Instrumentation at CLS (Presentation to Saskatchewan Instrumentation Society Executive) Elder Matias Canadian Light Source University of Saskatchewan 2001-10-20.

Slides:



Advertisements
Similar presentations
Data flow: Main operation: From operation mode program via file operators to file operator servers Trigger generator: Trigger information will be distributed.
Advertisements

RTEMS and Linux at the Canadian Light Source Tony Wilson Canadian Light Source University of Saskatchewan.
Mark Heron Diamond Light Source Oct 2007 EPICS EPICS Interface to the Libera Electron Beam Position Monitor.
SPEAR Upgrade – EPICS Status
Mar. 12, 2008 Li, Chuan: NSRL Control System NSRL 1 NSRL Control System Presented by Li, Chuan National Synchrotron Radiation Laboratory.
Elder Matias Canadian Light Source University of Saskatchewan System Integration and QA.
Elder Matias CLS Control System Recent Upgrades. Major Changes Synchrotron Upgrade New Isotope Production Linac EPICS Software –Python EDM –Aquaman –ScienceStudio.
EPICS on TPS RF System Yu-Hang Lin Radio Frequency Group NSRRC.
SESAME Control System Status Ibrahim Saleh Control group 10/11/2012 Control Group12th TAC, Nov. 9-10,20121.
February 17-18, 2010 R&D ERL James Jamilkowski R&D ERL Controls Larry Hoff James Jamilkowski February 17-18, 2010 Controls.
SPEAR 3 Upgrade SSRL/SLAC January 2001  Computer Control System  Beam Monitoring and Feedback Systems  Timing System  Machine Protection Systems 
Elder Matias Canadian Light Source University of Saskatchewan CLS – Control System Overview.
Single Board Computers and Industrial PC Hardware at the CLS
SSRF Beamline Control System
Pohang Accelerator Laboratory POSTECH EPICS Collaboration Meeting RICOTTI, Tokai, JAPAN The status of PLS EPICS application EPICS collaboration.
Control System and Software Engineering Process Elder Matias
1 Progress of the Controls for BEPCII EPICS Seminar Presented by J. Zhao 20 August, 2002.
Readout & Controls Update DAQ: Baseline Architecture DCS: Architecture (first round) August 23, 2001 Klaus Honscheid, OSU.
CLS: Control System E. Matias, R. Berg, G. Wright, T. Wilson, T. Johnson, R. Tanner and H. Zhang Canadian Light Source University of Saskatchewan Invited.
Dec 8-10, 2004EPICS Collaboration Meeting – Tokai, Japan MicroIOC: A Simple Robust Platform for Integrating Devices Mark Pleško
CLS Machine Protection and PLC Hardware Presentation to Beamlines Group Elder Matias Canadian Light Source University of Saskatchewan October 20, 2001.
Ethernet Based Embedded IOC for FEL Control Systems J. Yan, D. Sexton, Al Grippo, W. Moore, and K. Jordan ICALEPCS 2007 October 19, 2007 Knoxville Convention.
Orbit Control For Diamond Light Source Ian Martin Joint Accelerator Workshop Rutherford Appleton Laboratory28 th -29 th April 2004.
Elder Matias, Diony Medrano, Dong Liu (At Michigan State University - Nov 2011) IRMIS at CLS.
The microIOC Family Gasper Pajor EPICS Collaboration Meeting Argonne National Laboratory June 2006.
CLS Control System Progress Report Elder Matias Canadian Light Source University of Saskatchewan Saskatoon Saskatchewan.
Control Group April 26, 2006 Progress of Control System Presented by C.H. Wang Control Group Accelerator Center of IHEP IMAC, April
Adrian Oates Daresbury Laboratory ALICE Control System July 08.
LHC Cryogenics Control: INTEGRATION OF THE INDUSTRIAL CONTROLS (UNICOS) AND FRONT-END SOFTWARE ARCHITECTURE (FESA) APPLICATIONS Enrique BLANCO Controls.
March 2008EPICS Meeting in Shanghai1 KEKB Control System Status Mar Tatsuro NAKAMURA KEKB Control Group, KEK.
Computer Science and Instrumentation Research Opportunities at CLS Johannes M. Vogt Canadian Light Source University of Saskatchewan
