LBT Q4 2007 Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.

Slides:



Advertisements
Similar presentations
Network Design Issues Design and Documentation Prepared by: Aline L. Mendoza.
Advertisements

LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
INTD 51 human environments building systems. heating/ventilation/air-conditioning (HVAC) maintain a comfortable indoor climate control temperature and.
Various services have to be connected. Here the sewer is being connected and pipes laid for storm water removal.
Example of a successful lining Description: Tuff Stuff is sprayed as a protective lining onto a boat hull. The lining with TS provides a high level of.
Energy Delivery Delivering energy safely, reliably, efficiently and affordably. Holland Bottom 500/161/115kV Substation.
Cable and Service Installation David Warner Colorado State University May 11, 2009.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
1 MICE-Video Conference Status of MICE Hall Contents: General status Electrical Mechanical Preparing for Steps II & III Risks and worries Andy Nichols,
LBT Q Eng/SW Review HBSC Hydrostatic Bearing System Sargent/Kern.
Introduction to a pit installation
Energy Performance and Moisture Control of Ceilings and Roofs 1.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
Operational Research (O.R.) case studies. What’s the problem?
LBT Q Engineering Review MCSC Mount Control System.
Utilities 14 October 2008 Martin Nordby, Gordon Bowden.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
1 LBT Q Eng/SW Review ECS: Enclosure Control System.
LBT Q Engineering Review Swing Arms (SWA) Apr-04LBT Q Engineering Review Highlights (Q4/2007) The PF SAs lost their cable trays The.
LBT Q Engineering and Software Review ENGG Engineering General.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Al Pendzick LEReC Civil Construction.
1 LBT Q Engineering Review ICS – Instrument Cooling System.
Food Safety Training Course Co-financiado:. Work facilities and Equipments.
1 LBT Q Eng/SW Review PLMG: Plumbing. 2 Highlights (Q2/2008) Have recently replaced worn contactors in the Primary Loop chillers Have recently replaced.
EHN1 North Wall Dismantling Schedule Bastien Rae.
C1 inspection results T. Meighan. C1 Lead Block Area Upper chill plates bowed upwards from side pressure (?) Top fingers pulled away from winding pack.
LBT Q Engineering Review DYB. 21-Dec-2007LBT Q Engineering Review Highlights (Q4/2007) Currently in Commissioning Phase Currently in Commissioning.
LBT Q Engineering Review Instrument Cooling.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
Home Energy Saving Tips Save Money While You Help The Environment.
NA YETS: schedule week by week S. Evrard.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Engineering Review SAB Static Balancing.
1 LBT Q Engineering Review PLMG: Plumbing, includes IC system, chiller systems, instrument lab cooling, and LUCIFER cryo-compressor cooling.
Home Energy Saving Tips Save money while you save the environment.
Save Money While You Help the Environment.  Lighting accounts for more than 10 percent of electric bill  Change to compact florescent lights (CFLs)
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
1 LBT Q Eng/SW Review PWR: Site electrical power.
LBT Q Engineering Review HBSC Hydrostatic Bearing System.
LBT Q Engineering Review ESW Engineering Software.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
1 LBT Q Engineering Review ECS: Enclosure Control System, includes the dewpoint sensor, CA system upgrades, grounding, enclosure track performance.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
Advanced Energy Engineering Technology Modeling Building Energy Systems Session 9: Modeling heating and cooling systems.
1 MICE PM Report Infrastructure/integration progress Electrical work AFC, diffuser, etc Help with project control & staffing issues Worries & problems.
LBT Q Engineering and Software Review ENGG Engineering General.
Installing a Backflow Cage. Verify the Backflow and Area.
1 LBT Q Eng/SW Review PWR: Site electrical power.
Page 1 MCQUAY DIGITAL SCROLL SYSTEM Installation.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/21.
LBT Q Engineering Review PMCD. 21-DEC-2007LBT Q Engineering Review Highlights (Q4/2007) Draft of System Overview and O&M manual complete except.
LBT Q Engineering Review DAQ. 19-Apr-2007LBT Q Engineering Review Housekeeping System Requirements Interface directly to the Agilent 34970A.
Wired Transmission 24 Wired Transmission 24. Wired Transmission 24 This is about the method used to actually transmit or send data That means actual wires.
LBT Q Engineering Review HBSC Hydrostatic Bearing System.
09/21/07Shutdown’07 Week 7 F.G. Garcia1 MTA beam line installation Weekly Report September 21, 2007 Period covered: September 14 th September 21 th (Week.
(1/17) 14/11/13 – RadWG meeting PS East Area Update Outline Layout updates of the facility Conveyer Rail system Mock-up Other news.
1 LBT Q Eng/SW Review PLMG: Plumbing, Chiller Systems.
LBT Q Engineering Review Swing Arms (SWA). 10-Jul-2007LBT Q Engineering Review Highlights (Q2/2007) The right secondary arm is wired and the.
LBT Q Engineering Review Primary Mirror Cells.
Onsite Work Summary RIKEN/RBRC Itaru NAKAGAWA. Completed Re-capacitation St-1, Gap-1 N&S Completed St-2 Terminators Install to South Oct.5 (except for.
1 LBT Q Eng/SW Review PSPI: PEPSI installation preparation.
What is energy? Energy is the ability to do work or cause a change.
CE Status: Activities executed until 03/08 and ongoing
Tagger Microscope Mounting, Shielding & Cooling
Pump House wall before installation.
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Kalamazoo Yo Soy (I Am) Missionary Church.
Presentation transcript:

LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications

2 Highlights (Q4/2007) PEPSI bridge location utilities installed, except power PEPSI bridge location utilities installed, except power PEPSI bridge location, have installed clean dry air, 47 deg chill water, and fiber optic PEPSI bridge location, have installed clean dry air, 47 deg chill water, and fiber optic Started installation of power Started installation of power Started on raising height of florescent lights and boxes Started on raising height of florescent lights and boxes Schedule PEPSI team, Frank and Emil visit first of year 2008 Schedule PEPSI team, Frank and Emil visit first of year 2008 Cable chain designs have been tested and failed controlling the fiber motion across the elevation axis Cable chain designs have been tested and failed controlling the fiber motion across the elevation axis Installed AZ hole support structure Installed AZ hole support structure

3 Open Issues Technical Technical None None Schedule Schedule Part scheduled Part scheduled Financial Financial Cost of paint and materials Cost of paint and materials Resource Resource Identify paint and paint contractor Identify paint and paint contractor

4 Progress (Q4/2007) Install 47 deg coolant, clean dry air, and fiber to PEPSI bridge location Install 47 deg coolant, clean dry air, and fiber to PEPSI bridge location Working on other modifications to the pier Working on other modifications to the pier Fiber run control cable chain being worked on Fiber run control cable chain being worked on AZ hole support structure is installed AZ hole support structure is installed Gallery brackets are installed Gallery brackets are installed

5 Planning (Q1/2008) Terminate fibers Terminate fibers Define and install the connection point box Define and install the connection point box Install power Install power Move J box in pier up to 4 M, Q Move J box in pier up to 4 M, Q Move florescence lights in pier up to 4 M, Q Move florescence lights in pier up to 4 M, Q Installing energy chain/ cable chain Installing energy chain/ cable chain Install services, E-net, E-stop, telephone Install services, E-net, E-stop, telephone Insulate all pipe carrying liquids Insulate all pipe carrying liquids Epoxy paint entire floor Epoxy paint entire floor Paint walls with epoxy paint Paint walls with epoxy paint