M. Battistin – 8 th April 2009 DC Project 1 M. Battistin 8 th April 2009 Detector Cooling Project - The present M&O Agreement.

Slides:



Advertisements
Similar presentations
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Advertisements

Procurement Management
Surety Bond Claims State of Colorado 05/15/2013. State of Colorado Surety Bond Overview Construction Contract Surety Bonds  Bid – Guarantees bidder will.
1 Basic Elements of a Collective Agreement ILO-UNI Course on Collective Bargaining Postal and Telecom Sector 22 March – 2 April 2004 Turin.
Tesco PLC has awarded the contract to maintain its uninterruptible power supplies (UPS) at its nationwide distribution centres to Uninterruptible Power.
Wet Sprinkler Systems Identifying components of, and inspection and testing procedures.
Joint Staff School Committee Training. Why do we need a JSSC? Provide orderly and professional means of improving educational programs, conditions within.
Company LOGO C o n s t r u c t i o n R e p o r t P r o f e s s i o n a l C o n s t r u c t i o n M a n a g e m e n t 2006 Prepared by:
Health and Safety Executive Control of Legionella Howard Whittaker Principal Inspector FOD Leeds.
Retirement Home Regulated under the Retirement Home Act, 2010.
The Fair Labor Standards Act (FLSA) Employment Services
Looking to Rent a House? Kelly Smith 50 Park Place, Cathays Park Campus 2 nd Floor, Cardigan House, Heath Park Campus.
IBL CO 2 cooling control system development status Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI Florian Corbaz – EN/CV/DC.
Vladimir Liberzon Oksana Sakhraui Victoria Shavirina Spider Management Technologies, Moscow, Russia
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Paolo Guglielmini TS / CV / DC08th April 2005 BIDDERS’ CONFERENCE Invitation to Tender 3307 Supply and Installation of water cooling equipment for the.
Facilities Institute July , 2012 Houston, Texas CONSTRUCTION AND RENOVATION WARRANTY/GUARANTEE What Do You Get And When Does It.
Maintenance Specificities in the CERN Cooling and Ventilation Group Asset and Maintenance Management Workshop CERN, November 2013 I. El Hardouz,
Presented By Robert Lawson Assistant Director Equipment Services Fort Worth, Texas Assistant Director Equipment Services Fort Worth, Texas.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire 1CERN - 4th November 2011 Experience from Construction.
11/04/15Asansor Istanbul April Protection against unintended car movement EN 81-1/2 A3 EN 81-1/2 A3 Wolfgang ADLDINGER Chairman – Components.
> 30 kW Interconnection Work Group Meeting June 19, 2007.
Is Your JOC Program Audit Worthy? z Scott Creekmore.
RP PROCEDURE FOR FLUID ANALYSIS Detector Cooling Project - 16 th June 2011 Heinz Vincke, Nadine Conan DGS/RP..... based on EDMS document # prepared.
Ratepayer and Customer Rights Energy Regulatory Partnership Program Abuja, Nigeria July 14-18, 2008 Presented by Robert W. Kehres.
SAFETY MANAGEMENT SYSTEM Non Conformance Reporting
Operation & Maintenance in ST-MA presented by Rui Nunes.
19 May 09P. Tropea1 Fluorocarbon systems –SS1 hydraulics completed, now under commissioning –SS2 connections and sensors installation done –Pixels ready.
1 H. Pernegger/CERNIBL cooling review 15/5/2012 IBL Cooling Requirements H. Pernegger.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire SSD/SDD Proposal Upgrade 30/08/2012
J. Direito - M. Battistin – 28 th May 2010EN/CV/DC J. Direito, M. Battistin (EN/CV/DC) 28 th May 2010 Detector Cooling Project III Thermosiphon Workshop.
2 IMPACT - THE FIRE PERMIT = Hot Work Permit 3 Welcome ! This course is linked to the use of IMPACT, so it is assumed that: You know how to use IMPACT.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
CMS Proposal for a Maintenance & Operation agreement with EN/CV/DC for fluorocarbon detector cooling circuits v.2 P. Tropea For the CMS experiment.
Legal Responsibilities while Living in a Vertical Village An Owner’s perspective: John Hutchinson - OCN.
06/01/20161 Benny Hoff TÜV NORD Sweden AB AFS 2002:1 Use of pressure equipment.
5 th May 20061M. Battistin CERN LEAF Committee 2/R-030 8h30 - May 5 th 2006 Michele Battistin (TS/CV/DC) TS M&O agreement for Detector Cooling installations.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
Thermosiphon project management and quality assurance EN/CV/DC Presentation done by Elena Perez Rodriguez For further information contact
Application of a CAMMS to CERN’s cryogenic installation park G. Perinić and S. Knoops, CERN.
CMS consolidation activities of detector cooling system Detector cooling project P. Tropea.
IBL CO 2 cooling planning 03 July 2013 Jan Godlewski, Bart Verlaat, Lukasz Zwalinski 1
By Luis Figueroa.  The job I am interested in is mechanic because I think fixing cars is really cool and interesting in how the car works.  Also my.
Quality assurance - documentation and diagnostics during interventions Corrective maintenance seen from the Technical Infrastructure operation Peter Sollander,
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
SAFETY SERVICES PROVISION I. Bejar Alonso. Transfer Executive Safety Tasks from SC to Departments In application of the document “Safety policy at CERN”
17 th November 20061M. Battistin CERN LEAF Committee 2/R-030 8h30 – November 17 th 2006 Michele Battistin (TS/CV/DC) TS/CV Detector Cooling On call and.
WA 104 : TOOLS FOR WORK ORGANIZATION IN THE CLEAN ROOM Erwan Bertrand Olga Beltramello.
Service Agreements Emmanuel Tsesmelis CERN / TS-LEA RRB Scrutiny Group 31 August 2006.
SMB Service Status 111 th ACCU Meeting Tuesday, 8 march 2016.
Gasunie is one of the biggest gas infrastructure companies in Europe. Within the company, we give safety the highest priority; it forms the basis of our.
SMB SMB-SE group L. Scibile 1. SMB Mandate The SMB-SE Group is responsible to provide, to operate, maintain and to renovate the civil engineering infrastructures.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
Heritage Trust Fund Grant Orientation Session. HTF Staff and Contact Information Katrina Ringler Grants Manager ext. 215
For more information, please contact 24/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Mine Safety and Health Administration South Central District Elwood M. Burriss Staff Assistant South Central District Dallas, Texas
David BAILLEUX On behalf of the Caltech group Issues for the Laser Monitoring System M&O - US CMS ECAL IB meeting 19 March Chilled water supply.
LOGO Heating Contractor HOW TO FIND THE RIGHT The Benefits The Questions Contact Information Goes Here Do you have a state license? How long have you been.
1M. Battistin M. Battistin CERN EN/CV/DC 9 th July 2009 CO2 kick-off NIKHEF - Cooling activities organization at CERN 9 th July 2009.
HOW TO SELECT THE BEST PLUMBING COMPANY? HOW TO SELECT THE BEST PLUMBING COMPANY?
Demineralised water cooling system
Cryoplant Controls Installation
Safety in Construction and Upgrade Phases
M. Battistin CERN EN/CV/DC 9th July 2009
An-Najah National University
Latest standardisation measures for lifts
Low temperature chiller Market Survey
PDO Second Alert Date: Incident title: Fatality What happened?
Fire Alarm Tech Practice Test # 16 NICET
Presentation transcript:

M. Battistin – 8 th April 2009 DC Project 1 M. Battistin 8 th April 2009 Detector Cooling Project - The present M&O Agreement

M. Battistin – 8 th April 2009 DC Project 2 Scope (EDMS )

M. Battistin – 8 th April 2009 DC Project 3 Geographical limits EN/CV/DC Cooling station Connection piping Distribution manifolds Distribution lines Heating device EN mandate EN mandate Experim. mandate Experim. mandate Detector EN/CV Cooling network

M. Battistin – 8 th April 2009 DC Project 4 Services 1.Preventive and corrective maintenance: PPM, CAMMS; 2.Stand-by duty service: 2 hours + two persons rule assured by the Experiment; 3.Operation: fine tuning, supervision; 4.Fluid management: level monitoring, procurement and refilling, quality monitoring; 5.Spare parts: store in bdg 264; consumables and “important components” (EDMS ) still under approval.

M. Battistin – 8 th April 2009 DC Project 5 Duration 1.Tacitly yearly renewal; 2.6 months notice (before June 30 th ) 3.Agreement other Experiments (share of fixed costs) Resources and costs will be discussed in other meetings…

M. Battistin – 8 th April 2009 DC Project 6 What we need to point out 1.Who is the M&O responsible for the installation? 2.Who provides the “installation supervisor” in conformity to the Safety Code A9? 3.Safety: a risk analysis shall be performed jointly EN/CV/DC + Experiment

M. Battistin – 8 th April 2009 DC Project 7 The garage-service story 1.I am the owner of 10 cars and I want to follow up the maintenance and operation by myself: I decide if, when, where do the maintenance I check by myself the oil level and the tires pressure I pay the garage for any single intervention I cannot blame nobody for the failures (a part proven bad maintenance) 2.I am the owner of 10 cars and I prefer to leave the management of their M&O to a specialized garage: The garage decides if, where to do the maintenance When the garage requires to do a service we agree on the schedule I pretend guarantees on the performances/availability I notice anomalies to the garage for them to check I can blame the garage in case of failure and ask him to rescue out of working hours I pay a forfeit plus spare cost in case of accident

M. Battistin – 8 th April 2009 DC Project 8 M&O contracts 1.M&O contract with guarantee of means: I decide if, when, where do the maintenance I perform by myself the daily operations on my system I pay a company to provide me manpower for operation assistance and preventive and corrective maintenance I plan for them I pay all spare parts The contractor guarantee me the means only 2.M&O contract with guarantee of performances: I entrust the organization of the M&O to a company I leave them define and execute the maintenance plans I inform them of my planning constraints I pretend guarantees on the performances/availability When I notice anomalies and I suggest investigation and corrections I pretend intervention inside or outside the working hours in case of failure I pay a forfeit plus spare cost in case of accident