NO A Project Status John Cooper & Ron Ray October 18, 2006.

Slides:



Advertisements
Similar presentations
2007 CAH HF Program Group 2 Roadmap Next Steps for Phase II January – March 2007 JANFEBMARAPRMAYJUNJULAUGSEPOCTNOVDEC Engage Internal Stakeholders Plan/Educate.
Advertisements

FCMAT Response & Preparation: Process Outline October 25, 2006.
1. 2 RE Case Study What was the Project Objective? When did it all Start? What was the Plan? How did Negotiations take place? What were the Benefits of.
Church Council Report October 1, 2012 SEVERNA PARK UNITED METHODIST CHURCH Capital Campaign Planning Activity CommunityNexus Consulting.
How to Hit a Homerun Saving Energy and Updating Facilities Presented by Shirley McNutt.
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
BIG Process Flow Annexure A1. Call for Proposals Opens Call for Proposals Closes BIG Partners assigned proposals to review Preliminary screening by BIG.
Braidwood Status Report Jonathan Link Columbia University APS Study, Reactor Working Group February 7&8, 2004.
NuMI Offaxis Costs and Whither Next Stanley Wojcicki Stanford University Cambridge Offaxis workshop January 12, 2004.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
Mu2e WGM 7/27/2011 R. Ray Mu2e Project manager. Director’s Review We have settled on date for the Director’s CD-1 Review; Oct Focus of review will.
Fermilab Implementation of DOE Critical Decision Process FRA Project Management System Presentation by L Edward Temple Jr Head, Office of Project Management.
1 BROOKHAVEN SCIENCE ASSOCIATES LOB - Ring Building Construction Coordination Michael P. Bromfield Construction Engineer NSLS-II Conventional Facilities.
LCoNZ Institutional Research Repository Project Overview LCoNZ – history and background IRR Project – why, what, how Lessons learned Future directions.
NoVA FNAL Engineering Needs 9 February 2009 Dave Pushka.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
HFT project Overview and Status October 14, 2010 F.Videbaek BNL.
CVE 4070 Construction Engineering Test-2 & Review Prof. Ralph V. Locurcio, PE.
Lab-Wide Earned Value Management System Project Core Team Meeting October 01, 2008 Dean A. Hoffer/Elaine McCluskey.
NOvA Project Status April 3, 2007 John Cooper Ron Ray Nancy Grossman.
EMS User Group Conference – 2008 PHI EMS MIGRATION TO COMMON PLATFORM PROJECT Manley Higgins Project Manager System Operations Pepco Holdings Inc. September.
Progress update on developing Health Sector Strategic Plan (HSSP IV) Joint Annual Health Sector Review Technical Review Meeting Wednesday 5 th.
Mu2e WGM R. Ray Mu2e Project Manager Sept. 14, 2012.
WLE Operations Team Planning Meeting 2 nd February 2015, Water’s Edge.
27-March-10 LCWS10 - Beijing Global Design Effort 1 Barry Barish LCWS10 - Beijing 27-March-10 “Cost Containment” for the TDR.
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
Cost and Engineering Working Group Introduction Jim Strait Fermilab LBNE Project Manager Deputy Chair, Cost and Engineering Working Group LBNE Reconfiguration.
This is an example text TIMELINE PROJECT PLANNING DecOctSepAugJulyJuneAprilMarchFebJanMayNov 12 Months Example text Go ahead and replace it with your own.
Compressor status AWAKE Technical Board meeting 19 August 2015.
LIGO-G D LIGO R&D1 Advanced LIGO R&D Review The PSL Peter King & Rich Abbott October 8, 2002.
Improving the world through engineeringwww.imeche.orgImproving the world through engineering Budget Update.
