, State Water Board Dyan.
Nyanza NRD Trustee Council U.S. Fish and Wildlife Service Massachusetts Executive Office of Energy and Environmental Affairs National Oceanic and Atmospheric.
1 Air Quality Impact Analysis and Other PSD Requirements Donald Law U.S. EPA Region 8.
SCOPING MEETING FOR ENVIRONMENTAL IMPACT REPORT REQUIRED BY PUBLIC RESOURCES CODE SECTION 3161 (b)(3) AND (4) (SENATE BILL 4) (PAVLEY) C ALIFORNIA D EPARTMENT.
Lassen Lodge Hydroelectric Project Public Scoping Meetings November 5, 2014 (Sacramento and Red Bluff) State Water Resources Control Board Division of.
Regulatory Controls PBT Strategy Team Great Lakes Regional Collaboration February 22, 2005.
Draft Equine Ordinance POD
Overview of Regulatory Changes, Policy and Implementation Colleen Brisnehan Colorado Department of Public Health And Environment Hazardous Materials and.
Public Scoping Meeting for the Preparation of a Program Environmental Impact Report to Address Implementation of the Optimum Basin Management Program (OBMP)
David Rizk, DirectorKevin Colin Development Services DepartmentLamphier-Gregory, EIR Consultant South Hayward BART/Mission Blvd Form-Based Code Draft Supplemental.
Skyline Heights City of Corona Scoping Meeting March 4, 2014.
U N I T E D S T A T E S D E P A R T M E N T O F C O M M E R C E N A T I O N A L O C E A N I C A N D A T M O S P H E R I C A D M I N I S T R A T I O N State.
Big Sandy Rancheria Band of Western Mono Indians Casino and Resort Project Draft EIS Public Hearing Wednesday, February 2, p.m. – 9 p.m. Foothill.
Addressing Cumulative Impacts of Pollution: A CEQA Perspective A Forum Presented by the Contra Costa County Hazardous Materials Commission December 4,
DOE ORDER ENVIRONMENTAL PROTECTION PROGRAM WORKSHOP Natural Resource Trusteeship John J. Bascietto
2006 Cumulative Effects Assessment CEA Definition  Potential for residual project-specific effects associated with Meadowbank project in combination.
Salton Sea Species Conservation Habitat Scoping Meetings July 7 and 8, 2010.
Winery Ordinance Update Scoping Meeting for the Environmental Impact Report County of Santa Barbara July 16, 2014.
Delta Plan Draft Program EIR Status and Summary of Approach October 27, 2011 Not Reviewed/Approved by Delta Stewardship Council1October 27, 2011.
CALENDAR ITEM 101 FINAL ENVIRONMENTAL IMPACT REPORT (EIR) S A N F R A N C I S C O B A Y A N D D E L T A S A N D M I N I N G P R O J E C T STATE CLEARINGHOUSE.
1 Completing the CEQA Checklist Terry Rivasplata.
NRC Environmental Reviews for Uranium Recovery Applicants and Licensees James Park (301)
Margaret Byrne, U.S. Fish and Wildlife Service
1 Findings and Board Resolution Steven Blum. 2 CEQA Findings in the Board Resolution  Resolution or separate appended document contains findings critical.
Solar Energy Research Center Project CEQA Public Scoping Meeting May 26, 2010.
Brian Hitchens and Sam Williams PCBs in the Urban Environment: Implications for Long-Term Sustainability Of Low-Threshold Remediation.
LBNE Environmental Assessment NEPA Informational Meeting May 23, 2013 Rod Walton, LBNE NEPA Manager.
White Hill Middle School Initial Study/Mitigated Negative Declaration Ross Valley School District Community Meeting November 1, 2011.
Chapter 20 Environmental Protection
Durham Villas Planned Unit Development TSM & REZ Morris Bud Keeney Butte County Board of Supervisors December 11, 2012.
Prepared by: Alex Fisch Planning Services Division.
City and County of San Francisco Scoping Meeting Environmental Impact Report (EIR) PURPOSE To solicit participation in determining the scope.
Scoping Meeting August 25, 2010 Project Description, and California Environmental Quality Act (CEQA), Overview.
Bay Area Air Quality Management District CEQA Air Quality Guidelines September 2, 2010 Bay Area Air Quality Management District CEQA Air Quality Guidelines.
CEQA 101  CA Legislature passed CEQA in 1970; signed by Governor Reagan  CEQA statutes are found in Public Resources Code sections et seq.  The.
Environmental Impact Report (EIR) Update May 2, 2016.
1 Introduction to Ecological Re-Use Concepts: ITRC Technical and Regulatory Guidance Document 2006 Brownfields Conference Boston, Massachusetts Charles.
Environmental Scoping Meeting April 9, Meeting Outline Overview of the Proposed Project Purpose of the Scoping Meeting Environmental Review Process.
LAKE FOREST SPORTS PARK SCOPING MEETING JUNE 23, 2009.
CE 360Dr SaMeH1 Environmental Eng. 1 (CE 360) Associate Professor of Environmental Eng. Civil Engineering Department Engineering College Majma’ah University.
Port of Long Beach CEQA/NEPA Process Rick Cameron 2010 Tenant Orientation.
MONTEREY DOWNS AND MONTEREY HORSE PARK AND CENTRAL COAST VETERANS CEMETERY SPECIFIC PLAN SUBSEQUENT EIR City Council Study Session September 29, 2016.
The Plaza at Santa Monica Project PUBLIC SCOPING MEETING
1828 Ocean Ave & 1921 Ocean Front Walk PUBLIC SCOPING MEETING
Scoping Meeting April 20th 6:00 pm
Overview of the Draft EIR
Providence Saint John’s Health Center Phase II Project
Introduction to the California Environmental Quality Act (CEQA)
La Mesa Climate Action Plan Supplemental Environmental Impact Report Scoping Meeting May 31, 2017.
City of Los Angeles Department of Public Works Bureau of Engineering
Overview What is the CEQA environmental review process?
South San Gabriel Boulevard Pacific Square SG Scoping Meeting Case Planner: Tracy Steinkruger, Planning Manager.
Fifth Standard Solar Project Complex
City of Los Angeles Department of Public Works Bureau of Engineering
Vista Verde Residential Project Environmental Impact Report Public Scoping Meeting May 19, 2010 Michael Brandman Associates.
CEQA Guidelines & Thresholds Update
Brackish Water Desalination Project Draft EIR
Final Environmental Impact Report
Draft Equine Ordinance
Camarillo Springs Project Draft EIR Scoping Meeting
Presentation transcript:

CA Regional Water Quality Control Board San Diego Region CEQA SCOPING MEETING: TENTATIVE CLEANUP AND ABATMEMENT ORDER (CAO) NO. R January 21, 2010

CEQA SCOPING MEETING u Project Description u Project Alternatives u Initial Study/Environmental Checklist u Next Steps u Questions & Comments

Project Description The project is a CAO for cleanup of contaminated marine sediments at the NASSCO/BAE Systems Shipyard Sediment Site in San Diego Bay. The cleanup remedy may include dredging, capping, and/or natural recovery. Dredge spoils may be dewatered at an onshore facility and disposed of at an appropriate landfill site.

Project Alternatives Alternative #1 – No Action Alternative #2 – Dredge & Landfill Disposal Alternative #3 – Dredge & Confined Aquatic Disposal (CAD)

BAE Leasehold Total Remedial Area = 532,509 sq ft Dredge Remedial Area = 444,032 sq ft Under Pier Remedial Area = 88,477 sq ft Dredge Volume = 87,835 cu yd Sampling Station Land

NASSCO Leasehold Total Remedial Area = 231,525 sq ft Dredge Remedial Area = 217,800 sq ft Under Pier Remedial Area = 13,275 sq ft Dredge Volume = 53,000 cu yd TMDL Area = 218,060 sq ft Sampling Station Land

To Disposal Site Cleanup Remedy Alternative #1 – No Action

To Disposal Site Trucking Sediment Processing & Stockpiling Barge Sediment Dredging Cleanup Remedy Option #2 – Dredge & Landfill Disposal

Sediment Dredging Barge Confined Aquatic Disposal (CAD) Cleanup Remedy Option #3 – Dredge & CAD

TYPICAL CAD CONSTRUCTION with Fish Enhancement Structures & Eelgrass

The environmental factors checked below would be potentially affected by this project, involving at least one impact that is a "Potentially Significant Impact".  Aesthetics  Agriculture Resources  Air Quality  Biological Resources  Cultural Resources  Geology /Soils  Hazards & Hazardous Materials  Hydrology / Water Quality  Land Use / Planning  Mineral Resources  Noise  Population / Housing  Public Services  Recreation  Transportation/Traffic  Utilities / Service Systems  Mandatory Findings of Significance Initial Study/Environmental Checklist

Air Quality Potentially Significant Impact Less than Significant with Mitigation Less than Significant Impact No Impact a) Conflict with or obstruct implementation of the applicable air quality plan? X b) Violate any air quality standard or contribute substantially to an existing or projected air quality violation? X c) Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non- attainment under an applicable federal or state ambient air quality standard (including releasing emissions which exceed quantitative thresholds for ozone precursors)? X

GEOLOGY AND SOILS Potentially Significant Impact Less than Significant with Mitigation Less than Significant Impact No Impact a) Expose people or structures to potential substantial adverse effects, including the risk of loss, injury, or death involving: ii) Strong seismic ground shaking? X

Next Steps Notice of Preparation 12/9/09 Notice for CEQA Scoping Meeting Initial Study CEQA Scoping Meeting 12/9/09 12/22/09 1/21/10 Draft EIR Final EIR Review for Responsible & Trustee Agencies day Public Review

Questions & Comments