1 Spectrum Management 2007 Industry Association Roundtable Paul J. Sinderbrand Wilkinson Barker Knauer, LLP 202.783.4141

Slides:



Advertisements
Similar presentations
Key Technical Provisions of the White Paper and Protections Afforded to ITFS Licensees. National ITFS Association Annual Conference February 16 th – 19.
Advertisements

LEGAL AND TECHNICAL OVERVIEW Broadband Radio Service (Auction 86) Nancy Zaczek John Schauble FCC Wireless.
November 2013 doc.: IEEE /1449r2 Tevfik Yucek, Qualcomm Inc.Slide 1Submission Authors: Date: Proposal for UNII-4 band coexistence.
Protecting RNSS Spectrum Domestic and International Activities Karl B. Nebbia Associate Administrator Office of Spectrum Management National Telecommunications.
Upcoming FCC Spectrum Auctions Bryan N. Tramont Wilkinson Barker Knauer, LLP
Overview of Service Rules: Technical and Licensing Issues Keith Harper Electronics Engineer, Mobility Division, WTB November 29, GHz Band Auction.
Introduction and Overview Presentation by Dale N. Hatfield at the Radio Regulation Summit: Defining Out-of-Band Operating Rules Silicon Flatirons Center.
New Federal Spectrum Access System - US 3.5GHz bands -
April 2009 doc.: IEEE /xxxxr0 May 2015
Broadband over Power Line ARRL Statement Paul L Rinaldo Chief Technology Officer American Radio Relay League Tel: , Fax:
Current Issues Affecting Fixed Wireless: An Update on FWCC Activities National Spectrum Management Association Cheng-yi Liu |
Key Provisions of WCA/NIA/CTN Proposal Presented by Todd D. Gray February 18, 2002.
0 Slide 0 Preventing Interference from Earth Station Vessels National Spectrum Managers Association May 19, 2004 Mitchell Lazarus | |
Slide 0 Spectrum on a Budget E DUCAUSE October 9, 2006 Mitchell Lazarus | |
Overview of Service Rules and Due Diligence Dwain Livingston Senior Engineer Mobility Division, WTB November 1, – 1990 MHz BROADBAND PCS Auction.
Doc.: IEEE j Submission Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
Doc.: IEEE /013r0 Submission March 2003 Carl R. Stevenson, Agere Systems RR-TAG Opening Report Report on January Interim Meeting Report.
A View from the FCC’s Office of Engineering & Technology NSMA Spectrum 2008 May 21, 2008 Julius P. Knapp Chief Office of Engineering and Technology Federal.
What You Need to Know about the Proposed New ITFS/MMDS Band Plan and Rules Chair: David Moore, Executive Director, Telecommunication Services, CTN Los.
Doc.: IEEE /0023r0 Submission May 2009 Rich Kennedy, Research In MotionSlide 1 TV White Spaces Regulatory History Date: Authors:
C OMSEARCH TM Regulatory Review presented at National Spectrum Managers Association Spectrum Management 2004 May 19, 2004 Rosslyn, VA presented by Ken.
Overview of Service Rules: Technical Issues Phase II 220 MHz Service (Auction No. 72) Gary Devlin Engineer, Mobility Division Wireless.
Wireless Roundup Spectrum Management 2007 NSMA Presented by David Meyer May 22, 2007.
Key Provisions of WCA/NIA/CTN Proposal Presented by Todd D. Gray February 17, 2004.
Doc.: 18-12/108r0 Submission October 26, 2012 Slide 1 FCC TV Band Incentive Auction: Impact on Unlicensed Operation Notice: This document has been prepared.
Element 3 General Class Question Pool Your New General Bands Valid July 1, 2011 Through June 30, 2015.
Slide 0 National Spectrum Managers Association Industry Round Table: Fixed Service Mitchell Lazarus | May 22, 2007.
Overview of Service Rules and Due Diligence Keith Harper Electronics Engineer Mobility Division, WTB March 7, 2007 BROADBAND PCS Auction No. 71 Seminar.
Doc.: IEEE d Submission November 2014 John Notor, Notor Research Slide 1 Project: IEEE P Working Group for Wireless Personal Area.
1 International Bureau 2008 Annual Report January 15, 2009.
1 Spectrum Management 2008 Industry Association Roundtable Paul J. Sinderbrand Wilkinson Barker Knauer, LLP
Technical Issues, Due Diligence and Licensing Parameters Keith Harper Engineer Mobility Division, WTB June 10, 2008 Auction 78 Seminar BROADBAND PCS.
1 WiMAX and the Canadian Radio Spectrum April 28, 2006 Angela Choi Communications Engineer Pacific Region Industry Canada
0 Slide 0 National Spectrum Managers Association Industry Round Table – Fixed Wireless Service May 20, 2008 Mitchell Lazarus | |
National ITFS Association Conference Ft. Lauderdale, FL February 17, 2004 What You Need to Know about the Proposed New ITFS/MMDS Band Plan and Rules Paul.
71-95 GHz Registration A Streamlined Approach to Licensing.
SPECTRUM MANAGEMENT 2004 National Spectrum Managers Association Satellite Spectrum Management Issues Carlos M. Nalda May 19, 2004.
Doc.: IEEE /1537r1 Submission January 2016 Rich Kennedy, Unlicensed Spectrum Advocates, LLCSlide 1 IEEE Regulatory State of Affairs Date:
NSMA Working Group Conference Report Larrie Sutliff, Chair NSMA Spectrum Management /16/2012.
Doc.: IEEE /0077r2 Submission January 2009 Peter Ecclesine, Cisco SystemsSlide 1 TV white space update 1 Date: Authors:
Coexistence Studies in IEEE Meeting #3 San Francisco, July 2003 Reza Arefi IEEE C /72.
Spectrum Sharing in 3.5 GHz Band
1 Spectrum Sharing and Mobile Broadband Michael Ha, Deputy Chief Policy and Rules Division Office of Engineering and Technology CORF Annual Meeting May.
Agenda item 1.16 VHF data exchange system (VDES).
Promoting Spectrum Access for Wireless Microphone Operations.
Use of Spectrum Bands Above 24 GHz For Mobile Radio Services ‘5G’…
1 70/80/90 GHz Web-Based Coordination Improving the Effectiveness of the Domestic Spectrum Management Process National Spectrum Managers Association Arlington,
August, 2012 MBANS FCC Rules Summary Information document for SRD/MG on the FCC adopted MBAN rules under part 95 MedRadio service on 24 May 2012.
ITFS Becomes EBS New Rules and New Band Plan Presented by Edwin N. Lavergne February 15, 2005.
0 Slide 0 National Spectrum Managers Association Unlicensed Devices May 16, 2006 Mitchell Lazarus | |
,4-3,8 GHz ECC Decision (11)06 + Guidelines to support the implementation of this framework at national level (mobile/FSS and mobile/FS coexistence)
CEPT position on WRC-12 AI’s 1.3, 1.4, 1.7, 1.12 and 1.25
Access Broadband Over Power Line
Operation of Radar Services in 76 – 81 GHz band
Industry Association Roundtable
Mobile VSATs An Overview of Ku-Band Mobile Satellite Services
Satellite Industry Association Spectrum Priorities and Objectives May 20, 2008 S I A M E M B E R C O M P A N I E S.
Spectrum Frontiers – 5G Michael Ha, Deputy Chief
National Spectrum Managers Association
November 2012 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: FCC TV Band Incentive Auction: Impact on.
Presentation to ICTS: Domestic and International Issues for AMT
November 2012 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: FCC TV Band Incentive Auction: Impact on.
Ofcom 5 GHz Consultations Questions and Answers
April 24, Study Group 1 A Regulatory Framework for Use of TV Channels by Part 15 Devices John Notor, Cadence Design Systems, Inc.
July 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: FCC Comments Supporting MBANS ET Docket
Wireless Regulation: Washington Update Stephen E. Coran Rini Coran, PC
MHz FCC Action Date: Authors: May 2006 May 2006
Discussion on 6 GHz Band Support
GSC position on key WRC-19 AI 1.5 ESIMs
Preliminary GSC positions on WRC-19 agenda items 1.13 IMT
Presentation transcript:

