Alain Blondel – introduction MICE CM Collaboration meeting 12-16 June 2007 at RAL Complete review of the project Organization of efforts towards.

Slides:



Advertisements
Similar presentations
Report from MICE project teams Proposed MICE organogram: revised Revised request for resources for financial year 2003/04 Review of iMICE schedules – status.
Advertisements

Detector Systems Update MICO March 17, MICE Detector Systems  CKOV u Mississippi RAL  TOF0/1 u Hamamatsu PMT assemblies show an increasing.
MICE CMPB Alain Blondel 12 January MICE status & news 1. Collaboration life Common fund Highlights since CM16: target test, ICST visit 2. funding.
June 26, 2009TLH, NFMCC Friday Meeting1 MICE Updates MICE News Overview ISIS and MICE Schedules DAQ Review Spectrometer Update Aspirational Schedule Terry.
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
Paul drumm; 1 st December 2004; PM&TB Report 1 Project Management & Technical Board Reports.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
MICE Project Report Paul Drumm ~ Sunday August 1 st 2004.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
1 MICE Project Report, paul drumm, 9 march 2005 CM Highlights & Tasks… –Tracker base line – scintillating fibres – performance validated –TOF performance.
K. Long, 26 June, 2015 Phase II: introduction to discussion Background (reminder) Responses Assumptions Presently planned bids Input to summary table Summary.
MICE CM15 Alain Blondel 8 June MICE CM 15 Collaboration meeting 8-11 June 2006 at Fermilab complete review of the project. today: -- reviews and.
Alain Blondel MICE VC 9 september 2010 Spokesmouse report o VC 22nd April o 12th-13th May posters for IPAC (Vittorio Palladino) o VC 20th May o IPAC May.
MICE CMPB 3-Feb-2006 Alain Blondel 1 Status of MICE.
MICE CMPB Alain Blondel 2 March spokesperson remarks CMPB 1. funding issues 2.planning the near future what slips and what does not risk areas 3.
Detector Systems Update MICO March 10, MICE Detector Systems  CKOV u No update  TOF0/1 u Tests with laser injection system progressing. u Tests.
CMPB Alain Blondel 14 April STATUS OF MICE.
MICE Video meeting Alain Blondel 7 December MICE -- what running strategy? reflections on steps I and II.
Spokesmouse’s News Agenda: o VC 22nd April o 12th-13th May posters for EPAC (Vittorio Palladino) o VC 20th May o VC 17th June o CM27 (RAL) 7th-10th July,
MICE CMPB Alain Blondel 13 November MICE status & news 1. Collaboration life Common fund Highlights of CM16 2. funding requests: status 3. outstanding.
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
MICE CM Alain Blondel 1   MICE GOALS OF THE MEETING Welcome to MICE CM28.
MICE CMPB Alain Blondel 19 April spokesperson remarks CMPB MICE NEWS.
MICE CM15 wrap-up Alain Blondel 11 June MICE News Collaboration meeting 8-11 June 2006 at Fermilab complete review of the project. for those who.
Project manager report paul drumm CM16 October 2006.
Status of the Muon Ionization Cooling Experiment (MICE) Yagmur Torun Illinois Institute of Technology April 1, 2013.
MICE collaboration meeting Alain Blondel 27 – Welcome to the 10th MICE collaboration meeting. 1.Global neutrino factory situation 2.Possible.
MICE CM in New York Alain Blondel, June MICE COLLABORATION Columbia University June 2003 Action List (online) 1.Funding and some organization.
MICE CM at OSAKA Alain Blondel, August MICE collaboration meeting at OSAKA (thanks to Mike Zisman, Makoto Yoshida, and Koji Yoshimura)Mike ZismanMakoto.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
MICE Preparations for CM18 Michael S. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Video Conference April 12,
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
MICE collaboration meeting Alain Blondel october MICE collaboration meeting 13 at RAL News The international context Goals of the meeting.
