Quilt Optical Fiber Workshop Boulder Research and Administrative Network (BRAN) Experiences/Lessons Learned By Jim Van Dyke.

Slides:



Advertisements
Similar presentations
Depending on number of homes and to maximize construction efficiencies, either a 8 way or 12 way tube bundle is deployed in the cut. At each drop, 1 tube.
Advertisements

Preparing a Curb Ramp Project December 15, Tiers of Project Types Non-Signalized Curb Ramp Reconstruction - Typically utilizing standard plans.
Cabling UTP AND FIBER CABLING. Structured Cabling Infrastructure Mounted and permanent Allows patching Comfort that infrastructure is OK Components: Information.
Qualifications Experience Upper management has 25+ years combined experience in fiber optic communications.
Managing a Successful Mechanical System project Following design – what next?
1 Gifted and Talented Task Force Presentation to the Howell Township Board of Education March 29, 2006.
Merit Network BTOP Status Robert Duncan & Pete Miller Director of Network Operations.
RELIABLE SUPPLIERS Supply Chain Management and Procurement policies in place Supply Chain Management and Procurement policies in place Register all suppliers.
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RAF/ 2012 /00032 Date: 15 January 2013 Time: 11:00.
Planning PERT - Project Evaluation and Review Technique) and CPM - Critical Path Method are network analysis techniques that are commonly used in project.
4 th ANNUAL JOINT CSU/UC PSSOA CONFERENCE March 25-26, 2003 “Emerging Construction Methodologies in CSU – What Public Works Contract Specialists Should.
System Construction and Implementation Objectives:
Rob Vietzke Connecticut Education Network University of Connecticut NEREN Quilt RON Meeting RFP Examples June 22, 2004.
Direct Purchase of Service (DPS) Training Request For Proposal.
Contractor Safety Management
Emerging Transportation Technologies in Virginia Ken Earnest Assistant Division Administrator Operations Division.
Solving Problems in IS: Systems Approaches Logical framework in which to work. Logical framework in which to work. Serves as a reminder. Did I forget anything?
© 2014 Rockwell Collins. All rights reserved. Middle East Airport Construction Projects: Lessons Learned From an ICT Perspective May 2015.
Amsterdam October 2003 M. Sedita VLVnT Installation and Maintenance of the submarine network The Maintenance aspect present some difficult as their.
Energy Saving Improvement Programs aka: ESIP; ESCO; P.L. 2009, c. 4 Gordon Ball, Senior Procurement Specialist Division of Local Government Services Introducing…
Managing Outsourced SW Projects Lesson Learned Manoj Singh, PMP.
ACT 96 - Indoor Environmental Quality In conjunction with the requirements directed under WI Statute and Administrative Code, school building officials.
Fiber Optic Communication By: Chris Frazier. Introduction What is fiber optics Applications of fiber optics Total Internal Reflection How signals are.
Solution Overview for NIPDEC- CDAP July 15, 2005.
BP, OQ & You. 2 Why do we have OQ? Walnut Creek 3 Bellingham Washington.
Once the designer has decided to use and selected the Magna 3 pump for an application, they must communicate these decisions to the contractor. This communication.
Optical Fiber Connections joints and couplers
Rural Intersection Conflict Warning System (RICWS) Design-Build Project.
Practical Problems Experienced with Industrial DSM Projects Marius Kleingeld 15 August 2012.
1 Getting to the Fiber: Lateral Builds Presented by Stephen Kankus, NYSERNet Quilt Regional Optical Networking Workshop June 22, 2004.
A New Paradigm for Utility Coordination Kenny Franklin INDOT Director of Utilities and Railroads.
6-1 Management Information Systems for the Information Age Copyright 2004 The McGraw-Hill Companies, Inc. All rights reserved Chapter 6 Systems Development.
Creating A Cleaner Energy Future For the Commonwealth Renewable Closed Landfills Eileen McHugh Municipal Energy Programs Coordinator July 26,
Quilt Regional Optical Networking Workshop, June Michigan LambdaRail (MiLR) Optical Networking Project W. Scott Gerstenberger External Networking.
CABLING SYSTEM INSTALLATION. Installation Quality The quality of installation is the most serious problem in implementation of the telecommunications.
© 2015 Universal Service Administrative Company. All rights reserved Applicant Training Fiber Options.
Grant Agreement Documents (between Global Fund and Principal Recipient) Workshop for TB Experts Hosted by WHO Stop TB and the Global Fund December 2005.
Los Angeles County Metropolitan Transportation Authority Overcoming Multi-Jurisdictional Challenges Lessons Learned Implementing Bus Signal Priority.
Jim Van Dyke Network Engineering & Technology Section The UCAR Physical Network Infrastructure or Why Bother to Do It Right? Presented By: James R. Van.
1 Implementation Issues Presented by Stephen Kankus, NYSERNet Quilt Regional Optical Networking Workshop June 22, 2004.
Illinois Century Network Illinois Broadband Opportunity Partnership – East Central Project.
CABLING SYSTEM INSTALLATION. Installation Quality The quality of installation is the most serious problem in implementation of the telecommunications.
Construction of a Transfer Station
Chapter 11: Alternative Approach - Purchasing Systems.
Bina Nusantara 19 C H A P T E R SYSTEM CONSTRUCTION AND IMPLEMENTATION.
AT&T Managed Internet Service (MIS) with Ethernet Customer Site Preparation Document This document addresses Customer sites that do not have AT&T fiber.
Division 1 – General Requirements ACT Objective O Learn to write Division 1 sections in a manner that governs but does not limit the content of.
© 2015 Universal Service Administrative Company. All rights reserved E-rate Program Applicant Trainings I Fiber Options1 Fiber Options Deep Dive:
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
September 30, 2008 Jim Van Dyke, Web:
New Directions in Auditing Construction and Public Works Projects Part 2 Beth Woodward, CGAP, CIA, CCA Senior Management Auditor Audit Services Division,
University of Toronto at Scarborough © Kersti Wain-Bantin CSCC40 testing and installation 1 for testing you need: test data and test cases test plans and.
Alpine County Government Center Board of Supervisors Presentation October 2, 2012.
PUBLIC UTILITIES COMMISSION OF LATVIA PRACTICAL EXPERIENCE OF NGA SOLUTIONS IMPLEMENTATIONS, ESTABLISHMENT OF NGA INVESTIGATIONS AREAS Aleksandrs Čerņakovs-Neimarks.
Eligible Services and Fiber Options for Service Providers
Metro’s Natural Areas: Maintenance Strategy Needed
nSW Alignment Installation
CHAPTER 2 Testing Throughout the Software Life Cycle
Beginner Eligible Services
Network Technology Update
Rapid Connect® Getting Started
2007 Hurricane Season Preparedness Briefing
Systems Construction and Implementation
Systems Construction and Implementation
Systems Development An Overview of Systems Development
CDS-EL IRR Closeout 28 March 2019 J.G. Weisend II, Chairman.
Microtechnology Approaches for FTTP
Presentation transcript:

Quilt Optical Fiber Workshop Boulder Research and Administrative Network (BRAN) Experiences/Lessons Learned By Jim Van Dyke

6/22/ BRAN Introduction  Four Partners: NCAR/UCAR, City of Boulder, NOAA/NIST, CU at Boulder  Boulder metro installation to connect partner sites  A 96 strand SMF-28 fiber from end to end  Nodes are spliced and pigtailed

6/22/04 - 3

6/22/ Development  Initiated by technical side, not management side  Four partners mean: cooperation, politics, serving special interests  Management and technical folks had to work together to develop project  RFP process with detailed specifications

6/22/ Specifications  Identify lead party to develop and champion specifications  Do not compromise quality  Document and confirm the details  Have other parties review specs and proposals

6/22/ Construction  Electrical contractor won the bid with a communications subcontractor  The contractor underestimated the complexity/cost of the installation – it is called “Boulder” for a reason –Hit countless big rocks –Hit at least 2 water mains –Locates/paths under busy intersections difficult –Working with railroad RoWs difficult

6/22/ Prepare for Setbacks

6/22/ Installation  Assign lead party to manage installation  Spend time with the contractor/installer up front  Verify quality of fiber installers/splicers prior to installation

6/22/ Acceptance Criteria  Quality components  Bend radius  Pulling tension  Splice quality  Connector quality  100% fiber strand verification  Make sure your expectations are clear up front –Verify quality early and often

6/22/ Connector Faces

6/22/

6/22/ Phased implementation  Specifications should allow turning up links in the path without having the entire project done

6/22/ Maintenance: Do you maintain or outsource?  Coordinate outsource management –Locator –Manhole verification - annuallyManhole verification –Repair  We maintain –Emergency parts –Contingency fund

6/22/ Maintenance – annual manhole verification

6/22/

6/22/ Expansion  Collocated at local PoPs  Have a common bundle of fiber go to every new node/spur and be terminated for route testing

6/22/ Questions?