20th September 2006Riunione CSN1 - Trieste1 LUCID status Outline:  The Lucid detector  Test performed  The installation scenario  The electronics 

Slides:



Advertisements
Similar presentations
Beam-plug and shielding studies related to HCAL and M2 Robert Paluch, Burkhard Schmidt November 25,
Advertisements

H1 SILICON DETECTORS PRESENT STATUS By Wolfgang Lange, DESY Zeuthen.
Front-end electronics for the LPTPC Outline of the talk:  System lay out  Mechanics for the front-end electronics  End-cap and panels  Connectors and.
Peter Križan, Ljubljana Peter Križan University of Ljubljana and J. Stefan Institute The HERA-B RICH counter.
TileCal Electronics A Status Report J. Pilcher 17-Sept-1998.
02/10/2004 Minimum Bias Trigger Scintillator Counters (MBTS) for early ATLAS running M.Nessi ATLAS week, Freiburg.
1 KEK Beam Test Analysis Hideyuki Sakamoto 15 th MICE Collaboration Meeting 10 st June,2006.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
Saverio Minutoli INFN Genova 1 T1 Electronic status Electronic items involved: Anode Front End Card Cathode Front End Card Read-Out Control card Slow Control.
May 16 th 2006M. Bruschi – CSN1 Roma1/20 A. Bertin, M. Bruschi, D. Caforio, S. De Castro, L. Fabbri, P. Faccioli, B. Giacobbe, F. Grimaldi, I. Massa, M.
TOF for ATLAS Forward Proton Upgrade AFP concept: adds new ATLAS sub-detectors at 220 and 420 m upstream and downstream of central detector to precisely.
LHCC, V0, Sept The V0 detector (Mexico Lyon collaboration)  Segmentation  Simulated performances secondaries / beam-gas  Counters design 1 /
PMF: front end board for the ATLAS Luminometer ALFA TWEPP 2008 – 19 th September 2008 Parallel Session B6 – Programmable logic, boards, crates and systems.
EC front unit status. Outline Conclusions from mechanical prototype and actions taken Status of electrical prototype KIT’s work for TA Dev plan (tests)
2 1/March/2015 日本物理学会大70回年次大会@早稲田大学 東大ICEPP 内山雄祐 他 MEG II collaboration.
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
ECAL Monitoring System Ivan Korolko (ITEP Moscow) PRR, September 2004.
Oct C. Smith - PCAL/EC Commissioning 1 PCAL/EC Commissioning Document
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
CM26 March 2010Slide 1 EMR Status o Intro o Construction o Magnetic shielding o Electronics o Prototype Cosmics test o Schedule Jean-Sebastien Graulich,
Large Area Endplate Prototype for the LC TPC 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes, S.
25/05/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
1 ALICE T0 detector W.H.Trzaska (on behalf of T0 Group) LHCC Comprehensive Review, March 2003.
Antonio Zoccoli RICH 2007 – Trieste 1 October 20, 2007 LUCID* - A Cherenkov tubes based detector for monitoring the ATLAS luminosity LUCID* - A Cherenkov.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
Status of the MaPMT o Status quo o Ongoing work o Issues – mechanics – electronics – schedule o Conclusions LHCb meeting Milano Franz Muheim.
Preliminary Results of the Beetle Readout for the MaPMTs  Part 1: as presented on  Achievements since last LHCb week  Common Mode correction.
Start Counter Collaboration Meeting September 2004 W. Boeglin FIU.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
M. Bruschi – INFN Bologna (ITALY) 1 Electronics, Trigger and DAQ General Architecture of the system for phase I Parts of the system which are already available/tested.
Scintillating Tiles for the Muon Inner regions LHCb Muon Upgrade meeting, CERN May Wander Baldini for the Ferrara LHCb group.
Lead Fluoride Calorimeter for Deeply Virtual Compton Scattering in Hall A Alexandre Camsonne Hall A Jefferson Laboratory October 31 st 2008.
1 Calorimeter in G4MICE Berkeley 10 Feb 2005 Rikard Sandström Geneva University.
STATUS OF MUV3 CONSTRUCTION A joint IHEP Protvino – Mainz – Pisa project MUV3  Proposed by Italo Mannelli: Thick scintillator tiles with direct light.
Status of NA62 straw electronics Webs Covers Services Readout.
Update on CHANTI F. Ambrosino, T. Capussela, D. Di Filippo, P. Massarotti, M. Napolitano, L. Roscilli, G. Saracino Università degli Studi di Napoli «Federico.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
Towards a 7-module Micromegas Large TPC prototype 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes,
Specifications Asic description Constraints Interface with PDM board Schedule Summary.
Barrel PID summary K.Inami (Nagoya) Summary of R&D at Hawaii, Cincinnati, Ljubljana and Nagoya.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
09/10/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
Peter LICHARD CERN (NA62)1 NA62 Straw tracker electronics Study of different readout schemes Readout electronics frontend backend Plans.
Calorimeter Digitisation Prototype (Material from A Straessner, C Bohm et al) L1Calo Collaboration Meeting Cambridge 23-Mar-2011 Norman Gee.
Marcello Abbrescia RPCs for CMS during Phase II RPC rate capability M. Abbrescia, The dynamic behaviour of Resistive Plate Chambers, NIM A 533 (2004) 7–10.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
European DHCAL development European DHCAL development CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY Status :
Status Report toward the Beam Test Quick report on the MPPC mass check Other beam test related issues –Schedule –Participants –Jobs –etc … Satoru Uozumi.
Joint LHC Machine-Experiments Workshop on Very Forward Detectors - 25 January 2007 Beniamino Di Girolamo - CERN PH ATLAS Roman Pots status, commissioning.
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
R&D status of the very front end ASIC Tilecal week (7 October 2011) François Vazeille Jacques Lecoq, Nicolas Pillet, Laurent Royer and Irakli Minashvili.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
Specifications Asic description Constraints Interface with PDM board Planning Summary.
Updates on Vertex Detector NA61/SHINE Collaboration meeting, Wrocław Oct. 8, 2013.
The dynamic range extension system for the LHAASO-WCDA experiment
Detector status and commissioning: LUCID
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Large Area Endplate Prototype for the LC TPC
T1 Electronic status Conclusions Electronics Cards:
CLAS12 software workshop
Mini-drawers, FE-ASIC , Integrator
Calorimeter for absolute luminosity at upgraded DAFNE
LHCf – CSN1 Trieste O. Adriani
Testbeam status report
SVT detector electronics
Presentation transcript:

20th September 2006Riunione CSN1 - Trieste1 LUCID status Outline:  The Lucid detector  Test performed  The installation scenario  The electronics  Conclusions M. Bruschi & A. Zoccoli for the Bologna Group M. Bruschi & A. Zoccoli for the Bologna Group

20th September 2006Riunione CSN1 - Trieste2 The LUCID detector LUCID : “LUminosity measurement using Cerenkov Integrating Detector Goals: - provide a relative luminosity measurement (integrated and bunch by bunch); - provide η-coverage for diffractive physics Winston Cones Fibres Two detectors x 168 Al tubes filled with Isobutane at 1 or 2 Bar pressure Winston cones at the end of the tubes bring the Cerenkov light onto quartz fibers.

20th September 2006Riunione CSN1 - Trieste3 Activities of the Group since Feb.06 Main activities of the LUCID Group after the Test Beam 05 which provided a light yield of ~5 p.e. :  development and optimization of the Monte Carlo code to reproduce the detector performances.  Test on CERN and test DESY to check the detector performances and tune the MC.  Production of new improved detector parts (tubes, Winston cones, fibers).  Development of the electronics project  Discussion of the detector design and of the installation strategies

20th September 2006Riunione CSN1 - Trieste4 Test on CERN Goal of the measurements: Understand the detector performances and check the improvements on new parts. Tested material: Tubes: –Mechanically polished –Electro-polished and mech. polished –Mylar liner –Old tubes (used in 2005 TB) Winston Cones: –Ø 4 mm and Ø 3 mm (new design) –Old cones Ø 3 mm (used in 2005 TB) Fibers bundles: –PUV 500, 700, FSU 600 –Old fibers HUV1000 (used in 2005 TB)

20th September 2006Riunione CSN1 - Trieste5 Test on bench: quantities studied

20th September 2006Riunione CSN1 - Trieste6 Test Bench results: new tubes Old tube New tube Mylar tube Aluminum tubes mechanically polished show a 10% improvement w.r.t old tubes. Close to the Mylar solution. New tube Old tube

20th September 2006Riunione CSN1 - Trieste7 Test DESY Test beam performed on the 6 GeV electron DESY in August 2006 Tested different detector configurations:  Old tube, old WC cone, old fiber bundle  New tubes, new WC cones, new fiber bundles  New tube, new WC cone coupled directly to a single PM a la CDF (backup solution for LUCID)  Exchanged the detector configurations in order to determine the improvements on the different parts. First results from the data analysis.