MICE VC Alain Blondel 30 August MICE VC 103 MICE news -- see Malcolm's news for an inventory. -- great funding news all summer from USA! (phase.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
MICE CM35 Status and Goals Alain Blondel 1 WELCOME TO MICE CM35! – Status and Goals - Many thanks to Chris Rogers, Debbie Loader and Rose Hayes for taking.
MICE CM16 Goals Alain Blondel 8 October MICE CM 16 Collaboration meeting 8-11 October 2006 at RAL Goals of the meeting thanks to John Cobb & Marco.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
Alain Blondel MICE VC 12 March 2009 Brief MICE news 1. Decay solenoid: operations will restart in early July. Criteria for acceptance have been specified.
MICE VC Alain Blondel 1 MICE NEWS MICE VC 161 Agenda Overall schedule Magnetic field mitigation review Status of things.
MPB 31 October 2012 and FAC 15 November monitor how well we are doing in assembling step IV ! -- should deliver a ‘realsitic schedule scenario’
MICE Oversight Committee Meeting RAL, 24 April 2014 Paul Soler on behalf of the MICE Collaboration Status of MICE and Spectrometer Solenoids.
Paul Drumm, cm10, 27 Oct 2004 MICE Project Report Paul Drumm Collaboration Meeting 10 Rutherford Appleton Laboratory October 2004.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
MICE CMPB Alain Blondel 1 Highlights on MICE.
MICE FAC open session Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
MICE VC Alain Blondel MICE News 9 March 2005 we did not succeed in preparing a good enough I3 proposal for EU on neutrinos. Problems were.
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
MICE Funding Update (U.S.) Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory CMPB Meeting August 1, 2007.
MICE VC Alain Blondel 1 1. MOM is now Victoria 2. Linda Coney is new MICE Online Group coordinator (rep Jean-Sebastien) May we held.
Muon Ionization Cooling Experiment Update 1Alan Bross AEM October 14, 2013.
MICE CM32 Goals of the Meeting Alain Blondel 1 WELCOME TO MICE CM32! – Goals and Status - Many thanks to Victoria Blackmore, Stefania Ricciardi and Mary-Elizabeth.
PId (ToF, CKoVI, EMCAL) V. Palladino et al MICEVC Frascati & Fermilab test beams in July Analysis in progress: MICE PID PhConf 4, 31 Aug aiming.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
MICE – Video conference Alain Blondel, 17 December   MICE selected NEWS: Future meetings Safety review Study of controls Gateway I & Toward Gateway.
MICE news video conference 15 march MICE NEWS 1.TOF0/1/2 funding 2.MICE Installation/Commissioning/Operations group (MICO) 3.Important issues from.
ch/~bdl/lepc/lepc.ppt 1 MICE Status and Plans Rikard Sandström Université de Geneve International Scoping Study CERN,
MICE CM30 Goals of the Meeting Alain Blondel 1 MICE CM30 – Goals and Status.
MICE CM23 Introduction and Meeting Goals Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Malcolm Ellis – Brunel University – 8th April The International Muon Ionization Cooling Experiment.
1 How the Muon Ionization Cooling Experiment Found a Home MICE hall at RAL in Spring
Alain Blondel 4 April  Aspirational MICE Schedule as of April 2008 Febuary-July 2008 STEP I September 2008 November 2008 to summer 2009 STEP II.
1 paul drumm; Date; Title …project report …more comments paul drumm february 2005.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be at Cosener’s14-16 February meeting at Coseners House.
What do we want to achieve in this running period? Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory MICO.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Ionisation Cooling Test.
MICE VC Alain Blondel, April MICE exectutive board met on 1 April 2004 after the collaboration meeting and remarked the very large amount of.
MICE news Alain Blondel 20 – NEWS 1.CERN’s SPSC at Villars: recommandations 2.MICE step Upcoming gateway steps 4.RF from LBNL (Mike)
Status of the MICE Construction Project
Presentation transcript:

Alain Blondel – introduction MICE CM Collaboration meeting June 2007 at RAL Complete review of the project Organization of efforts towards PHASE I Status of Phase II thanks to John Cobb and Marco Apollonio for organisation of the meeting and agenda

Alain Blondel – introduction GOALS of the Meeting 1. status of preparations for step 1 2. get the hardware built and running 2. organize ourselves to run the experiment 3. run plan 4. DAQ plan (monitoring?) 5. software plan 6. analysis plan still a few decisions and unknowns to solve: -- beam tuners collimators and configurations remains -- size of extremities: diffuser and downstream shield -- clear the issue & decide! done -- SW calorimeter? can we have it for septembre? a nice project...should form collaboration to build it. synergy with T2K ND280 and NF baseline&BBL detectors ongoing -- TOF issue not completely solved done -- personel organization for the run! people have to be ready to spend sizeable amount of time in UK starting august 2007 remains -- organize safety training! remains From cern meeting in march:

Alain Blondel – introduction Towards phase I 1. Target 2. In-vault beam line 3. Decay solenoid 4. In-hall beam line 5. Beam optics, the matrix, alignment, correctors, collimators 6. Hall preparation, shielding, safety 7. TOF0, TOF1 8. CKOV1 9. Tracker 10. Spectrometer Solenoids 11. Diffuser 12. DAQ and monitoring 13. Software and analysis 14. Run plan 15. Common fund and shifts

Alain Blondel – introduction Organize ourselves to run the experiment Following suggestions by Paul Drumm: 1.Reinforcement of project management with Wing Lau and Steve Virostek 2.Initiation of regular meetings of MICE Installation and Commissioning group (“MICO”) (first with mostly detectors on 10 Mai 2007) (second complete attendance in person 12 June) both meetings were very successful-- concept will continue and intensify Will report every month at MICE video conference Will have special meeting in person once a month in between VCs Also: reporting at VCs was already done along this scheme MICE news initiated thanks to Malcolm Next: organize presence at experiment and, eventually, shifts etc..

Alain Blondel – introduction Main info stemming of yesterday’s MICO meeting (Paul will produce an action list) 1.Beam line -- much progress on target – now able to activate at full current and to catch target back without dropping it out of control. 700k pulses at full swing recorded. Black dust issue needs to be solved before installation in ISIS. -- major issue with muon decay solenoid! (see C. Nelson’s talk) Leak found. Can it be repaired? Will require repair which cannot be done before closing date 1st August. Next window for installation is Christmas2007 shutdown. Very recent. Consequences need to be evaluated. Should understand whether it is feasible (and desirable) to have a ‘weak’ beamline installed nevertheless for October for the sake of shaking down beam line, detectors, DAQ, production of results, etc… with operation at low rate.

Alain Blondel – introduction Main info stemming of yesterday’s MICO meeting (II) (Paul will produce an action list) 2. Detectors and DAQ are following schedule -- CKOV second half of July -- beam monitors end of August -- Tracker 2/3 complete. Tests with MICE DAQ starting in July in RA12 -- TOF0 and TOF1 being built, ready early october +TOF2 in march KL and prototype SL layer end of october -- DAQ workshop will be organized in 4th week of july at RAL Supports, cable lengths, layout, ground loops etc… were discussed 3. Spectrometer solenoid is progressing well but some schedule slip (mostly under control) SS1 should arrive at RAL in March 2008 and SS2 in June. Count one month more for unwrapping, connections etc.. Will require one upstream but two downstream magnetic shields to be built.