Eugenia Hatziangeli Beams Department Controls Group CERN, Accelerators and Technology Sector E.Hatziangeli - CERN-Greece Industry day, Athens 31st March.
Control Hardware Design Control Hardware Wiring IOC Software (Low Level) OPI Software (High Level) Final Test Front-End (Connection to SR1 Ring) Done Insertion.
E. Matias Canadian Light Source University of Saskatchewan CLS Control System Overview.
Oct 8-9, 2005ACS Collaboration Meeting – Archamps, France The MicroIOC From Custom To Production First customer: PSI 25 pieces.
K. Luchini LCLS Injector /BC1 Magnet PS Final Design Review, March 30, Injector and BC1 Magnet PS Controls K. Luchini.
Booster Top-off Computer Controls System C. Timossi November 22, 2004.
Steve Lewis Gas Attenuator 11 December Instrumentation & Controls Steve Lewis 11 December 2006 LCLS Gas Attenuator Preliminary.
1. LabVIEW and EPICS Workshop EPICS Collaboration Meeting Fall 2011.
NCSX CD-4/MIE block diagrams April 18, 2007 P. Sichta rev 0.
Connecting LabVIEW to EPICS network
Stanford Linear Accelerator Center Ron Chestnut EPICS Collaboration Mtg May 21-23, SLAC EPICS Projects Yesteryear, Today, and Tomorrow.
11 th February 2008Brian Martlew EPICS for MICE Status of the MICE slow control system Brian Martlew STFC, Daresbury Laboratory.
CEA DSM Irfu SIS LDISC 18/04/2012 Paul Lotrus 1 Control Command Overview GBAR Collaboration Meeting Paul Lotrus CEA/DSM/Irfu/SIS.
K. Luchini LCLS Injector /BC1 Magnet PS Final Design Review, March 30, Injector and BC1 Magnet PS Controls K. Luchini.
E. Matias Canadian Light Source CLS Beamline Controls.
Interfacing to the CLS Control System Canadian Light Source University of Saskatchewan.
Patrick’s Updates - 8/30/11 (one slide for each of the following) 1.XTCAV Project 2.ASTA Gun Test Facility Instrumentation & Controls 3.Fast wire scanner.
Control System Considerations for ADS EuCARD-2/MAX Accelerators for Accelerator Driven Systems Workshop, CERN, March 20-21, 2014 Klemen Žagar Robert Modic.
4. Operations and Performance M. Lonza, D. Bulfone, V. Forchi’, G. Gaio, L. Pivetta, Sincrotrone Trieste, Trieste, Italy A Fast Orbit Feedback for the.
Programmable Logic Controller & Distributed Control System Yoon-Je Choi 17 th June 2006.
JLab Accelerator Controls Matt Bickley MaRIE discussion April 26, 2016.
Fast Global Orbit Feedback for the Australian Synchrotron Eugene Tan Accelerator and Operations 13/12/20101 ACAS Workshop on Accelerator Feedback Systems.
Control System Pravin Fatnani Accelerator Control Section IIFC Meeting RRCAT Presentation Feb 2015.
Redundancy in the Control System of DESY’s Cryogenic Facility. M. Bieler, M. Clausen, J. Penning, B. Schoeneburg, DESY ARW 2013, Melbourne,
“Implementation and Initial Commissioning of KSTAR Integrated Control System,” Mikyung Park NFRC, KOREA The 6 th IAEA Technical Meeting,
SCADA Supervisory Control And Data Acquisition Pantech Solutions Here is the key to learn more.
BaBar Transition: Computing/Monitoring
SESAME Control System Status
Presented by Li Gang Accelerator Control Group
Current Status of IPM-Linac Control System
SNS Status Report Karen S. White 10/15/08.
PLC-based control systems at SOLEIL - ICALEPCS 2017
SESAME Control System Status
PRESENTATION ON AUTOMATION,PLC AND SCADA
LCLS-II 2K Cold Box Controls Design Review
EPICS Controls Steve Lewis 13 December 2007
EPICS: Experimental Physics and Industrial Control System
ESS Main Control Room & ICS Infrastructure
EPICS status and future at KEK Control Group / Commissioning Group e-/e+ Injector Linac, KEK, Japan Masanori Satoh.
Presentation transcript:

Instrumentation at CLS (Presentation to Saskatchewan Instrumentation Society Executive) Elder Matias Canadian Light Source University of Saskatchewan (updated )

CLS Control System More than 40 PLCs, 100 computers, 500 motors Mix of technologies (including industrial control hardware and scientific data acquisition hardware) Software based on a system called EPICS that was originally developed by Los Alamos. Today EPICS is used to control synchrotrons, accelerator facilities and radio telescopes around the world.

CLS Control System (cont.) The computer hardware is interconnected over a mix of Ethernet with some Profibus. The control system measures and controls over 55,000 signals, e.g., –Position of the beam in the storage ring to within 1  m –Magnet set points and feedback values –Temperature sensors, valves, flow switches... All of this data is acquired and logged in real-time.

VLANs for: each beamline, machine control, development, office, visitors VME Crate (Reflective Memory) MicroStep EROC IOC RTEMS Field Dev. RS-232 Devices OPI Linu x IOC Step Controller RTEMS Motors MicroStep OPI Linu x OPI Linu x Touch Panel OPI Linux Network Server (bootp, dhcp, auto restore) Linux Data Archive Server Linux Alarm Server MS-Win MS-SQL Server MS-Win PowerEdge IOC Linux PS Boards IOC RTEMS Power Supplies EROC IOC RTEMS Field Dev. Ethernet Devices PLC & GPIB Field Dev. MagnetsMotors 1Gig Bridge IOC Linux Field Dev. Profibus PLC System Architecture

Transition Radiation Monitors Non-destructive method of obtaining beam profile information A thin aluminized Mylar foil is moved into the beam Transition radiation is produced as the beam passes through the foil We are working on capturing a video image of the beam, determining the position and shape of the beam and then readjusting steering elements in the accelerator.

Transition Radiation Monitors (cont.)

Orbit Correction System The beam orbit in the storage ring must be maintained within 1  m and the orbit corrected at up to 100 Hz. The position of the beam is monitored to within 1  m at 56 monitor stations within the storage ring. Orbit corrector magnets are used to correct the beam position.

Vibration Monitor Position of the experiment stable to 1  m? Internal Vibration Sources –Pumps, compressors, fans... –Ramping of the booster –Crane, forklift, people walking... External Vibration Sources –Trucks, trains, planes –Wind on building walls –Ocean surf ? Separate concrete slabs for building, booster, storage ring/ beamlines. How well do the isolation joints in the floor isolate the slabs?

Vibration Monitor (cont.) A portable vibration monitoring system was developed to measure building vibration and displacement. Custom software to acquire the data and analyse the data is under development.

Vibration Monitor (cont.) Accelerometer SCXI-1531PXI-6052E PXI-1010 Mainframe Accelerometer SCXI-1531PXI-6052E PXI-1010 Mainframe PXI-PCI 8335 MXI-3 with fiber cable, up to 200 m long Computer SCXI-1349

Vibration Monitor (cont.) Acceleration [μm/s ] 06Time [s] Time [s] Displacement [μm] Acceleration Spectrum [μm/s ] Frequency [Hz]

CMCF Diffraction Pattern Using MAR Detector

Motion Control

CMCF Beamline