VARIABLE GENERATION OPERATING RESERVE TASK FORCE VARIABLE GENERATION OPERATING RESERVE TASK FORCE Don Badley, Chair VGORTF Report to Operating Committee.

Slides:



Advertisements
Similar presentations
1 Demand-Side Management Influence on Reliability NERC Demand-Side Management Task Force (DSMTF) Rick Voytas, Chair November 2007 Presented To The U.S.
Advertisements

WECC - Addressing Commercial Practices Ed Beck Chair, Market Interface Committee.
Enhanced Curtailment Calculator Task Force Report
WECC - Addressing Commercial Practices Ed Beck Chair, Market Interface Committee.
1 ColumbiaGrid Activities Supporting Integration of Renewable Generation Presentation to the Market Interface Committee At the October 30, 2008 Meeting.
WECC TEPPC – March 14, 2008 PCC – TEPPC Coordination Roles & Responsibilities – RE Kondziolka 1 PCC – TEPPC Coordinating Roles and Responsibilities WECC.
Intra Hour Tagging/Oasis During System Contingencies The transmission tagging process was initially developed to solve an after the fact accounting issue.
Ad Hoc Bulk Electric System Task Force Update RPIC February 19, 2009.
NREL Wind Integration Workshop By Electric Power Systems, Inc. June 28-29, 2010.
1 ETSO views on Transparency Urban Keussen Member of ETSO Steering Committee Head of Task Force on Congestion Managament ERGEG Public Hearing 6th July.
Power Supply Adequacy Assessment Model/Methodology Review Steering Subcommittee Meeting January 29, 2010.
WECC PCC Meeting Salt Lake City, UT March 26, 2014.
Jim Mcintosh Director, Executive Operations Advisor California ISO Independent Energy Producers 2011 Annual Meeting - October 5, 2011 Stanford Sierra Conference.
Slide 1 Large Wind Integration Challenges for Operations / System Reliability By : Steve Enyeart, BPA With contributions from: Bart McManus, BPA Roy Ellis,
Utility Regulation March 10, 2011 Raj Addepalli Deputy Director, Electric, Office of Electric,Gas and Water New York State Department of Public Service.
Variable Generation Subcommittee Update to PCC Ann Finley - VGS-PCC Liaison Metropolitan Water District of So. Cal October 7, 2014 Salt Lake City, Utah.
1 Smart Distribution Systems: Sustainability Issues S. S. (Mani) Venkata Alstom Grid and University of Washington (UW)
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
1 The Effects of Integrating Wind Power on Transmission System Planning, Reliability, and Operations Phase 1 Preliminary Overall Reliability Assessment.
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
Ludington Pumped Storage Plant and Wind Power Operational Considerations David Lapinski Consumers Energy Company June 16, 2009.
Long Term Study Task Force Update to ETWG ERCOT Long-Term Study: Scenarios, New Software, and Emerging Technology Assumptions January 27, 2012.
Lynn Coles, PE National Wind Technology Center National Renewable Energy Laboratory Golden, Colorado USA 10 FAQ’s (Frequently Asked Questions) About Wind.
Turkish Power System Overview March 2012
Sai Moorty ERCOT Integration Options into ERCOT systems.
NASHVILLE ELECTRIC SERVICE | Association for Financial Professionals March 2012.
Copyright © 2015 Clean Power Research, L.L.C Prepared by Ben Norris, Clean Power Research on behalf of Utah Clean Energy April 27, 2015 Net Metering Workgroup.
Avista’s Flexibility Overview James Gall Senior Power Supply Analyst Contact:
Ann Finley VGS-PCC Liaison VGS Discussion March 25-26, 2014 Salt Lake City, Utah.
Victoria L. Ravenscroft Senior Policy Analyst Reliability Planning and Performance Analysis Information Sharing Policy Update March 25-26, 2014 Standing.
1 18-Month Outlook October March 2005 Presented by Greg Hine IMO Long-Term Forecasts and Assessments.
Frankfurt (Germany), 6-9 June 2011 MARTENSEN – DE – Session 4 – 1221 The Cell Controller Pilot Project (CCPP): From Surviving System Black-Out to Market.
Distributed Generation Registration Threshold Protocols Section 16.5 (5) ERCOT Staff DER Workshop June 18, ERCOT Public.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
Wind ELCC Calculation Comparisons and ERCOT’s NERC LTRA Capacity Forecasts GATF Meeting, June 24, 2014.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
Rob Oglesby Executive Director California Energy Commission C ALIFORNIA E NERGY P OLICY G OING F ORWARD.
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
Northern Europe Electricity Regional Initiative 5th Stakeholder Group Meeting Transparency in the region 26. May 2010, Copenhagen Jan-Welf Selke Bundesnetzagentur.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Analysis of ERCOT Regulation Service Deployments during 2011 David Maggio Market Enhancement Task Force Meeting 3/29/
October 29, Organizational role of Short-Term Planning and Hydro Duty Scheduling Relationship to other groups in BPA Planning and analysis job.
Great Lakes Region Treasurer Preparation Treasurer Office Duties and Responsibilities.
Drinking Water Source Protection Ministry of the Environment Source Protection Programs Branch March 2010.
09/17/2006 Ken Donohoo ERCOT Peak Day August Initial Settlement Data by Fuel Type.
Craig Williams Market Interface Manager August 21, 2014 ISAS, Portland, OR.
DWG – Dependable Capacity Kevin Harris, ColumbiaGrid TEPPC\Hydro Modeling Task Force - Chair.
George Zhou, VGITF Chair October 14, 2015 Salt Lake City, Utah Variable Generation Interconnection Task Force Update to PCC.
RAWG Agenda Item LAR Data WECC Staff. Data Elements Generator information – Existing – Changes Monthly Peak Demand and Energy (actual year and.
Joint California Energy Commission and California Public Utilities Commission Bulk Storage Workshop November 20, 2015 Kelly Rodgers Energy Program Manager.
MISUG TAC Update Jackie Ashbaugh ERCOT 3/7/ TAC3/7/ /22/2011 Meeting Focus on the high priority items from MISUG: Review task list prioritization.
What’s happening in Spain? Access to the grid request of STE projects by Oct MW.
2006 Report on the Capacity, Demand, & Resources for the ERCOT Region Technical Advisory Committee June 1, 2006 Kenneth A. Donohoo. P.E. Manager, Transmission.
Ann Finley VGS-PCC Liaison VGS Discussion July 15-16, 2014 Salt Lake City, Utah.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
April 13, 2007 Regional Planning Group Meeting Wind Impact/Integration Analysis Warren Lasher Regional Planning.
Planning the Networked Grid Transmission Planning J.E.(Jeff) Billinton Manager, Regional Transmission - North Building the Networked Electricity Grid –
Technical Update Task Force & Technical Track Work Group Meeting Dave Dilks June 15, 2016.
Bert Peters Chair, Path Operator Task Force
Solar Eclipse Overview August 2017
MIT tour of the California ISO Control Center March 31, 2015
Key Findings and Resource Strategy
Proposed Energy Imbalance Market The Basics
Reliability Assessment Committee Reliability Workshop Priorities
Sandip Sharma ERCOT Manager, Operations Planning
Reliability Assessment Committee Reliability Workshop Priorities
Forecasting and Operations CAISO Case
Variable Generation Subcommittee Update to PCC
Bert Peters Chair, Path Operator Task Force
Information Sharing Policy Update March 25-26, 2014
Presentation transcript:

VARIABLE GENERATION OPERATING RESERVE TASK FORCE VARIABLE GENERATION OPERATING RESERVE TASK FORCE Don Badley, Chair VGORTF Report to Operating Committee July 14, 2015 Salt Lake City, Utah

VGORTF MISSION To ascertain the different methods of estimating Regulating Reserve needed for next-day and within-day operating conditions related to variable generation.

VGORTF SURVEY 15 Question Survey Constructed – Distributed to all Balancing Authority Areas (BAA) on February 21, 2014 – Requested return by March 14, 2014 – Last completed survey received was on June 23, – Twenty two BAAs completed the survey. – Only four BAAs with variable generation did not complete and return the survey.

SURVEY FACTS Due to a lack of monitoring or record keeping, many survey questions could not be answered by every BAA. BAA survey responses, compiled survey results, and a summary of the results by survey question are posted on the WECC website.

SURVEY REVELATIONS Wind Generation – 19,215 MW wind generation installed within WECC. – Aggregated largest amount of wind generation within a single BAA is 5,900 MW. – 60% of BAAs with wind generation use 100% of it to serve load within their own BAA.

SURVEY REVELATIONS Solar Generation – 6,185 MW of utility-scale solar generation capacity installed within WECC – Aggregated largest amount of utility-scale solar generation within a single BAA is 5,499 MW. – 2,576 MW of distributed solar (PV) generation capacity installed within WECC – Largest amount of distributed solar generation within a single BAA is 2,000 MW.

SURVEY REVELATIONS 13 BAAs reported losing various quantities of wind generation over a 15-minute period due to high speed cutout. – The single largest amount lost by a single BAA was 958 MW. The largest amount of solar generation lost over a 15-minute period by a single BAA was 495 MW.

SURVEY QUESTIONS BAA Authority – Dispatch control Under what circumstances? Ability to disconnect? – Ability to deny schedules Under what circumstances?

SURVEY QUESTIONS Forecasting Variable Generation – How often? – Are commercial services used? Day-ahead Planning – Balancing – considerations for regulating – Unique components to consider

SURVEY QUESTIONS Would you support a common regional method for determining the amount of regulating reserve required due to variable generation?

WHERE TO FROM HERE Survey results were just compiled last week. Task Force must meet to see discuss the results and determine what more needs to be done.

Variable Generation Operating Reserve Task Force July 2015 Questions?