Lucie linssen, April 8th 2008, SLHC-PP kick-off meeting 1 The SLHC-PP project Welcome and overview of the project This project.

Slides:



Advertisements
Similar presentations
September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   The proposal is under discussion: we welcome input from potential.
Advertisements

Sustainable Energy Systems Overview of contractual obligations, procedures and practical matters KICK-OFF MEETING.
11 September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   Outline Motivation General description Proposed Work Packages.
AIDA is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement AIDA status report.
Role of Management and Technical Coordination
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Overview of EuCARD-2.
Management structure and procedures KickOff Meeting ICT-AGRI 2 4 th – 5 th Februrary 2014 Niels Gøtke, Iver Thysen Jan Erpenbach, Elke Saggau.
1 Framework Programme 7 Guide for Applicants
The Preparatory Phase Proposal a first draft to be discussed.
1 Research Infrastructures in FP7 EUDET Annual Meeting 19 October 2006, Munich Dr. Gerburg Larsen European Commission, RTD-B.3 - Research Infrastructures.
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
SLHC-PP Admin News Admin guide Time sheets Effort Web Pages 1 st Deliverable Report SLHC-PP Steering Committee Meeting CERN, July 3 rd, 2008.
Reporting during the lifetime of the project Moldova – Research Horizon 30 January 2013 Kristin Kraav.
EPOCA – 11. June EPOCAConsortiumOrganisation.
Project Reporting for the EuCARD Integrating Activity Project Based on: - Provisions of the Grant Agreement (GA) and its annexes - FP7 Guide on Project.
Draft Collaboration Model for HLLHC-DS HLLHC-DS Meeting 20th July 2010.
ESTELA Summer Workshop, 26 June 2013 The EU-SOLARIS project.
AIDA negotiation process AIDA NCP Meeting,
Astroparticle Physics for Europe ASPERA – 2 Workpackage 5 1. Workpackage 5 - European-wide common calls and other common actions Deborah Miller, STFC.
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt CBM Collaboration meeting Status Interim MoU J. Eschke, GSI.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
SLHC – PP Management Plan April 3 rd, 2008 M. Capeans, M. Ropka CERN April 3, 20081M.C.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Technical agreement n 3 New SC Magnets activities P. Fessia (G. De Rijk), D. Reynet, J.M Rifflet.
1 ASTRONET Coordinating strategic planning for European Astronomy.
United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September.
Consortium building PHOENIX Training Course Laulasmaa, Estonia
Project preparation workshop “Bringing a transnational project to life” Project idea “Challenges and chances from Climate Change for regional and local.
Status of QUACO project
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
Project Procedures Start up Governance Internal Communications – Lists – documents Meeting Schedule Deliverables Cost statements.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU CNI contract Kick-off meeting, December 1-2,
SLHC-PP WP2: Coordination for the SLHC accelerator implementation, agenda for the kick-off meeting 1. Introduction to WP2(20’, G. de Rijk) 2. Work plan:
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2 Governance.
Technology Department WP2 Progress Report Th. Otto
Negotiation of Proposals Dr. Evangelos Ouzounis Directorate C DG Information Society European Commission.
Information Overview SF: Planning & Programming Workshops for EC Delegation Patrick Colgan & Ján Krištín PROGRAMMING PROCEDURES in Support of Regional.
EGEE JRU Workshop, Brussels, December 1 st, JRU RoGrid – Romanian Experience RoGrid Consortium RoGrid JRU set-up RoGrid JRU Implementation Internal.
WP2 status Gijs de Rijk This project has received funding from the European Community's Seventh Framework Programme (FP7/ )
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Common R&D projects for the LHC upgrade and plans for irradiation facilities Outline: PH common R&D projects Working Group on future irradiation facilities.
HL-LHC Organization: Now and post HiLumi
E.Elsen GDE Meeting, Beijing, Feb 2007 Perspectives and Planning for European LC R&D.
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
SLHC-PP WP7 8 April 2008 Structure SLHC- PP WP7 SLHC-PP Steering Group SPL Study Group DESY Peters INFN ? CERN Scrivens / Hofle STFC- RAL Faircloth CEA.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
PH Theme 3 R&D Meeting with WP leaders 3/7/2008. Overview of WP’s.
TIARA – WP6 Involving Industry in TIARA Lucio Rossi (WPD) CERN.
Fabrizio Gagliardi EGEE Project Coordinator EGEE is proposed as a project funded by the European Union under contract IST
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
SC meeting R. Aleksan February 11 th TIARA 1.General Information 2.Final Budget 3.Meeting Objectives 4.Organizational matters 5.Kickoff meeting 6.Conclusion.
HL-LHC Review of WP 1 Lucio Rossi – CERN 3rd general meeting for application 20 October 2010.
WP leaders meeting R. Aleksan October 5 th, 2009 TIARA 1.Objectives 2.General Context 3.Building TIARA 4.Conclusion.
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
2. The funding schemes ICT Proposer’s Day Köln, 1 February 2007 The ICT Theme in FP7 How to participate to ICT in FP 7.
WP leaders meeting R. Aleksan October 5 th, 2009 TIARA 1.Objectives 2.WP management 3.General rules 4.Conclusion Work Packages.
CERN participation in EU project CREMLIN CERN-internal introduction meeting July 17 th 2015 Lucie Linssen.
Contract Kari-Jouko Räihä. The Package  Contract (“core contract”) Signed between the coordinator and the commission Accession forms signed by the coordinator.
11/19/ Third Meeting of the EuCARD Steering Committee 1 EuCARD Management Report J.P. Koutchouk, S. Stavrev for the Coordination Office.
AMICI WP1 – Management, coordination and dissemination
WP1 - Consortium coordination and management
Gunnar Buckau, Forschungszentrum Karlsruhe, Germany
CERN R&D plans and Infrastructures
Safety in Construction and Upgrade Phases
Annual Report Instructions
AMICI WP1 – Management, coordination and dissemination
ASTRONET Coordinating strategic planning for European Astronomy
Presentation transcript:

Lucie linssen, April 8th 2008, SLHC-PP kick-off meeting 1 The SLHC-PP project Welcome and overview of the project This project has received funding from the European Community's Seventh Framework Programme (FP7/ ) under the Grant Agreement n o

Lucie linssen, April 8th 2008, SLHC-PP kick-off meeting 2 Contents FP7-CNI call, PP project The collaboration partners SLHC-PP work packages R&D work outside SLHC-PP Coordination roles of SLHC-PP for SLHC SLHC-PP management structure Outreach coordination SLHC project timing, cf Annex I SLHC-PP contractual documents Kick-off meeting

Lucie linssen, April 8th 2008, SLHC-PP kick-off meeting 3 FP7 CNI call, PP project FP7-CNI program: “Construction of New research Infrastructures” Based on a list of ~35 projects selected by ESFRI (European Strategy Forum on Research Infrastructures) “PP” refers to “preparatory phase”: “ The preparatory phase for the construction of new research infrastructures (or major upgrades of existing ones) aims at bringing the project to the level of legal and financial maturity required to implement the project.” => Coordination, Support and Technical work are supported SLHC-PP proposal was submitted in May 2007, approved in July 2007 Final (Annex I) financial envelope: 15.6 M€, of which 5.2 M€ funded by EU Project start April 1st 2008, for a duration of 3 years

Lucie linssen, April 8th 2008, SLHC-PP kick-off meeting 4 The SLHC-PP project collaboration 17 institutes from 9 countries

Lucie linssen, April 8th 2008, SLHC-PP kick-off meeting 5 Work package list

Lucie linssen, April 8th 2008, SLHC-PP kick-off meeting 6 WP2 “Coordination for the SLHC accelerator implementation” –Project Management preparation (tools) Project monitoring structures, EVM Finance management system Quality assurance plan –Networking and communication Collaboration communication structures for the SLHC accelerator project Storage and dissemination of technical information CERN, CEA-Saclay, STFC, CIEMAT

Lucie linssen, April 8th 2008, SLHC-PP kick-off meeting 7 WP3 “Coordination for the S-ATLAS experiment implementation” –Coordination and project structures Managerial structure => Collaboration agreements, reviewing structures, financial rules, cost books, initial MoU documents –Project office Define upgrade project scope Drawings, technical databases Scheduling Installation scenarios CERN, FOM-NIKHEF, STFC, UNIGE

Lucie linssen, April 8th 2008, SLHC-PP kick-off meeting 8 WP4 “Coordination for the CMS2 experiment implementation” –Coordination and organisation of CMS2 Organisational structure Collaboration agreements, dissemination of information, cost books, MoU for upgrade and installation –Technical Coordination Unit Central technical information repositories, design and modification tools, reviewing conceptual design, quality management Scheduling and installation scenarios Imperial, CERN, DESY, ETHZ

Lucie linssen, April 8th 2008, SLHC-PP kick-off meeting 9 WP5 “Radiation protection and safety issues for accelerator and experiments” –Experiment radiation &activation Simulations for activation and radiation Validation with measurements at LHC Optimization of forward region design, exposure during maintenance and repair –Accelerator radiation &activation Simulations for activation and radiation in critical regions Evaluation of doses to materials and equipment Minimize consequences for equipment and beam operation –Impact study Dose rates in areas of SLHC access Environmental impact Estimates related to radioactive waste CERN, CTU, GSI, PSI, USFD

Lucie linssen, April 8th 2008, SLHC-PP kick-off meeting 10 WP6 “Development of Nb-Ti quadrupole magnet prototype” –Design of Nb-Ti superconducting quadrupole Basic triplet design Full interaction region design –Construction and testing of short models 1 m long prototype, incl. correctors –Construction and testing of full-scale prototype Full scale prototype, incl. correctors CERN, CEA-Saclay, CIEMAT, CNRS-IN2P3, STFC

Lucie linssen, April 8th 2008, SLHC-PP kick-off meeting 11 WP7 “Development of critical components for the injectors” –Development towards an H - source for the SPL Finite element thermal studies Design, construction and test of high-duty factor plasma generator and sub-systems –Field stabilisation in pulsed superconducting low  (v/c) accelerating structures Characterisation of tuners/cavities developed under HIPPI RF modelling/design Production of electronic system Full characterisation of RF system CERN, CEA-Saclay, DESY, INFN, STFC

