Federal Aviation Administration Performance-Based Communication and Surveillance (PBCS) Closing remarks Date:13-14 May 2013 Presented to:ICAO Asia-Pacific RCP/RSP Workshop (Bangkok, Thailand) By:Tom Kraft
APAC RCP/RSP Workshop Closing May Federal Aviation Administration APAC RCP/RSP Workshop Program Time (min) Session 1 – Understanding RCP/RSP & PBCSDiscussion Leader 20Introductory RemarksFredric Lecat Tom Kraft 45ICAO SARPS – GuidancePaul Radford 45Global Operational Data Link Document (GOLD)Tom Kraft 15Derivation of RCP/RSP specificationsTom Kraft 35Introduction to Performance Based Communication and Surveillance (PBCS) Paul Radford 30Qualification of service provision: ANSP and CSPARINC/SITA 30Qualification of aircraft equipment for certificationJerome Condis 15Operational authorization to use data linkTom Kraft 45Post-Implementation Monitoring GuidancePaul Radford 30Performance monitoring in the Fukuoka FIRKoji Nakaitani 20Interpreting the resultsPaul Radford 10GOLD Performance Analysis ToolPaul Radford
APAC RCP/RSP Workshop Closing May Federal Aviation Administration Safety realization Benefits come from ATM (e.g. reducing separation minima) PBN (e.g. RNP) by itself does NOT give you ATM PBCS implementation plays important role in ATM –Recognized problem –Endorsed GOLD –Endorsed Regional PBCS implementation plan –Conduct PBCS workshops –Implement PBCS in the Region NAT Region APAC Regions What is missing? ATM RCP RNP RSP S NC
APAC RCP/RSP Workshop Closing May Federal Aviation Administration RCP/RSP Workshop Aim – Day 1 Promote PBCS implementation –What is PBCS and what are RCP and RSP specifications? –What amendments are being proposed for Annexes 6 and 11, Doc 4444, Doc 8168, and Doc 9869 to include PBCS provisions? –What guidance material is provided by GOLD?
APAC RCP/RSP Workshop Closing May Federal Aviation Administration RCP/RSP Workshop Aim – Day 1 Promote PBCS implementation –How do RCP/RSP specifications relate to C and S requirements for application of separation minima? –Why and how does PBCS effectively apply RCP/RSP specifications to ensure safe application of ATM through prescriptive requirements, initial qualification and continued operational safety –How does post-implementation monitoring, analysis and corrective action improve performance?
APAC RCP/RSP Workshop Closing May Federal Aviation Administration APAC RCP/RSP Workshop Program Time (min) Session 2 – Planning for PBCS implemenation in the APAC Region Discussion Leader 30State of the data link implementation in the South Pacific Toby Farmer 15An overview of NAT PBCS Implementation PlanTom Kraft 45General Discussion on APAC PBCS Planning and Implementation Frederic Lecat, Tom Kraft and Paul Radford 15Wrap-up/ Summary of outcomesLi Peng and Frederic Lecat
APAC RCP/RSP Workshop Closing May Federal Aviation Administration RCP/RSP Workshop Aim – Day 2 Promote a timely APANPIRG conclusion to endorse an APAC Regional PBCS Implementation Plan –Develop draft plan –To complement APAC Regional PBN Implementation Plan –Compatible with the global air navigation planning and performance-based concepts to ensure effective and harmonized PBCS implementation ATM RCP RNP RSP S NC
APAC RCP/RSP Workshop Closing May Federal Aviation Administration NAT PBCS implementation planning tasks TASK IDTASK DESCRIPTORCOMPLETE BYLEAD GENERAL PROJECT DEVELOPMENT & MANAGEMENT 1PlanNAT IMG/38 and NAT SPG/47NAT CNSG 2Target datesNAT IMG/38 and NAT SPG/47NAT IMG 3RCP/RSP specificationsNAT SPG/47NAT SARSIG 4NAT PBCS Workshop(s) ICAO/ States DOCUMENTATION 5Operational conceptsNAT IMG/42and NAT SPG/49 NAT ATMG in coordination with CNSG 6GOLD amendmentsNAT IMG/42 and NAT SPG/49 GOLD ad-hoc group 7Contingency proceduresNAT IMG/42 and NAT SPG/49 NAT ATMG/ CNSG 8Restoration of serviceNAT IMG/42 and NAT SPG/49 NAT ATMG/ CNSG 9Flight plan requirements a)NAT IMG/42 and NAT SPG/49 (as part of the NAT SUPPs PfA) and GOLD b)amend Doc 4444 target date - NAT SPG/50 NAT CNSG ICAO (Global) 10PfA for NAT Regional Supplementary Procedures (NAT SUPPS)NAT IMG/42 and NAT SPG/49 NAT CNSG NAT ATMG 11AIPs and other State documents supporting NAT SUPPSConsistent with Task 10States 14GOLD proposal for RCP/RSP compliance determinationNAT IMG/42 and NAT SPG/49CNSG 15GOLD proposal for guidelines on operator eligibilityNAT IMG/42 and NAT SPG/49OPS/AIR IMPLEMENTATION ACTIVITIES 12ATC automation changes Before the start of operational trials of RLongSM or RLatSM. NAT ANSPs 13Confirm actual CPDLC and ADS C performancePrior to operational implementation ANSPs, DLMA, CNSG, SARSIG AIRWORTHINESS AND OPERATIONAL ELIGIBILITY 16State regulations and guidance material End of 2014, Prior to operational implementation of RLatSM or RLongSM SOG, States, ANSPs, Users POST IMPLEMENTATION TASKS 17Post-implementation monitoring ANSPs, DLMA, CNSG CompletedOn track
APAC RCP/RSP Workshop Closing May Federal Aviation Administration APAC PBCS implementation planning Did the workshop provide the APAC Region with an understanding of PBCS and RCP/RSP specifications? Is there a convincing argument for PBCS implementation in the APAC? –What should be considered in planning for APAC PBCS implementation? –What tasks should be identified, who is lead and involved in competing the task and what is the schedule?
