Type IV Cryomodule Proposal (T4CM) Don Mitchell, 16 JAN 2006.

Slides:



Advertisements
Similar presentations
Interface of Plug-Compatible Cryomodule Components KEK Norihito Ohuchi 2008/3/41GDE-Sendai Meeting.
Advertisements

Indian Plan for Contribution in Superconducting Cavity & Cryomodule Technology Prashant Khare Avinash Puntambekar RRCAT,India.
Superconducting Spoke Resonator Cavities and Cryomodules
FNAL-SCRF 会議報告 1. Cryomodule, Plug-compatible Interface ( 大 内) 2. High Pressure Code, 5K Shield (Tom Peterson)
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe MLC external review October 03, 2012.
ILC-BCD: Cavity Package International Linear Collider - Baseline Configuration Document: Cavity Package DESY -MPY-
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
650 MHz Cryomodule Design, 21 Feb 2011Page 1650 MHz Cryomodule Design, 21 Feb 2011Page 1 Project X Cryomodules Tom Peterson and Yuriy Orlov with material.
SCU Layout Concept - Minimal Segmentation Joel Fuerst (ANL) SCU 3-Lab Review Meeting Dec. 16, 2014.
Internal Cryomodule Instrumentation ERL Main Linac Cryomodule 10/10/2015 Peter Quigley, MLC Design Review.
TESLA MEETING May 2003 Frascati LINAC TECHNOLOGY WORKING GROUP Working Group Linac techology introduction Cryomodule design and Assy. Tuner issue.
Present status of TTF-cryomodules short overview Bernd Petersen DESY MKS March, 7, 2005 Main design features of TESLA-cryomodules Design changes for XFEL-cryomodule.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
LCLS-II cryomodule alignment. 2 Wednesday meeting, 6/17/2015 Topics Alignment of Components inside the CM Tunnel Network Tolerances LCLS-II cryomodule.
FNAL Cavities for S1 Global Jim Kerby ALCPG 09. FNAL Deliverables Discussed in meetings 15/16 July and 10/11 Sept, and Webex and s 9/30/20092FNAL.
Detail discussion of S1 Global at STF H. Hayano (KEK) GDE Mar 3-6, 2008.
STF plan overview H. Hayano, KEK LCPAC 02/25/2005.
Cryomodule Design and R&D during the EDR phase Robert Kephart With input from the T4 CM Collaboration.
Safety Requirements and Regulations 10/3/20121Safety Requirements & Regulations James Sears.
Cryomodule Development at Fermilab Don Mitchell Representing the SRF engineering community at Fermilab April 20, 2009 Tsukuba, Japan TILC09.
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
TTC Meeting Frascati Dec 5-7 Bernd Petersen WG3: Module Test-Stand Summary Charge of the working group: Define scope of module test-stand activities with.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
5 K Shield Study of STF Cryomodule Norihito Ohuchi, Norio Higashi KEK Xu QingJin IHEP 2008/3/3-61Sendai-GDE-Meeting.
Date 2007/Oct./25 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Report N. Ohuchi KEK 1.Cryomodule & Cryogenics KOM 2.GDE-meeting discussion I.Interface.
Summary ( Cryomodule, Plug-compatible Interface) Norihito Ohuchi.
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
ILC Americas Cavity and Cryomodule R&D Shekhar Mishra ILC Program Fermilab Talk presented at DOE Annual Program Review Breakout Sessions – Wednesday, May.
Rolf Lange DESY ILC Workshop 1-June-07 XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Module Industrialisation for XFEL How to proceed.
Definition of Work Area H. Hayano, KEK EDR-KOM-cavity at DESY Issues of Cavity and Cavity Package, Work Package discussion.
30 May 2007 DESY Cryomodule Discussion 1 Type 4 Cryomodule Technical Discussion Tom Peterson Compiled from various previous meeting notes and many sources.
RDR Linac Definition  Tasked Cryomodule & Cryogenics Groups with defining cryomodule length and cryoplant layout First pass generated at Jan CERN.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Carlo Pagani University of Milano INFN Milano-LASA & GDE ILC and XFEL Cryomodules Preliminary thoughts for convergence ILC EDR Kick-off Meeting DESY,
What’s Inside a TESLA Cryomodule Tom Peterson Proton Driver Meeting February 9, 2005.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe.
S1 global: thermal analysis TILC09, April 19th, 2009 Serena Barbanotti Paolo Pierini.
Detail plan of S1-Global H. Hayano (KEK),
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
SPL cryomodule specification meeting, CERN 19th October 2010 SPL cryomodule specification: Goals of the meeting SPL cryomodule specification: Goals of.
5 K Shield Study of STF Cryomodule (up-dated) Norihito Ohuchi KEK 2008/4/21-251FNAL-SCRF-Meeting.
Beijing ILC Workshop Global Design Effort 1 Main Linac EDR: Cavity & Cryomodule Discussion Lutz Lilje DESY.
ALCPG/GDE Meeting FNAL Global Design Effort 1 Cavity Specification Table 23 Oct 2007 FNAL Lutz Lilje DESY.
S1-Global status report KEK Norihito Ohuchi 2008/11/171ILC08-GDE-Meeting-Chicago.
Plug compatibility discussion TILC09 cavity integration session H. Hayano.
LCLS-II Prototype Cryomodule Vacuum Vessel and HGRP Tom Peterson 4 December 2014 Design Review.
CM2 Helium Circuit Vacuum Leak & Repair Tug Arkan, 6/18/
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Jefferson Lab Cryomodule Cost and Optimization. Based Jlab energy upgrade Cryomodule design and produced to increase the energy gain of CEBAF to 12 GeV.
Low Beta Cryomodule Development at Fermilab Tom Nicol March 2, 2011.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
Cryomodule Safety Approvals Jay Theilacker LCLS-II Production Cryomodule Final Design Review May 12-14, 2015.
ILC : Type IV Cryomodule Design Meeting Main cryogenic issues, L. Tavian, AT-ACR C ryostat issues, V.Parma, AT-CRI CERN, January 2006.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
The Evolving ILC Project
TDR guideline discussion on Cavity Integration
Requirements for Efficient CW SRF Cryomodules
FRIB Cryogenic Support
Meeting for S1-Global module design Cryomodule and Cryogenics
Project X: Cryogenic Segmentation Issues
ILC Main Linac Design Status
Jiyuan Zhai ( IHEP ) TTC Meeting, JLAB, 6 Nov 2012
TDR: Cryomodule Paolo Pierini.
ILC Cryogenic Systems Draft EDR Plan
ILC Cryogenics -- Technical Design Report Planning
Cryomodule Assembly Plan
CEPC-650MHz Cavity Cryomodule
ERL Director’s Review Main Linac
Presentation transcript:

Type IV Cryomodule Proposal (T4CM) Don Mitchell, 16 JAN 2006

16 JAN 06D. Mitchell, FNAL2 Design Reference: TTF III+

16 JAN 06D. Mitchell, FNAL3 TTF III+ Cryomodule Courtesy of DESY

16 JAN 06D. Mitchell, FNAL4 ILC Cryo Design Considerations  Move quad package to middle of cryomodule to achieve better support and alignment.  Shorten cavity-to-cavity interconnect and simplify for ease of fabrication and cost reduction. Possible superconducting joint.  Overall improved packing factor.  Minimize direct heat load to cavity through MC.  Simplify the assembly procedure.  MLI redesign to reduce hands-on labor costs.  More robust design to survive shipping.  Reliability of tuner motors in cold operation.  Etc. (we’ve heard many suggestions)

16 JAN 06D. Mitchell, FNAL5 Increase diameter beyond X-FEL Increase diameter beyond X-FEL Review 2-phase pipe size and effect of slope

16 JAN 06D. Mitchell, FNAL6 T4CM Proposal (not the final ILC design)  Magnet alignment and vibration issues.  Cryomodule with and without magnet package Define BPM, Steering, and Quad parameters Possible option for separate magnet cryovessel  Reduced cavity length (which tuner design?)  Reduced cavity spacing (new interconnect)  Need for functional Fast-Tuner Current Cryo3 Minor changes to address major concerns.

