Atsuto Suzuki. 1. Toward ILC Construction : Japanese Activities 1. Toward ILC Construction : Japanese Activities.

Slides:



Advertisements
Similar presentations
Prioritized New Research Initiative on Climate Change in Japan - under a new phase of the Science and Technology Basic Plan – Hiroki Kondo Special Advisor.
Advertisements

July 28, 2011 ITER Thomas J. Vanek Senior Policy Advisor Fusion Energy Sciences.
Promoting advanced accelerator science & technology with the Industry-Government-Academia collaboration April 17, 2009 Advanced Accelerator Association.
European Strategy for Particle Physics 2013 Preparatory group->Strategy group Individual town meetings Town meeting in Krakow: september 2012 Drafting.
Manpower and space requirements for ILD 2015/1/13 Y. meeting at SLAC 1.
Chubaka Producciones Presenta :.
FACET: A National User Facility Carsten Hast SLAC National Accelerator Laboratory.
LCC status Lyn Evans 1April 18, 2015PAC Orsay. ILC in Linear Collider Collaboration 2 ICFA Chair: J Mnich Program Adv. Committee PAC – Chair: N. Holtkamp.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
Current Status of ILC Project Keisuke Fujii, KEK May 9, 2015.
ECFA LCWS 26 May 2013 DESY Sachio Komamiya The University of Tokyo 1 26 May 2013 DESY Hamburg Linear Collider Board (LCB) Report.
Universal Declaration on Bioethics and Human Rights.
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
ECFA European Committee for Future Accelerators ECFA ACTIVITIES Lenny Rivkin, EPFL & PSI CHIPP Plenary meeting Fribourg, 30 June – 2 July, 2014.
Atsuto Suzuki. 2 Japan Policy Council Second Recommendations: Regional Development through Creation of Global Country inside Japan Realizing a global.
LCB/ICFA meeting at Newport News with full snow, February This is only for TB meeting Presentation and not for Distribution. ( )
Linear Collider Collaboration Status L. Evans 1LCWS Tokyo 11 th November 2013.
MEXT Review Process in Japan 2014/7/16 Y. Sugimoto 1.
HiGrade WP2 & WP4 Coordination & Governance Brian Foster (Hamburg/DESY/Oxford & GDE) HiGrade Meeting LAL/Orsay 12/10/11.
J. Mnich for Pier Oddone | ICFA Report to Lepton Photon 2013 June 28, 2013 | Page 1 ICFA Report to Lepton Photon 2013 J. Mnich (for Pier Oddone, ICFA chair)
LCC Physics&Detector Report Hitoshi Yamamoto SiD Meeting Jan,
Status of Linear Collider Activities Rika Takahashi on behalf of the LC Communicators 104 November, 2013 Interactions US.
Hitoshi Yamamoto, 15-Mar-2013, ILC detector monthly meeting, KEK 1 Detector Introduction.
E.Elsen European LC Workshop, Cockcroft, UK, Jan 2007 Perspectives for European LC R&D.
CERN Strategy Group WS at Zeuthen Input from Japan Mitsuaki NOZAKI (KEK)
27-March-10 LCWS10 - Beijing Global Design Effort 1 Barry Barish LCWS10 - Beijing 27-March-10 “Cost Containment” for the TDR.
1 The Design & Value Costs SRF Technology The XFEL as a Prototype Japan as a Host International Linear Collider Status Mike Harrison.
The time line Autumn 2011CERN Council initiated an update exercise to the European Strategy for Particle Physics which was approved by a special Council.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
ILC in Japan A 10 minute introduction H.Weerts Argonne National Lab March 24, 2014 University of Chicago.
Thailand’s Preparation for Starting a Nuclear Power Program Mr. Pricha Karasuddhi Technical Advisor Nuclear Power Program Development Office(NPPDO) Ministry.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
HEPResearchers Set-up JLCB and JLCC ~6 Cite Decision Design ILC Lab. Japan Policy Council Positive Reference from New Prime Minister.
THE INTERNATIONAL COMMITTEE FOR FUTURE ACCELERATORS (ICFA) Roy Rubinstein2nd International Conference on New Frontiers in Physics - 4 September
Report from ILCSC Shin-ichi Kurokawa KEK ILCSC Chair GDE meeting at Frascati December 7, 2005.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
1 SPAFOA Capitol Hill Briefing December 2013 Harry Weerts International Linear Collider - progress & status SPAFOA meeting, Dec 11, 2013, H.Weerts.
Status Report on ILC Project in Japan Seiichi SHIMASAKI Director, Office for Particle and Nuclear Research Promotion June 19, 2015.
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
LCWS13 Tokyo. Mr. Kawamura’s Talk Text (in English) – Can be downloaded from the workshop home page Please use today’s version Highlights – We are aware.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
CLIC project 2012 The Conceptual Design Report for CLIC completed – presented in SPC, ECFA and numerous meetings and conferences, also providing basis.
Hitoshi Yamamoto, 2-Oct Detector Tohoku Forum for Creativity - a Pilot Program - ‘Particle Physics and Cosmology after the Discovery of the Higgs.
E.Elsen GDE Meeting, Beijing, Feb 2007 Perspectives and Planning for European LC R&D.
The Situation in Japan Yasuhiro Okada, Executive Director, KEK ILD meeting 2014 September 7, 2014, Oshu-city, Iwate, Japan 1.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
ILC MAC April 07 Global Design Effort 1 European Regional R&D plan Brian Foster (Oxford & GDE) MAC Meeting.
The Status of the ILC Project in Japan
The Status of the ILC Project in Japan
LCC L. Evans, Santander, 2nd June 2016
Mike PAC Charge & Agenda ALCW15 Plenaries CERN SPC – September 2014
ILC project Status Yasuhiro Okada (KEK) ILC detector meeting
ILC Status in Japan ECFALC M.Yamauchi KEK June 02, 2016
Introduction to the Workshop
Annual ILC detector meeting K. Kawagoe (Kyushu)
ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe – KICK OFF MEETING
Report from ICFA ICFA mission and membership ICFA Panels ICFA and ILC
FALC report and KEK’s plan for the ILC
Yasuhiro Okada, Executive Director, KEK
McDonald’s calendar 2007.
ICFA Report to FALC June to November 2015 J. Mnich (DESY)
February 2007 Note: Source:.
Eurostat contribution
McDonald’s calendar 2007.
CONVENTION ESTABLISHING THE SQUARE KILOMETRE ARRAY OBSERVATORY
2015 January February March April May June July August September
Presentation transcript:

Atsuto Suzuki

1. Toward ILC Construction : Japanese Activities 1. Toward ILC Construction : Japanese Activities

HEPResearchers Set-up JLCB and JLCC ~6 Site Decision Design ILC Lab. Japan Policy Council Positive Reference from New Prime Minister Detailed Design of International Country Project Proposal to Science Council of Japan Formal Message on Hosting ILC in Japan Establish ILC Pre- J-Lab. Proposal of hosting ILC in Japan to Government Cite/Host Establish at European Strategy Meeting Dec. 11, 2012

Site Decision Design ILC Lab. Technical Evaluation Committee Socio-Environmental Evaluation Committee International Evaluation Committee January, 2013 Site Evaluation Committee August, 2013

Project Proposal to Science Council of Japan Review by Japan Science Council September 26, 2013 It is essential to start investigating the reliability on hosting the ILC in Japan, taking 2~3 years. our understanding: “go-sign” of ILC pre-Lab.

TDR September 28, 2013 HEPResearchers Set-up JLCB and JLCC Site Decision Design ILC Lab. Project Proposal to Science Council of Japan Formal Message on Hosting ILC in Japan Proposal of hosting ILC in Japan to Government Formal message on starting diplomatic negotiations of the ILC project by Japanese government

October, 2013 On 2 October, Minister of MEXT said that the government will create a working group of advisors with specialists from various fields which will review the possible issues on the realization of the ILC in Japan. In December, 0.5 M$ requested by MEXT was approved in the fiscal year 2014 budget. Even though the amount is small, it is symbolic that the Japanese government for the first time allocates a “preparatory budget” for the ILC as an official project

Establish ILC Pre- J-Lab. February February 6, 2014 LCC & LCB

Review by Science Council of Japan Task Force Particle ・ Nuclear Physics WG Academic Experts Committee TDR Validation WG February 6, 2014 May 8, 2014 MEXT TDR Validation Value Estimation for Quake-Proof Value Estimation for Environmental Improvement Total Value Estimation Clarification of ILC Physics Review Issues

construction Further Action Plan before Construction Action Plan toward before Construction in Action Plan toward before Construction in 2014

