DFC on behalf of controls software and electronics groups Tango meeting March 19 th 2007 Status of Alba Controls.

Slides:



Advertisements
Similar presentations
Control and IT Systems status and strategy ALBA, Piotr Goryl on behalf of Michał Ostoja-Gajewski, Krzysztof Wawrzyniak, Łukasz Żytniak, Tadeusz.
Advertisements

Digital RF Stabilization System Based on MicroTCA Technology - Libera LLRF Robert Černe May 2010, RT10, Lisboa
2D Detectors DAQ Overview 2D detectors are organized as tiles providing 10G Ethernet serialized portions of the full.
Overview Interfaces Planning.  One PC to control 2 cavities in one cryo-module  Standard PLC and hardware components  Expected PLC cycle time 2ms.
SNS Integrated Control System SNS Machine Protection System EPICS Workshop April 27, 2005 Coles Sibley.
Hamid Shoaee LCLS FAC Review – October Control System Overview Hamid Shoaee Controls System Manager Injector control system commissioning & Support.
EPICS on TPS RF System Yu-Hang Lin Radio Frequency Group NSRRC.
SESAME Control System Status Ibrahim Saleh Control group 10/11/2012 Control Group12th TAC, Nov. 9-10,20121.
February 17-18, 2010 R&D ERL James Jamilkowski R&D ERL Controls Larry Hoff James Jamilkowski February 17-18, 2010 Controls.
Diagnostics and Controls K. Gajewski ESS Spoke RF Source Accelerator Internal Review.
IBL CO 2 cooling control system development status Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI Florian Corbaz – EN/CV/DC.
LCLS-II Linac LLRF Control System – L1, BC1 Zheqiao Geng Final Design Review May 7, 2012.
Agenda Adaptation of existing open-source control systems from compact accelerators to large scale facilities.
29/06/2007FOFB at Diamond1 Fast Orbit Feedback (FOFB) at Diamond Guenther Rehm, Head of Diagnostics Group.
S. A. spoločnosť s r.o. Bratislava. Core activities of the S. A. 4 Computer technics 4 Data transfer services 4 Fiscal modules - POS 4 Software 4 Control.
Marco Lonza, “The Control System of the ELETTRA Booster Injector” ICALEPCS2005, Geneva October 2005 The Control System of the ELETTRA Booster Injector.
DFC on behalf of Pep Ribas and the controls software and electronics group Bliss day out January 15 th 2007.
3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 1/33 Preparation work for ALBA’s Closed-Orbit BPMs 3rd Libera Users.
SNS Integrated Control System EPICS Collaboration Meeting SNS Machine Protection System SNS Timing System Coles Sibley xxxx/vlb.
Workshop “Vacuum systems of Synchrotron Light Sources“ organized by MAX-LAB & ALBA Barcelona, th September 2005 Instrumentation and Vacuum Control.
INTRODUCE OF SINAP TIMING SYSTEM
Overview of SINAP Timing System Electronics Group Beam Diagnostics & Control Division SINAP.
Experience of Developing BEPCII Control System Jijiu ZHAO IHEP, Beijing October 18, 2007.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
The Machine Protection System for the European XFEL E. Castro on behalf of the MPS team
Status of the control system of Alba Introduction The construction of ALBA, the 3 GeV Synchrotron Light Source near Barcelona (Spain) is proceeding according.
Status of BEPCII Timing System Presented by Ge Lei IMAC 2006.
Vacuum Controls Status MACS week December 2010 PP a-JWA-VacControlStatus.ppt Joachim Wallner 1.
Stephen Schuh Vacuum Controls SCR and 16 November 2005 Vacuum Controls System Concept Review and Preliminary Design Review.
The microIOC Family Gasper Pajor EPICS Collaboration Meeting Argonne National Laboratory June 2006.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
"Witness of a new dancer". 14 October TANGO at ALBA Alba team: Presented by DFC. Witness of a new dancer.
1 BROOKHAVEN SCIENCE ASSOCIATES Integrated Testing George Ganetis Integrated Testing ASAC Review October 14-15, 2010.
K. Luchini LCLS Injector /BC1 Magnet PS Final Design Review, March 30, Injector and BC1 Magnet PS Controls K. Luchini.
Experience of Developing BEPCII Control System Jijiu ZHAO IHEP, Beijing ICALEPCS2007 October 18, 2007.
Steve Lewis Gas Attenuator 11 December Instrumentation & Controls Steve Lewis 11 December 2006 LCLS Gas Attenuator Preliminary.
February 2010 ALBA Synchrotron Light Source Francis Perez.
Status of Vacuum Control System MACS week June 2011 PP a-JWA-VacControlStatus.ppt Joachim Wallner 1.
Managed by UT-Battelle for the Department of Energy SCL Vacuum Control System Upgrade Derrick Williams
CEA DSM Irfu July 19th 2013-Françoise Gougnaud - Status of EPICS control for ECCTD 1 Françoise Gougnaud Irfu/SIS.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
LCLS Control Group FAC – 06 Installation October 27/28, Plans for 2006 Installation October 27, 2005 Installation.
CEA DSM Irfu SIS LDISC 18/04/2012 Paul Lotrus 1 Control Command Overview GBAR Collaboration Meeting Paul Lotrus CEA/DSM/Irfu/SIS.
FPD SOFTWARE TEST MOTIONS / CONNECTIONS / CONFIGURATION / SOFTWARE / TESTS / CONCLUSION Lionel Peyrichoux 14 March 2001.
ALBA RF System Paco Sanchez - 13th ESLS RF - DESY, 30 September Paco Sanchez, RF Group, CELLS (Consortium for the Exploitation of the Synchrotron.
Daniel Piso Fernández Some Ideas about Integration Support Cases and PLC Activities at Controls Division.
CS section activities Industrial controls Luca Arnaudon David Glenat David Landre Slawomir Totos Ruben Lorenzo-Ortega Digital hardware John Molendijk.
Danish Ali Nawaz 1CLIC workshop 2016 Danish Ali NAWAZ, BE-ABP LEETCHI: Drive Beam Electron Source Automation Control.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
Failure Analysis Tools at DESY. M. Bieler, T. Lensch, M. Werner, DESY ARW 2013, Melbourne,
ICS interfaces Timo Korhonen ICS Apr 22, 2015.
V Review SPARC Diagnostic & Control Status G. Di Pirro On behalf control and diagnostic group.
Experience of Developing BEPCII Control System
MicroTCA Development and Status
CC LLRF SM18 test plan and BA6 infrastructure
SESAME Control System Status
Device Pool Status Report TANGO Collaboration Meeting April 17, 2008
J. Meyer European Synchrotron Radiation Facility (ESRF)
PLC-based control systems at SOLEIL - ICALEPCS 2017
SESAME Control System Status
DFC Tango meeting, Hamburg, September 17th 2007
Concepts and practices applied to PLCs at SOLEIL From specification up to development. ICALEPCS 2017 Patrick ROMMELUERE on behalf of Electronics, control.
Timing and Event System S. Allison, M. Browne, B. Dalesio, J
Yannick Dietrich François Bouvet SOLEIL
RF Local Protection System
MPS commissioning at ESS
Control Systems for the APTM and GRID
Electronics, motion control and verification
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
Rack installation and local tests for the MEBT Chopper Rack
Presentation transcript:

DFC on behalf of controls software and electronics groups Tango meeting March 19 th 2007 Status of Alba Controls

DFC 2

3 Outline EDMS Project follow up, Naming Projects –Timing, EPS, PSS, Fast interlocks –Vacuum, RF,IDs, Power Converters, Linac, Diagnostics, Motors Installation. Cabling Schedule

DFC 4 Project’s follow up

DFC 5 EDMS: Technical specs

DFC 6 Timing Communication of events. – Events are generated by: Internal counters (32 bit) External trigger signal or software. Optic event fiber: multimode 850 nm. 25 ps rms jitter in the output and one event ~280 Event receivers

DFC 7 Operators interfaces timing tests:

DFC 8 Fast interlocks and fast data loggers EVG Timing Fan Out EVRFIM-1 EVR FIM-1EVR FIM-1 FIM-2 General Interlock DetectionTTL In FIM-2 Patch Panel TTL Remote Interlock from Timing System 150m Optic Duplex Fiber FIM-1 Input Out put FIM -4 Input Outp ut FIM- 2 Input Outp ut Output Inp ut FIM-3

DFC 9 Equipment Protection System

DFC 10 Vacuum racks

DFC 11 PSS

DFC 12 Diagnostics BLM –Bergoz + Cosylab 485 CCD –Prosilica GigE –Frame grabber + Video Euresys + Jai Liberas –Server (soleil) –+ Python libraries

DFC 13 Ion Pumps –Varian double ? Penning & IMG –MKS ? Valves –Controlled by PLCs GUIs. See presentation by Vacuum Controls:

DFC 14 RF LAb 1 Transmitter 1 Cavity –Test of tunning of the plungger ADLINK DI/DO. –Test of Analog LLRF regulation ADLINK AI/AO –Test of Digital LLRF regulation. Sundance 1 PSS

DFC 15 IcePaP Microstepping (8A, 70V, 330W) Motion test bench Human interfaces Motion Configuration Icepapcms: Config tool for motors System/Crate level –Name of the driver –Status –Current… –Limit switches For each driver: –Enable/disable –Double click to configure it.

DFC 16 Power converters Digital regulation Ethernet connections Correctors and Fast Orbit Feed Back –Specification going on Linac ?

DFC 17 Beamlines

DFC 18 Installation: cable databases

DFC 19 Schedule RF, Vaccum protos, Diagnostics, etc.Linac 2007 PreinstallationCommissioning 2008 Installation ID inst CommissioningID commissioning

DFC 20 Thank you for your attention P.Readman D.Beltran R.ButzbachE.TaurelD.Fernández F.Becheri R.Ranz S.Rubio O.Matilla J.V.GiganteT.Coutinho J.Ribas L.Krause S.Blanch R.Suñé

DFC 21

DFC 22 General components –Crates CPCI (CPU: ADLINK & INOVA) –ADC/DAC/Counter (NI & ADLINK) PLC bench test –Siemens, Wago, Beckhoff, ABB Hardware Siemens WagoBeckhof ABB CPCI Application programs API Clients(GUI, Scripts) Hardware Dserver (TANGO)

DFC 23