16 JAN 06D. Mitchell, FNAL7 Conceptual Model Development

16 JAN 06D. Mitchell, FNAL8 Assumes use of XFEL Main Coupler Graphics from Terry Garvey

16 JAN 06D. Mitchell, FNAL9 Generation 4, T4CM

16 JAN 06D. Mitchell, FNAL10 Beware of a ripple effect! Design Changes

16 JAN 06D. Mitchell, FNAL11 Known Impacts Vessel weldment Linac Layout Main coupler position Magnetic shield design Integrated with supplier HGR pipe weldement cryogenic piping details Invar rod length including thermal shrinkage calculations Wire position monitor locations Waveguide connections Helium supply pipe lengths Design Change Example: Modified Cavity Length

16 JAN 06D. Mitchell, FNAL12 Potential Impacts Transportation fixtures Etching jackets EP process tooling High pressure rinse Process tooling Controls programming Design Change Example: Modified Cavity Length

16 JAN 06D. Mitchell, FNAL13 T4CM Proposed Cavity w/ Bladetuner

16 JAN 06D. Mitchell, FNAL14 Cavity Spacing 71.8 mm

16 JAN 06D. Mitchell, FNAL15 Cavity Dimensions

16 JAN 06D. Mitchell, FNAL16 Cryomodule – A working 3-D model

16 JAN 06D. Mitchell, FNAL17 Excel driven 3-D I-DEAS Model

16 JAN 06D. Mitchell, FNAL18 Multi-linked Excel Sheets drive 3-D CAD

16 JAN 06D. Mitchell, FNAL19 Excel usage integrates engineering calculations into the 3-D CAD process!

16 JAN 06D. Mitchell, FNAL20 Automatically adjusts for thermal contraction and component lengths

16 JAN 06D. Mitchell, FNAL mm mm mm

16 JAN 06D. Mitchell, FNAL22 Packing factor 35109mm mm Active length = mm x 24 cavities = mm Packing Factor = / = 0.71 Note: Does not include other components installed within the accelerator nor a possible increased magnet package length.

16 JAN 06D. Mitchell, FNAL23 No matter how simple the proposed changes are, this is no small task!  Concept development / Collaboration  Engineering analyses to appropriate standards  Part design  3-D modeling (concepts to reality)  ~750 parts / assembly drawings  Vendor integration  Procurement process  Fabrication  Assembly  Installation

16 JAN 06D. Mitchell, FNAL24 Design coordination sample worksheet

16 JAN 06D. Mitchell, FNAL25 Free 3-D Visualization with UGS JT2GO

16 JAN 06D. Mitchell, FNAL26 Proposed 4 th Generation Design  2 Vessels, ΔLength= mm (w & w/o Magnet package)  Cavity string supported and aligned by 3 support posts.  Magnet independently aligned but still supported from the 300mm HGR pipe. (HGR Pipe may need to be resized)  Support post locations may be identical in both vessels to simplify the tooling.  HOM absorber in interconnect region. What length?  Smaller cav-to-cav connection (71.8mm)  BPM, Quad magnet, and steering magnets are combined into one magnet package. Total length currently assumed to be 1222 mm. Should this length be increased to 1500mm?  TTF III cavity utilizes short end-tube for both ends. Length reduced to mm.  Possible use of Bladetuner due to the shortened cavity length.  New Magnetic Shield design is required.  All ports and flanges will be metric and ISO style.

16 JAN 06D. Mitchell, FNAL27 T4CM will differ from Type III+  Cavity iris-to-iris spacing reduced to 283 mm  String length changes from 12200mm to ~12565mm.  Slow tuner modified to allow closer cavity-to- cavity spacing (could mean switching to bladetuner design, but choice still open).  Fast tuner -- new design needed.  Quad/corrector/BPM package under center post, hung from 300 mm tube, not on rollers (diverging from X-FEL).  Two major module types, one with quad and one without.

16 JAN 06D. Mitchell, FNAL28 More differences of T4CM from Type III+  Interconnect features modified to accommodate an input coupler at end of cryostat as well as a new HOM absorber.  Quad current leads may be new, with local impact on thermal shields and vacuum vessel ports. May need large access ports as well.  Provisions for quad power lead connection at center of module.  Address magnet alignment issues.  Some pipe sizes will be increased for lower pressure drops with high flow rates -- would like to retain long cryogenic unit lengths up to limit of 300 mm pipe and cryo plants. Present effort includes re-analysis of heat loads, flow rates, and cryogenic system thermal process.

16 JAN 06D. Mitchell, FNAL29 Some critical open design issues  Quad/corrector/BPM package is a major unknown right now and goes into the heart of the module.  Tuner details, slow and fast, but especially fast tuner  Cavity-to-cavity interconnect design.  Vibrational analysis, which will be compared to measurements for verification of the model for future design work.  Magnetic shield re-design.  Development of module and module component tests.  Verification of cavity positional stability with thermal cycles.  Design of test instrumentation for the module.  Robustness for shipping, analysis of shipping restraints and loads, shipping specifications.  Active quad movers(?) A complication