Lucie linssen, April 8th 2008, SLHC-PP kick-off meeting 12 WP8 “Tracking detector power distribution” –DC-DC converters Buck converters based on air-core conductors and on-chip conversion options Evaluation of technology, prototypes, integration in detector modules –Serial powering Generic studies Custom serial powering circuitry Integration in full-scale super-module STFC-RAL, CERN, AGH-UST, PSI, UBONN

Lucie linssen, April 8th 2008, SLHC-PP kick-off meeting 13 R&D outside SLHC-PP Estimate put down in Annex I: 136 M€ for accelerator and experiments together

Lucie linssen, April 8th 2008, SLHC-PP kick-off meeting 14 SLHC-PP coordination roles for SLHC in general The overall R&D effort for SLHC is much larger than the limited R&D effort of the SLHC-PP project itself (WP6+WP7+WP8 ≈ 6M€ direct costs) The coordination roles of WP2+WP3+WP4 go well beyond the SLHC- PP technical project deliverables and shall cover the full effort towards SLHC As a first action in this context the public SLHC R&D kick-off event is organised tomorrow:

Lucie linssen, April 8th 2008, SLHC-PP kick-off meeting 15 SLHC-PP management structure

Lucie linssen, April 8th 2008, SLHC-PP kick-off meeting 16 Governing board The Governing Board (GB) is the top-level decision making and arbitration body. The GB will have the power to decide, upon Steering Committee proposals, on strategic issues, such as modifications of the project programme (if necessary) and admission of new participants. The Governing Board will review the progress of the project at the annual SLHC-PP meetings, and, where necessary, decides on changes in the work plan and budget allocation for the next reporting period.

Lucie linssen, April 8th 2008, SLHC-PP kick-off meeting 17 Steering Committee Management team: Lyn Evans Project Coordinator (acc) Lucie LinssenDeputy Project Coordinator (expt) Mar CapeansAdministrative manager Work package leaders: WP1Lyn Evans WP2Gijs de Rijk WP3Steinar Stapnes WP4Jordan Nash (Imperial) WP5Hans-Georg Menzel and Thomas Otto WP6Paolo Fessia WP7Richard Scrivens WP8Marc Weber (STFC) It is the executive body of the Consortium in charge of the coordination and management of all activities in the project. It shall monitor and review the work progress and will take executive decisions on scientific and administrative issues that may arise.

Lucie linssen, April 8th 2008, SLHC-PP kick-off meeting 18 Outreach coordination Dissemination of information (see WP1, task 1.2) Central web page: –Based on information repository of all work packages (in particular the COORD WPs 2, 3, 4) –Series of internal technical/scientific reports –Repository of Published Publications with SLHC-PP participation Following the main nature of SLHC-PP, establishing contacts and providing information on SLHC is a very essential element of the project –Including repositories on R&D work outside SLHC-PP –Organisation of SLHC workshops !

Lucie linssen, April 8th 2008, SLHC-PP kick-off meeting 19 Luminosity upgrade, 2 stages Stage 1: –SLHC-PP project together with world-wide technical R&D: Construction of Linac4 (160 MeV/c) Design of new injector complex (to replace PSB and PS) Design of high-luminosity LHC interaction region upgrades (Nb-Ti, then Nb3-Sn quadrupole magnets) Other LHC machine upgrades: RF, collimation……. Definition of possible SPS upgrades R&D for experiment upgrades Stage 2: until 2016 implementation (progressive) –Construction of new injectors –Implementation of LHC, SPS upgrades –Implementation of experiment upgrades (possibly progressive) Note: this overview is taken from the Annex I document, autumn Obviously, as a function of the R&D progress, these plans are subject to change…….

Lucie linssen, April 8th 2008, SLHC-PP kick-off meeting 20 SLHC-PP contractual documents Annex I document –Our principal working document The work plan, including deliverables/milestones The sharing of the work between the partners The sharing of the resources Grant Agreement (GA) –Our legal contract (with the European Commission and between the partners) Annex I is part of the Grant Agreement Consortium Agreement (CA) –Our internal constitution Internal collaboration rules (sharing responsibilities, management, publications, sharing of information) The EC is not a signatory of the CA

Lucie linssen, April 8th 2008, SLHC-PP kick-off meeting 21 Kick-off meeting Aim of the meeting –Meet the participants! –Define the work program for the first year –Provide information to collaboration members on the project and on FP7 procedures –Give broad visibility to the SLHC project Have a nice meeting ! –55 persons inscribed –Almost all institutes represented

Lucie linssen, April 8th 2008, SLHC-PP kick-off meeting 22 Practical info Plenary and parallel sessions all take place in or close to the main building Welcome drink, this evening at hrs in the Glassbox (Restaurant 1, NOVAE) => Everyone welcome In case of practical problems/questions do not hesitate to contact us –Kate Ross , –Cecile Noels –Lucie Linssen , –Mar Capeans ,