Engineering R&D Schedule (LCC-PreLab) by A. Yamamoto Expense Account for Preparatory Phase① ② ③ ④ ⑤ ⑥ ① Accelerator ② Detector ③ CFS ④ Safety ⑤ Environment ⑥ Management M$ 2013

Engineering R&D Schedule (LCC-PreLab) Pre-construction Schedule (LCC-PreLab) Further Action Plan before Construction sorry, sorry ・・・

Engineering R&D Schedule (LCC-PreLab) Pre-construction Schedule (LCC-PreLab) Staging Scenario (LCB, LCC) Further Action Plan before Construction

Engineering R&D Schedule (LCC-PreLab) Pre-construction Schedule (LCC-PreLab) Staging Scenario (LCB, LCC) Lab Design: Organization, Structure (LCB, LCC) LCB WG (Feb ~ ) PIP & PDG Further Action Plan before Construction CERN EU XFEL Procurement Legal Base Personnel ITAR ILC ITER

Engineering R&D Schedule (LCC-PreLab) Pre-construction Schedule (LCC-PreLab) Staging Scenario (LCB, LCC) Lab Design: Organization, Structure (LCB, LCC) MEXT Validation (LCC-PreLab) Further Action Plan before Construction

Engineering R&D Schedule (LCC-PreLab) Pre-construction Schedule (LCC-PreLab) Staging Scenario (LCB, LCC) Lab Design: Management, Structure (LCB, LCC) MEXT Validation (LCC-PreLab) Full Proposal (LCB-LCC-PreLab) ConstructionStart Further Action Plan before Construction

Engineering R&D Schedule (LCC-PreLab) Pre-construction Schedule (LCC-PreLab) Staging Scenario (LCB, LCC) Lab Design: Management, Structure (LCB, LCC) MEXT Validation (LCC-PreLab) Governmental Negotiation Preparatory PhaseDecision-Making Full Proposal (LCB-LCC-PreLab) Further Action Plan before Construction ConstructionStart

Engineering R&D Schedule (LCC-PreLab) Pre-construction Schedule (LCC-PreLab) Staging Scenario (LCB, LCC) Lab Design: Management, Structure (LCB, LCC) MEXT Validation (LCC-PreLab) Governmental Negotiation Preparatory PhaseDecision-Making Full Proposal (LCB-LCC-PreLab) Further Action Plan before Construction ConstructionStart 3-Legged Race : HEP community / Governments

Cite-Dependent Value (LCC-LCB-PreLab) Governmental Negotiation Preparatory PhaseDecision-Making Further Action Plan before JYen/Euro TDR Value Estimation

Cite-Dependent Value (LCC-LCB-PreLab) Governmental Negotiation Preparatory PhaseDecision-Making Further Action Plan before Construction Value-Sharing Model HostOthers CFS - LAND??? % Instrument - Electricity??? % Maintenance/Labor??? % Detector??? %

Cite-Dependent Value (LCC-LCB-PreLab) Governmental Negotiation Preparatory PhaseDecision-Making Further Action Plan before Construction Value-Sharing Model Diplomacy of Diet Members’ Caucus

Next Meeting in July

The ILC is a global project, to be designed and realized by a worldwide cooperation of scientists and engineers. In Japan, for the first time ever, the government has allocated a budget for the coming Japanese fiscal year to investigate and examine the ILC project itself, which is in addition to the existing funding for the research and development. This has great significance in that the Japanese government has shown a vital interest in the ILC project. We have reached the stage where we must now work together with other governments for the realization of the ILC. The Japanese government intends to perform concentrated investigations and address the major issues and arrive at a conclusion about hosting the ILC by the end of JFY2015. January 8, 2014

Dr. E. Moniz Mr. H. Shimomura Dr. Ernest Moniz It was a great pleasure to talk with you when I visited the United States recently. In our conversation, I explained the current situation regarding the International Linear Collider (ILC) project in Japan, and I would like to reiterate what I said through this letter. February 7, 2014

May 2014 Letter Letter from to CERN DG EU Government June 2014 Meeting : France-Japan Friendship Diet Members’ Caucus October 2012 March 2013 April 2014 Lyn Brian Harry

3. Summary ①②③④⑤⑥⑦⑧⑨①②③④⑤⑥⑦⑧⑨ Further Action Plan before Construction