20th September 2006Riunione CSN1 - Trieste8 TB results: fiber detector Fit each single-channel spectrum: add the results or use calibrations and pedestals (from fits) to rescale each event and obtain the total distribution for each tube

20th September 2006Riunione CSN1 - Trieste9 TB results: fiber detector II Middle fibers Lateral fibers lateral fibers Central fibers Maximum light yield: ~10-12 p.e. ~ factor 2 improvement w.r.t Little bit less than expected from test on bench. Some more improvements needed (2 track resolution etc.) ~11.5 p.e. ~9.5 p.e.

20th September 2006Riunione CSN1 - Trieste10 TB results: single PM ADC spectra, with two peaks: A) Cerenkov light only from gas B) Cerenkov light from gas and PM quartz window A B R2496

20th September 2006Riunione CSN1 - Trieste11 Maximum light yield: ~60-85 p.e. in gas ~40 p.e. in quarzt w. ~ p.e. in tot. Close to the CLC (CDF) performances, with a non optimized system. Solution appealing for the number of p.e., but need to verify:  Radiation hardness of complete PMT system.  Background Cerenkov light in the PMT window from primary & secondary particles.  PM activation, lifetime and Mechanical design. TB results: single PM - II

20th September 2006Riunione CSN1 - Trieste12 Conclusions on the TB results Work to be done in the next few months:  optimization of the baseline solution to further improve performances. (produce new detector parts, test on bench etc.).  Careful verification of the feasibility of the backup option (background, rad. hard. tests etc.).  Radiation tests for the baseline (fiber, epoxy etc.) and for the backup solution (PMT, cables etc.) are needed now  Work is starting now!  Optimization of the Monte Carlo  Test Beam of the final detector before the installation (December 2006).

20th September 2006Riunione CSN1 - Trieste13 The proposed plan for a full LUCID deployment includes the installation of a subset of LUCID detector in The LUCID group is aiming for a full installation of the LUCID in the first long shutdown after end This reduced detector deployment in 2007, will be sufficient to allow the preliminary study of the following: –Backgrounds from secondary in the LUCID detector; –Beam related backgrounds; –Timing; –The front-end and backend readout electronics; –The installation and alignment of the LUCID detector; –The gas supply system; –The effect of heat from the bake-out jacket on the LUCID detector –First luminosity measurements. LUCID detector deployment-I

20th September 2006Riunione CSN1 - Trieste14 The reduced detector deployment will include the complete LUCID pressure vessel, alignment system and gas system. We plan to readout only ~10 tubes/end. Most of the channels will be readout via fused-silica fibres to remote MaPMTs. The FE readout will be placed in the vicinity of the MaPMTs - the resulting signals will be driven to the BE readout in USA15. We expect to use an initial version of the final LUCID electronics. LUCID detector deployment-II Single PMT Baseline fibre-optic readout A few channels will be equipped with a single PMT placed on Winston Cone ends. These PMTs will be readout, via an amplification stage, in USA15, for timing and light collection studies. The full LUCID detector will be installed during the first long shut-down.

20th September 2006Riunione CSN1 - Trieste15 Cable lengths Baseline: –MaPMTs placed in the shielding –MAROC chip placed by the MaPMTs –Drivers boost signal out –Cables go direct to USA  100M) Radiation level in the vicinity of the MaPMTs is 3  5 Grays/Yr Baseline: –MaPMTs placed in the shielding –MAROC chip placed by the MaPMTs –Drivers boost signal out –Cables go direct to USA  100M) Radiation level in the vicinity of the MaPMTs is 3  5 Grays/Yr Placing MaPMTs Readout paths The LUCID readout

20th September 2006Riunione CSN1 - Trieste16 The LUCID FED cards The front end system is now modular so allowing scalability The MAROC Board and part of the ANALOG board has been developed by LUND (thanks!) TX Digital Board GOL, FPGA, TX Connectors Board (HV,LV,RX, TX, analog) MAROC Boards Base board (connectors,signals routing, MAROC prog.FPGA ) ANALOG board (ampl.+line driv.) RX Digital Board TTCRQ, ELMB128A,volt. reg.