APAC RCP/RSP Workshop Closing May Federal Aviation Administration APAC PBCS Implementation Plan TASK IDTASK DESCRIPTORCOMPLETE BYLEAD GENERAL PROJECT DEVELOPMENT & MANAGEMENT 1Plan 2Target dates 3Applicability of RCP/RSP specifications 4PBCS Workshop(s) DOCUMENTATION 5Operational concepts 6GOLD amendments 7Contingency procedures 8Restoration of service 9Flight plan requirements 10PfA for NAT Regional Supplementary Procedures (NAT SUPPS) 11AIPs and other State documents supporting NAT SUPPS 14GOLD proposal for RCP/RSP compliance determination 15GOLD proposal for guidelines on operator eligibility IMPLEMENTATION ACTIVITIES 12ATC automation changes 13Confirm actual CPDLC and ADS C performance AIRWORTHINESS AND OPERATIONAL ELIGIBILITY 16State regulations and guidance material POST IMPLEMENTATION TASKS 17Post-implementation monitoring
APAC RCP/RSP Workshop Closing May Federal Aviation Administration Are more PBCS workshops needed? When and where?
APAC RCP/RSP Workshop Closing May Federal Aviation Administration
APAC RCP/RSP Workshop Closing May Federal Aviation Administration
APAC RCP/RSP Workshop Closing May Federal Aviation Administration Global J 2011 FMAMJJASONDD Plan update Target dates Performance specifications J 2012 FMAMJJASONDJ 2013 FMAMJJASONDJFM NAT States/ANSPs/DLMA GOLD, NAT Doc 006/007 ADS-C conformance monitoring Procedures for reroutes, non-normal operations Flight plan indicators for specifications Operator/aircraft approval guidance update Technical/monitoring update Guidance on operational approval Draft PfA NAT Doc RLongSM, RLatSM Proposed PANS/ATM & Draft GOLD Amendment GOLD performance monitoring New York – < 2010Gander – 1Q/2011 Shanwick – 4Q/2010Santa Maria – 2Q/2011 Reykjavik –3Q/2011 Shannon –1Q/2013 Bodo – TBD 6 GOLD Jun , DLMA Jun 2009 Plan Draft Jun 2008 NAT SPG/47 NAT SPG/48 NAT SPG/49 RLongSM Trial Data Link Mandate State AIPs & other docs 6, 9 Endorsed RCP/RSP Plan Proposed GOLD Amendment NAT Doc 006/007 Draft PfA NAT Doc th ANC Proposed PANS/ATM & GOLD Amendment 6, 9 NAT SPG/49 Adopt GOLD Amendment Process PfA OPLINKP NAT Groups 1, 2, 3 5, 6, 7, 8, 9, 14, , 10 GOLD Amendment PfA NAT Doc , 13, 17 4 RCP/RSP Workshops NAT PBCS implementation schedule (1 of 2)
APAC RCP/RSP Workshop Closing May Federal Aviation Administration Global J 2014 FMAMJJASONDDJ 2015 FMAMJJASONDJ 2016 FMAMJJASONDJFM NAT States/ANSPs/DLMA GOLD performance monitoring State AIP and other documents Operational readiness GOLD amendment Jun 2013 PANS/ATM amendment Nov 2014 NAT SPG/50 NAT SPG/52 6, 9 NAT Groups GOLD NAT adoption PfA NAT Doc , 11, 13, 16, Coordination Program management 11, 13, 16 Performance-based Concept RLongSM RLatSM NAT SPG/51 6, 10 9 NAT PBCS implementation schedule (2 of 2)