IAEA International Atomic Energy Agency International peer review on evaluation of nuclear power infrastructure A. Cardoso Department of Technical Cooperation.
Structure Update Installation & Building Update Revisions Outlined Costs Revisited (since given to Gina) Jeff Nelson Fermilab.
IARC Milestones completed Sept 2011: End of Tevatron Run, FESS obtains ~full access to infrastructure at CDF, PPD begins D&D in CDF assembly bldg Sept.
F Axis NO A Status NO A Collaboration Meeting Fermilab 17 November 2006 Gary Feldman.
DEX Publication Project OASIS PLCS Telecon 27 November 2007 Trine Hansen.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP STATUS REPORT V. Kuchler,
AVAILABLE Will Build to Suit Could the University of Minnesota do this? –Alternate to Line Item or to a DOE grant? from Marvin Marshak (in the Middle.
U.S. Department of Agriculture eGovernment Program eDeployment Kickoff August 26, 2003.
Off-Axis Collaboration Meeting Feb 7, 2004 Richard Talaga, Argonne (Liquid) Scintillator Structure Workshop Report Workshop Purpose –To review the current.
1 draft NO A WBS J. Cooper NO A Working Group Meeting June 29,2005 Work is the effort of Ron, Dave, Bill, Suzanne, Harry, not just me.
Joint Report to Select Committee on Appropriations by Northern Cape Department of Health Northern Cape Department of Roads & Public Works supported by.
NOvA Project Status February 6, 2007 John Cooper Ron Ray Nancy Grossman.
B Factory D&D Review: March 23, 2009 Page 1 B Factory D&D: Strategy Overview S. Kahn Director, PPA.
Progress and plans for HO Installation S. Dugad, K. Sudhakar Tata Institute of Fundamental Research India-CMS Meeting at BARC, July 2005.
CENF CIVIL ENGINEERING UPDATE : - SITE INVESTIGATION - CALL FOR TENDER FOR DESIGN & CONTRACT ADMINISTRATION SERVICES John Osborne GS/SE 16 May 2013.
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
MicroBooNE Working Group Meeting March 08, :00– 2:00 PM Black Hole (WH2NW)
Conventional Facilities for the Far Detector Options Assumptions and Cost Estimates T. Lundin April 25, 2012 LBNE Reconfiguration Workshop - 25, 26 - April-2012.
Fernanda G. Garcia, Steve Dixon, Andy Stefanik, Justin Tillman, John Voirin SBN Far Detector Installation & Integration.
SBN Near Detector Building Conventional Facilities Update Steve Dixon LAr1-ND Collaboration Meeting 16 September 2014.
SBN Far Detector Building Conventional Facilities Update Steve Dixon WG3 Workshop 11 September 2014.
FRA Earned Value Management System Implementation Project October 9, 2008 Dean Hoffer / Elaine McCluskey.
Lab-Wide Earned Value Management System Project Oversight Committee Meeting September 11, 2008 Dean. Hoffer / Elaine McCluskey.
Cost and Schedule Paul Weinman Pacific Northwest National Laboratory.
Project Execution Methodology
Director’s Progress Review Closeout Meeting
Head, Office of Project Management Oversight (OPMO)
$150K Chicago/ANL seed funding for Braidwood site investigation
Case Road Sewer Joe Mouawad, P.E. October 27, 2016.
ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe – KICK OFF MEETING
Springbrook Estates Sewer Improvement Area Informational Meeting
CAP190: Workgroup Report CUSC Modifications Panel, 26th August 2011
Director’s Progress Review Closeout Meeting
Meeting of the LCLS Facilities Advisory Committee
Delta Water Supply Project
Center for Vision (CVN) on Block 33 Move Planning & Logistics Timeline
Value Engineering In Design
Details supporting the increase
Review of the Community Council Scheme of Establishment
Presentation transcript:

NO A Project Status John Cooper & Ron Ray October 18, 2006

Oct 18, 2006 WGM J. Cooper & Ron Ray 2 Interactions with DOE Oct 16, Steve Webster says we do not need a Cyber Security document for CD-2 since NOvA is not an IT project

Oct 18, 2006 WGM J. Cooper & Ron Ray 3 Interactions with Marvin Marshak Oct 6 asked us for an organization chart detailing how the Cooperative Agreement and the Project would interact. –Steve Dixon, Ron and I have iterated this a couple of times, will send it to Marvin today

Oct 18, 2006 WGM J. Cooper & Ron Ray 4 Integrated Construction Team

Oct 18, 2006 WGM J. Cooper & Ron Ray 5 “The world does continue to make sense”, says Ron Oct 18 Lube Report –Conoco-Phillips reduced prices on Group II Viscosity 70 from $3.09 to $2.97, in line with other vendors –History: –Oct 18$ $ 59.04) –Oct 10$ $ 58.54) –Oct 3$ $ 58.56) –Sept 26$ $ 61.19) –Sept 19$ $ 61.74) –Sept 12$ $ 63.67) –Sept 5$ $ 68.60) –Aug 29$ $ 69.93) –Aug 22$ $ 72.93) –Aug 15$ $ 72.94) –Aug 8$ $ 76.35) –Mar 28$ $ 65.97), this was at CD-1 Review time > 5 weeks to fall back to March level, meanwhile oil fell another 10% below the March level

Oct 18, 2006 WGM J. Cooper & Ron Ray 6 What we need for CD-2 Review

Oct 18, 2006 WGM J. Cooper & Ron Ray 7 What we need for CD-2 Review, page 2

Oct 18, 2006 WGM J. Cooper & Ron Ray 8 What we need for CD-2 Review, page 3

Oct 18, 2006 WGM J. Cooper & Ron Ray 9 What we need for CD-2 Review, page 4

Oct 18, 2006 WGM J. Cooper & Ron Ray 10 What we need for CD-2 Review, page 5

Oct 18, 2006 WGM J. Cooper & Ron Ray 11 Sufficient Project Personnel? Administrative support high level full time –Elaine Phillips: 4 interviews scheduled, last two are Oct 20. Not clear where this person sits. Help for monthly report startup –Could be admin person? More engineering on Block Raiser –Final design, staged design allowing test phase? –Dave Pushka & Vic Guarino go back to basics before proceeding Have agreed to go with a “pivoter”design vs. “raiser” for TDR / CD-2 Will look at raiser again as we go from 30% design to 100%. Need FEA help, proposal to PPD on Sept 27 (~ 4 wks FEA between now and Dec 1) –PPD accommodated request, part of Bob Wands. More engineering & help on Near Detector –Have Karen Kephart, Peter Lucas, have ANL engineers (Guarino) Issue with design/drafting, lack of access to Don Friend, first reported to PPD Eng Resource Mtg on July 17, PPD and Project continue to watch this –Leon Beverly? John Voirin? Both familiar with shaft & tunnel. Installation transport, containment, fire protection, mobility Leon toured MINOS access tunnel with Peter Lucas on August 30 –Will help on a cost estimate to move utilities Have FESS & Chris Laughton help on crude excavation costs in access tunnel –First estimate from Elaine McCluskey, Sept 22

Oct 18, 2006 WGM J. Cooper & Ron Ray 12 Sufficient Project Personnel? Continued Scintillator Blending –Off-site: have CCC consultants to develop bid list, then we do an RFI –On-site: Getting budgetary quote to hold mineral oil off-site, draw only small amounts at a time for blending Need to understand leased railcars next for possible use as “modest” storage at railhead Still would do prototype blending for spring 2007 on-site Involve PPD process control group? –PPD assigns Bill Pritchard to help with transportation logistics evaluation QA person, part time probably OK for now….. –No progress Electronics infrastructure and Slow Controls –Craig Dukes (Univ of Virginia) as new L3, understands Italians will join eventually –Asked John Oliver & Dave Pushka to look harder at the power & cooling issues across L2 boundaries – led to proposal of new cooling model: Dave Pushka has suggested changing our design from water cooling of the TEC hot side to R-134a cooling with one cooling unit per detector block –Still in initial discussions within NOvA –Might need PPD Process Control group help for design John Oliver spearheading NOvA meetings to recommend a baseline for the TDR –We will chose a baseline by Nov 1…..