CO#4-11046OS POSITIVE TRAIN CONTROL PROJECT Change Order #4 October 17, 2013 Related to Agenda Item 11.

Slides:



Advertisements
Similar presentations
What’s New in IPEDS 2005 OkAIRP Annual Conference Broken Arrow, OK Nov 4, 2005 New Strategies for Data Collection & Data Access Tools.
Advertisements

Bids ranged from $992,264 to $1,999,305 JO-SH General Engineering was apparent low bidder Lash Construction 2 nd $1,156,453 Construction to start.
FAA 29th ANNUAL AIRPORT CONFERENCE. Presenter’s Background Structured Design Unstructured Design Design Activities Special Concerns Lessons Learned Benefits.
810 Mission Avenue 3 rd Floor Refurbishment October 17, 2013 Related to Agenda Item 14.
Springfield Public Schools 1 Project Management Methodologies in Support of Student Achievement.
1 Purpose  Summarize Monday’s workshop  Update on the Radio System – confirm staff’s recommendation  Jail Expansion – discussion/direction  Discussion.
1 Reducing Waste and Improving Health Care Processes Through the Application of Lean Sheri Eisert, PhD Associate Professor University of Colorado Health.
Public Safety Radio System Upgrade County Administration / Public Safety November 23, 2010.
Unified Communications as a Managed Service DIR Telecom Forum, October 7, 2014 ROY ALBRECHT, Director, Sales and Marketing Globalscope Communications.
King George Wireless Authority Joseph W. Grzeika Chairman King George Board of Supervisors.
Presentation to Qwest Travel Services Meeting and Events Commodity Meetings Where Everything Works.
ISO/IEC JTC1 SC25 WG3 Review for WG1 October 01, 2013 Kista, Sweden ISO/IEC SC25 WG1, Kista1 SC25 WG1 N1637.
Jump Starting ITS Deployment in Los Angeles County using Wireless Communications Lessons Learned.
Alachua County Community Development Block Grant Application for Funding 1 st Public Hearing June 28, 2011.
Template v5 October 12, Copyright © Infor. All Rights Reserved. 1 Infor LN: v v10.4 Estimating Differences Rollout training.
Purchasing Advisory Council August 19, Agenda Announcements  State of Washington mandatory training  Amazon Smile & Amazon.
1 Implementing A PMO & Enterprise Project Management at NIH February 3, 2005 Bill Vesey, PMP Manager EPM Consulting Practice Forte Systems, Inc General.
1 Management Report on Bradley West Project BOAC Meeting October 5, 2009.
1 Universal Pre-Kindergarten (UPK) Scope of FY08 Evaluation Activities December 11, 2007.
WISC Standing Committees Summary. Why Standing Committees? Continuous improvement or key club activities Expands the clubs ability to execute beyond basics.
Commonwealth of Virginia Department of Minority Business Enterprise SWaM Update Stacy L. Burrs, Director April 27, 2006.
Enterprise Archiving, Retention and Discovery System Jim Albert Deputy Director Department of Information Services April 19 th 2007.
Regulatory Streamlining Task Force Update Discussion Item December 6, 2011 Board of County Commissioners.
Broadcasting Participation Fund Inc. Update November 24, 2015 Presented by Andre Auger, CPA, CGA, CFE Costs Officer and CEO
Pasadena Water and Power AMENDMENT TO LETTER AGREEMENT (CONTRACT NO. 20,946) WITH SOUTHERN CALIFORNIA EDISON TO INCREASE THE TOTAL NOT-TO-EXCEED AMOUNT.
State of Georgia Release Management Training
Documentation Javadocs. Design/Documentation An essential ingredient of good Object Oriented programming is known as design by contract. This means that.
Responsible use of HFC’s Dutch-AREA approach Joop Hoogkamer NVKL: Director Technology and Environment AREA: Member of the Board.
California Integrated Waste Management Board Special Board Meeting CONSIDERATION OF BOARD ACTION OVER MADERA COUNTY LEA Sacramento, CA October 3, 2005.
ITS Device Standards & Procurement Project PURPOSE  Develop a series of Standards & Strategies designed to guide and provide consistency across the development.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Regional Water Reclamation Facility 23-MGD Expansion Project Joe Mouawad, P.E. Senior Director.
PORT OF TACOMA. Contract Increase & Award Pier 7 Structural Repairs Request authorization to expand the scope of existing A/E Contract No and.
PORT OF TACOMA. Request authorization to expand the scope and increase the authorized amount of Contract No , for work associated with the WUT.
Empowering Your Business Infrastructure CORPORATE PROFILE PRESENTATION.
PORT OF TACOMA. Request authorization for the Executive Director to Award Purchase Order No for the purchase of 40 timber piles for repairs of.
City Council Meeting Tuesday, October 22, Background March 5, 2013: Marinship 101 to Council May 7, 2013: Council formed Steering Committee to work.
Morelli Park Reconstruction and Expansion Project Public Hearing and Award of Construction Contract Stockton City Council and Stockton Redevelopment Agency.
1 | emwd.org AquaSel Brine Concentration Demonstration Project Khos Ghaderi, P.E. May 18, 2016.
OCLC Online Computer Library Center 1 Introduction.
Container Freight Station, Utilities and Drainage at Bayport Container Terminal (RFQ-148) Brenda Trevino, P.E. Project Manager October 11, 2016.
Pre-Bid/Proposal Meeting
FiberCo/WaveCo Update
Western Michigan University Central Power Plant
Total Cost of Ownership: Considerations
Case Road Sewer Joe Mouawad, P.E. October 27, 2016.
Perris Water Filtration Plant Membrane Upgrade – Phase I
Green Line Train Protection System
Memorandum of Understanding with GE Osmonics, Inc
(Additional materials)
Voice Radio System Replacement Project
Phase 3 Solar Feasibility Study Findings and Recommendations
Cost of Service Analysis & Rate Design
Reach 4 Air Valve Replacements Award of Construction Contracts
Planning for success is critical
Planning is a critical success factor
Board of Education Workshop – April 2015
Operating and Maintenance Contracts Breakout Session
San Diego County & Imperial County
AUTHORIZATION TO ENTER INTO A PURCHASE ORDER CONTRACT WITH ONESOURCE DISTRIBUTORS TO FURNISH AND DELIVER ELECTRIC UTILITY PARTS AND MATERIALS August 28,
Contract Award to TMG Utility Advisory Services, Inc
M E A S U R E ‘G’ P R O G R A M U P D A T E
Technology Department Annual Update
Huntsville High School Softball Program Upgrades
Change Order 4 Contract J06026C01 JIWRF Nonhazardous Site Lighting Upgrade Restore ED Original Delegated Authority Approve Changes to Total Contract.
Conveyance Operation and Maintenance (O&M) Manual
Change Order Number Five, Contract M03037P01, Professional Services, 2050 Facilities Plan – Ultimate Build Out, and Approve Changes in Total Project Cost.
Sludge Dewatering Filter Press Controls Upgrade at SSWRF
Asset Management Plan Development and Implementation Support
Building 360 Freight Elevator Rehabilitation at SSWRF
Presentation transcript:

CO# OS POSITIVE TRAIN CONTROL PROJECT Change Order #4 October 17, 2013 Related to Agenda Item 11

2 Background Purpose: –Change in scope of the original PTC contract (11046 OS) removing the peer to peer radio communications network and adding the engineering, procurement, installation, test and commission of the network utilizing the fiber optic infrastructure previously installed. Background: –The PTC contract originally awarded to Herzog did not originally utilize the fiber optic network. –Eliminating the peer to peer radio communications and using the fiber network provides for future expandability and a more robust system.

3 PTC Contract OS Addition = $2,905, –Includes the engineering, procurement, installation, testing, and commissioning of the fiber network. Deduction = $1,815, –Deletes existing scope associated with the Wayside Segment that is no longer being implemented including field installation, including labor and equipment, wayside communications component material, spare material, test equipment and special tool allowance, and training. Net = $1,089,567.03

4 Recommendation Staff recommends that the Board authorize the Executive Director to issue a contract change order to Herzog Technologies, Inc. to deduct scope to remove the peer to peer radio communications network in the amount of $1,815, and to add scope in the amount not-to-exceed $2,905, for the communications network utilizing the fiber optic infrastructure, with the net difference being $1,089,567. These changes will allow the PTC project to comply with the performance specifications required for the PTC project.

5 Questions?