1 Spectrum Management 2007 Industry Association Roundtable Paul J. Sinderbrand Wilkinson Barker Knauer, LLP

2 Wireless Communications Association Represents Wireless Broadband Service Providers and Manufacturers Primary Current WCA Focus 700 MHz WCS BRS/EBS MHz 24 GHz, LMDS and 39 GHz Above 70 GHz

3 WCS-DARS Coexistence WCS at / MHz) Is Poised To Become A Home To WiMAX e Services, but... DARS Terrestrial Repeater Technical Limits Must Be Adopted To Protect WCS From Interference. WCS OOBE Limits Are More Restrictive Than Necessary To Protect DARS And Must Be Loosened.

4 WCS ( / MHz) A BlockB BlockC BlockSirius XM D BlockA BlockB Block SDARS Repeater SDARS RepeaterSDARS 5 MHz 4.2 MHz4.1 MHz 4.2 MHz3.725 MHz 5.06 MHz MHz5 MHz Lower WCSUpper WCSDARS

5 DARS Terrestrial Repeaters Ten years after DARS first authorized to use “gap fillers,” FNPRM is still pending on technical rules. Evidence is clear that high-powered DARS repeaters can result in intermodulation and blanketing interference to WCS. In 2001, FCC granted XM and Sirius STAs allowing terrestrial operations (40,000 Watts EIRP in some cases), subject to obligation to cure interference to WCS. WCS is prepared to compromise in development of final rules that promote coexistence, but DARS insistence of grandfathering all existing repeaters, without protection obligation, is a non-starter.

6 WCS OOBE Limits OOBE limits between 2320 MHz and 2345 MHz were adopted in 1997 before WCS or DARS technologies were settled: Fixed stations: log (p) dB Mobile stations: log (p) dB FCC has indicated a willingness to revisit OOBE. Restrictions effectively preclude use of C and D Blocks for mobile and impose undue economic costs on A and B Blocks. Onerous limits are not necessary to protect DARS.

