All Saints’ RC School Mansfield PE Changing Room Refurbishment 2007 Consultant : CP Associates Contractor : Tanbry Construction, Mansfield Cost :£372,272.17.

Slides:



Advertisements
Similar presentations
Health and Safety Executive Health and Safety Executive Welfare facilities on small construction sites Presenters name in Arial regular 32pt.
Advertisements

Lesson 9 Design & Construction of Food Premises & Equipment
HVAC Systems and Their Role in Infection Control and Prevention
Capital developments at SFX
REACH Partnership MIDDLE/ HIGH SCHOOL #341 EMERGENCY SAFETY PLAN
Albany Compound Voice/Data Rewire Albany, Oregon 1 Project Description Upgrade and modernization to the voice/data system in the motor pool due to age.
1. Background 2. Design 3. Cost 4. Fundraising PLACE OF WORSHIP – there are around 500 members of St John’s and services are held throughout the week.
EOC: Semi-Annual Review of DOH Survey Citations, The Top 10!
Measure G Overview March 9, Measure G School Facility Improvement East Side Union High School District To provide greater security and safety, relieve.
Finance and Facilities. DuPage County, IL EAV Growth History (Five Year Average: -2.15%)
2008 Bond Program Implementation | Rock Creek Campus opsis architecture LLP Portland Community College | Rock Creek Campus opsis architecture Portland.
Marks and Spencer Chesterfield Store Entrance Matting Refurbishment by UK Mat Group.
Date ▪ Educational Program - Update Automotive Options ▪ Practice Fields - Additional Options Agenda – Rebuild Stafford High School.
Introduction The Village Hall Committee are made up of 9 members eight are trustees. Each Committee member has a role or is representing an organisation.
View of Barcombe Village hall from the reservoir. Built in A modern green sustainable hall that can boast a green roof, a rainwater harvesting system,
ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.
Bond Proposal May 12,  I.E.Clark Fine Arts Center – Problem – Consistent separation of walls and foundation over the years. Summary – The Fine.
THE SUMMER OF CHANGE Things are happening ….. WEEK ONE.
Contractor Induction Program Gippsland Southern Health Service is committed to a safe and healthy work environment.
Abc The Flexible ‘Clean Off’ System. bc There is a more practical way … … to stop dirt in its tracks..
1 26th May 2011 Tonbridge Station Julie Houghton.
Chapter 9 FACILITY MANAGEMENT.
All Saints’ RC School Mansfield Dining Room Extension and Refurbishment 2008 Consultant CP Associates Contractor Tanbry Construction, Mansfield Cost £191,
Lec#14.  Disable person needs equipment with the degree of impairment and desired degree of independence in area of personal care, mobility, leisure,
Proposed Alternative to the Curved Wall Concept Friends of the Orange Depot By J David Derosier 1.
PH-DT Infrastructure Investments M.Capeans SPOB meeting CERN, 20/3/14.
Church Administrators & Emergency Planning
PC Meeting July 1, 2015 CUP 15-02/DR 15-06/DR
Building for Learning Project Photo Progress Report 3 October 2009 – November 2009 Project commencement 21 st September 2009.
St Patrick’s Primary School Mansfield Disabled Access Project Consultants:CP Associates Construction:Tanbury Construction, Mansfield Cost:£175,938 Construction:April.
School Toilet Blocks for Bangladesh Gender Sensitive : Disability Friendly : Dedicated Teacher Cubicle : Disaster Adapted.
日本 の いえ (家). In Japan, multiple-unit blocks are referred to as one of two types: 1) Apaato ( アパート) (or Apartment) for rented unit buildings, which are.
INITIAL CONSULTATION 07 May 14 May 21 May 04 June Identifying Needs
FEEDBACK TO PORTFOLIO COMMITTEE: 24 NOVEMBER 2010.
Accessibility Checking at Pung-Waan Resort Kanchanaburi Saiyoke District, Kanchanaburi Disabled Peoples' International Asia-Pacific (DPI/AP) Ms. Saowalak.
Houston TranStar Building Expansion 2009 Status. Aerial of Existing Building.
Medicine Distribution Locations Medicine Distribution Locations. One room for each school.
STRATEGIC ASSET MANAGEMENT ASSISTANT CHIEF FIRE OFFICER PAUL SOUTHERN.
LIVING AREAS. Living area Part of the house that friends and guest see. It is usually a place of show, recreation and entertainment. It roughly consumes.
Christine Davis Tarryn Hardgrove Becky Kalla. Current Convocation Athletic Training Room.
Fire Recovery Facilities –Physics Computing Services is finally able to relocate back into 1301 as of this week. They will probably be completely off of.
Unique assets … of Glentrool: 1.Surrounded by forest 2.Local tourist attractions 3.Amazing local scenery and outdoor activities 4.Only village in the.
PE and Sports Premium- where our money is spent Develop cross curricular aspects of sport. Sports funding will be used to extend the use of the.
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
+ The Future of the Community Centre. + What we did Test the feasibility of running the Centre without the County Council Building survey Consultation.
CDM Site Induction. Welcome to the ICC. Contents CDM Who’s who Welfare Hall Access Policy Site Rules Emergency Evacuation.
Developing Extra Care in Salford By Shena Latto & Debbie Knight.
Hayesbrook Community Pavilion. Aims St Stephen’s Church offers a variety of activities open to the whole community including Youth Clubs (Young & Old.
An overview of School health and safety AT THE DESIGN STAGE
Thank You for attending
More info at WindhamMaine.us/597/Maintenance-Facility
Safety and Prevention of Typical Fire Plan
St Michael’s C of E Primary School Front of School Enhancements
To do your best you must…
Site Based Preconstruction – Site Set Up
Minnesota Correctional Facilities Capital Investment
East Hall under construction
Ceiling Hoists: Let’s raise the requirements to the ceiling
Huntsville City Schools Huntsville High School Softball
3. Refurbishment - Project 1
Thank you for responding
E D F C G A H B Building Dimensions Square Footage Access Structure
Westminster House, The Wells Road Centre, Nottingham
Value of contract: Length of contract: Contract start date:
Value of contract: Length of contract: Contract start date:
Organics Waste Processing Facility Construction Progress Update July 8, 2011
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
Front of building. Mrs Neil (our School Business Manager) visits York to see our new school building.
White Hall Residential Visit Parents’ Meeting
Presentation transcript:

All Saints’ RC School Mansfield PE Changing Room Refurbishment 2007 Consultant : CP Associates Contractor : Tanbry Construction, Mansfield Cost :£372, Construction :July – November 2007 Further Information : Mr K. Vaughan

Problem (1) The PE Changing Rooms at this 1100 place comprehensive school were showing signs of wear and tear and were not welcoming to students or indeed to the local community which uses the adjacent Sports Hall every night of the week. The tiles in the showers were causing maintenance issues as they kept falling off and there was a severe lack of toilet facilities in the male changing rooms. Students had to cut through the toilet area to access the (very narrow) external door.

Problem (2) The need for a specialist disabled changing facility had already been raised and an adjacent disused laundry room being used as an additional storage facility had been identified for refurbishment to provide a shower and changing facility for wheelchair bound students. The corridor to the main changing rooms was narrow and cramped and had to be used by both boys and girls at the same time causing congestion and a potential health and safety risk.

Solution (1) Following the removal of remaining asbestos and the replacement of the flat roof, the area was remodelled to provide a new entrance to the girls’ changing room and thereby ease the congestion in the corridor. The boys’ toilets were relocated into the adjacent external store area and a new exit created.

Solution (2) A new block was constructed to the side of the Sports Hall (accessible from both the main entrance corridor and an outside door) to provide separate storage areas for indoor and outdoor equipment. New shower cubicles, partitions, ceilings and lighting were installed. The disabled facility was completed and the staff changing rooms modernized and tidied.

Impact Congestion in the corridor has been removed Students have a more pleasant environment in which they can change Better and more accessible storage facilities, removing clutter in the corridor Improved facilities for staff