20th September 2006Riunione CSN1 - Trieste17 The FED (digital part) The TX digital board designed is in production The other two cards (RX, Connectors) have been mostly defined (6 more weeks work) In order to define the Base Board we need to fix the MAROC I/O (B.L.) All the components (electronics, connectors –except HV) have been defined A prototype of the front end card (MAROC) should be ready toward the middle/end of November

20th September 2006Riunione CSN1 - Trieste18 Electronics/ The analog test board The analog test board has been designed with the aim to provide the possibility to test the analog part of the MAROC chip based front end cards It will allow to test also single anode PMT based readout scheme It is meant to be an important tool that should allow us to understand the detector even in case of delay in the production of a prototype for the MAROC chip based front end cards by using commercially available VME modules for the DAQ All its parts already in production/ prototype should be ready beginning of October

20th September 2006Riunione CSN1 - Trieste19 Electronics/ The Analog Test Board

20th September 2006Riunione CSN1 - Trieste20 Conclusions -I  New detector parts (tubes, cones, fibres) have been produced and tested on bench and at the DESY test beam in August  The TB results indicate factor of ~2 improvements over last test beam. Some more improvements are expected in the next detector version  A test beam on the final detector will be performed in December  Radiation hardness studies on single PMT and fiber bundles are starting now.  New installation scheme for LUCID has been studied. Partial detector deployment foreseen in 2007

20th September 2006Riunione CSN1 - Trieste21 Conclusions-II MAROC2 chip including modifications for LUCID delivered on July. First tests look promising. The design of the front-end electronics is started and it is on track (although we still need a confirmation of the performances of the detector) The most important part of the FED is already under production The Analog Test Board (Backup solution for tests but also for the 2007 installation) is in advanced status of production (prototype expected for beginning of next October) The project is now modular. Moreover, it can be easily adapted in case we will decide for the LUCID readout backup solution The development of the readout and trigger electronics could be a bit relaxed since we can use already available pieces of DAQ to give a luminosity measurement as soon as the front end electronics will be available

20th September 2006Riunione CSN1 - Trieste22 Backup slides

20th September 2006Riunione CSN1 - Trieste23 LUCID position MBTS TILE Front face of LUCID end is ~17m from the IP. Projective geometry. Acceptance covered 5.4 <|η|< 6.1 LUCID region 6-7 Mrad/year at cm -2 s - 1

20th September 2006Riunione CSN1 - Trieste24 LUCID position (2) Planned installation after the Big Wheels A/C.

20th September 2006Riunione CSN1 - Trieste25 Backup solution (under study) Place single miniature PMTs directly onto the end of each Winston cone? Advantages: –More light because of direct coupling –Lower electronics cost –Swap quartz fibres for (cheaper) signal cables Need to study: –Radiation hardness of complete PMT system –Background Cerenkov light in window from primary & secondary particles –Activation –Mechanical design  First the DESY Test Beam Place single miniature PMTs directly onto the end of each Winston cone? Advantages: –More light because of direct coupling –Lower electronics cost –Swap quartz fibres for (cheaper) signal cables Need to study: –Radiation hardness of complete PMT system –Background Cerenkov light in window from primary & secondary particles –Activation –Mechanical design  First the DESY Test Beam HAMAMATSU R2496 PMT Miniature PMT Baseline fibre-optic readout

20th September 2006Riunione CSN1 - Trieste26 Richieste finanziarie 2007 Gruppo BO-Lumi:16.6 FTE Tecnol.=17.5 FTE Missioni interne: - metabolismo17.5 k€ Missioni estero: - metabolismo (17.5 FTE x 1.5MU x 4.4k€)115.5 k€ - C&I(6 mesi x 3 FTE x 4.4 k€) 79.2 k€ - Presa dati (3mesi x 2FTE x 4.4 k€) 26.4 k€ Consumo: - metabolismo 26.0 k€ Inventario: - 2 postazioni di lavoro 4.0 k€ Costruzioni apparato: - (vedi trasparenza successiva) 45.0 k€

20th September 2006Riunione CSN1 - Trieste27 Richieste costr. Apparati 2007

20th September 2006Riunione CSN1 - Trieste28 Test Bench results: old test beam parts Good understanding of the detector performances.

20th September 2006Riunione CSN1 - Trieste29 Expected improvements Expected improvements in light yield based on test bench results: Tubes: improvements in the internal surface (~ 1.1) Winston cone: new design + internal surface (~ ) Fibers: improve fiber quality. Less attenuation (at 300 nm), Larger angular acceptance and larger (core)/(clad) area ratio (0.78 compared to 0.68) plus enlarge the light spectrum sensitivity ( ~1.6)  Expected improvements in light collection: factor ~2 – 4 Next steps: Test DESY from the 31st of July until the 12th of August to test the new detector performances Further detector optimizations Test CERN in November to test the final detector

20th September 2006Riunione CSN1 - Trieste30 FED MAROC PMF ANALOG CARD ANALOG CARD