7 2.5 GHz Restructuring FORMER PLAN

8 2.5 GHz – Benefits of Rebanding Accommodate demand for high-power video and data transmissions in MBS Separate video from cellularized data to protect both against interference De-interleaved Lower Band Segment (LBS) and Upper band Segment (UBS) provide large, contiguous blocks of spectrum with good upstream/downstream separation and natural pairings Flexible use technical rules allow FDD and TDD to coexist but require innovative approaches to avoidance of interference

9 Flexibility/Protection Adjacent Channel Interference Standard log (P) spectral mask not sufficiently protective when non-synchronized technologies involved. WCA proposed dual mask: log (P) certification mask log (P) dB operational mask measured 3 MHz and beyond, but only upon request of other licensee in market, who must also meet tighter mask FCC adopted dual mask but protection only required 60 days after showing of “documented interference”. And, FCC limited complaints to first adjacent channel licensee despite acknowledging that threat can come from beyond first adjacent channel. WCA Petition for Reconsideration filed 7/16/06 and is pending

10 WCA Petition for Reconsideration Provide more rapid response to documented OOBE interference: Require compliance with the more restrictive mask within 24 hours where a new or modified base station interferes with an existing base station; Require a cure within 24 hours where an existing base station suffers interference from an outdoor user station and within 14 days where a new or newly-modified base station suffers such interference; Provide that in other cases of documented interference from a user station to a base station, both licensees have an obligation to cooperate in good faith to reasonably mitigate the interference. Provide all licensees, not just first adjacent channel licensee, with standing to submit documented OOBE interference complaint.

11 Flexibility/Protection Cochannel Interference Limiting signal strength at service area boundary to 47 dBµV/m does not protect base station from interference by non-synchronized cochannel base station. Height benchmarking provides additional protection against base-to-base interference. If height of antenna above average terrain along the radial between stations exceeds D²/17, station is outside of height benchmark (where D is distance to GSA boundary) Base station exceeding benchmark must restrict received signal level to -107 dBm or less at base station that is within benchmark 4/27/06 Reconsideration Order fails to address debate over process for relief – how long must interference be suffered?

12 WCA Petition for Reconsideration If interfering base station is new or newly- modified, it must limit received signal at victim base station to -107 dBm/5.5 MHz within 24 hours; If pre-existing base station causes interference to a new or newly-modified base station, it must limit received signal at victim base station to -107 dBm/5.5 MHz within 90 days.

13 BRS Relocation From MHz Ninth Report and Order in ET Docket No Fails To Protect Incumbents FCC imposes relocation obligation only on cochannel AWS Adjacent channel interference must be cured by AWS, but only after the fact – jeopardizing existing operations! FCC should require prior coordination by AWS with BRS under Section (d) notice and response system, just as AWS must do with point-to-point microwave

14 BRS Relocation From MHz Since AWS has 15 years to relocate BRS, FCC must permit BRS to increase throughput entitled to relocation during interim. BRS incumbents should be permitted to “self- relocate” just as point-to-point microwave can. Rules governing process must be revisited: Incumbent should be entitled to select and deploy comparable facilities (subject to pre- construction process to avoid gold-plating). Internal costs must be recoverable. Incumbent should get pre-payment to avoid having to fund its own involuntary relocation.

GHz BRS Relocation MHz cannot be shared with BAS – SBE and others have pending proposals for digitizing and repacking BAS in MHz band. Sharing with MSS FCC’s adoption of hard limits on satellite PFD using ITU coordination triggers designed for analog radio relay systems does not provide sufficient protection. US proposals in WRC process are more restrictive and should be adopted. Globalstar petition for rulemaking to allow ATC in MHz fails to provide protection for BRS channel 1. FCC denied BRS 1/2 ability to transmit on old and new channels simultaneously to provide seamless migration.

MHz 3/16/05 R&O in ET Docket No Innovative licensing system Unlimited number of nationwide licenses for entire 50 MHz Equipment must employ some “contention based protocol” Each higher power fixed and base station must be registered with FCC prior to use Unregistered low power mobile and portable stations permitted but must be authorized by a registered base station

GHz Interference Rules Gov’t radiolocation 80 km coordination zones FSS 150 km circular protection zones Intra-service protection Each terrestrial licensee must consult database prior to registration and make “every effort to ensure that [contemplated location and parameters] will minimize the potential to cause and receive interference” Yet, no terrestrial licensee is entitled to interference protection from another And, each terrestrial licensee must cooperate to avoid interference to others, even those that come later in time

GHz – The Problems FSS protection too conservative “Contention based protocol” requirement doesn’t avoid interference FCC reluctant to adopt a single CPB Even if and adopt CPBs, they will not avoid interference between Wi-Fi and WiMAX systems Interference rules deter investment – worse than being secondary “every effort” vs. no protection Obligation of first in to resolve interference to newcomers FCC may be poised to act on reconsideration Retain existing rules License some or all of band Adopt alternative “light license” approach

19 THANK YOU! Paul J. Sinderbrand Wilkinson Barker Knauer, LLP