Alain Blondel – introduction Updated Schedule Summary From Steve Virostek

Alain Blondel – introduction -- USA: funding from the NFMCC (DOE baseline scenario 4.125M$) + 4MW RF source + NSF grant (IIT) 300k$ + MRI grant (tracker + tracker solenoid) 750k$ (NB tracker part was reduced substantially by D0 electronics deal) + DOE suppl. for MUCOOL coupling coil 300k$ + Fermilab 800k$ + NSF tracker proposal by Pr G. Hanson 400 k$ (postdocX3 years) (+ equal amount of startup fund) also UNH with Ulysse Bravar further request submitted: NSF MRI for MUCOOL CC (should know by june) + other avenues being investigated (e.g. PIRES) Summary of funding situation (I) -- UK: PhaseI = 9.7M£ (OST+ rolling grants + CCLRC contributions) Phase II bid submitted in July Peer review positive; recommended 100% of support for engineering 2 + option for 3d focus pair modules support for exploitation Merge of CCLRC and PPARC into STFC leads to general review during next year  reconcilitation for one year funding. Authorization to post official notice for FC module in EU journal (1st step in call for tender process) preselection of vendor ongoing.

Alain Blondel – introduction -- Japan: Very important contribution by Osaka and KEK was interrupted in 2006 Bids have been resubmitted for US-Japan coll. and Japan No effect on tracker. Affects absorber bodies and controls. -- Switzerland: PSI solenoid Uni-Geneva+SNF (DAQ, trigger + TOF0 PMTS + 2PhD+1RA ~ 1000 kCHF so far) small additional request for online (20kCHF) submitted +Bulgaria collaboration (travel, PID electronics) (74kCHF granted) -- CERN: 1 RF station providing 4MW (173kCHF or 110k€ FTE) agreed on 3 Nov 2006: Maurizio Vretenar charged of execution -- Netherlands: (Mag probes) -- Italy: (TOF, Calorimeter) 500 k€ from INFN k€ from RAL end-of-year 2006 to completion project recognized within INFN NTA (New Techniques of Acceleration) -- China: (MICE coupling coils) propose to build first coupling coil with US funding (MUCOOL coupling coil) + bid submitted from ICST to HIT for + delivery of two MICE coupling coils (requires NFMCC to purchase the conductor and power supplies) Summary of funding situation (II)

Alain Blondel – introduction Summary of funding situation (III) Missing but requested: 1. UK: Phase II bid 2. US: Mucool coupling coil MRI bid (rest is within MICE yrs plan) 3. China: MICE coupling coils (review passed with flying colors!) 4. Japan: Absorbers bodies and controls + everywhere: manpower Globally the funding situation has improved to the point where we have reasonable confidence in having resources for the MICE hardware to be completed end of Only major piece missing: UK Phase II.

Alain Blondel – introduction  Aspirational MICE Schedule now (unchanged since march 2006) 15 September 2007 STEP I November 2007 STEP III: begin winter 2008 STEP II STEP IV: fall 2008 STEP V: summer 2009 STEP VI end 2009 PHASE I PHASE II R&D beam line commissionning starts August 2007! From cern meeting: UK PHASE I

Alain Blondel – introduction  We should revisit our MICE Schedule: as of june 2007 (unchanged since march 2006) 1 October 2007 Or january 2008 STEP I April 2008 STEP III: July 2008 STEP II STEP IV: Delivery of 1st FC May 2009 STEP V: summer 2009 STEP VI end 2009 PHASE I PHASE II R&D beam line commissionning starts august 2007(?) UK PHASE I

Alain Blondel – introduction Goals of meeting -- re-baseline the schedule and understand how to best use our time and resources -- status of software and analysis: are we ready to receive data? -- understand progress wrt phase II (Lh2 R&D, RF power source, RF R&D, etc..) My pet questions: -- do we have the full settings for the beam that would be used as starting points? -- do we have all the tools to tune the beam? (correctors, collimators) we can chose to reweight the beam to zero averages and the right emittance etc... but this is a rather heavy programme. are we able to do this or do we need to be able to minimize the effects that we need to reweight away? -- establish run plan for commissioning, step I and II -- can we get “online” results ? How reliable can they be?