1 Presentation to the Portfolio Committee: Water & Environment Presentation by Mr Trevor Balzer Programme Manager: Special Projects 16 – 17 March 2010.

Slides:



Advertisements
Similar presentations
Sustainable Management of Scarce Resources in the Coastal Zone SMART ICA3 – Kick-off Meeting CEDARE, Cairo, 5-6 January, 2003 Case Study Jordan.
Advertisements

1 Presentation to the Portfolio Committee on Water Affairs and Forestry and Select Committee on Land and Environmental Affairs 2005 Department of Water.
OUTCOMES AND STRATEGIC ISSUES FROM THE MCC WSLG 19 November
SIP 18 WATER AND SANITATION MASTER PLAN Water and Sanitation Master Plan NDHS and DWA Water & Sanitation Master Plan.
About Presentation About Rand Water Rand Water and MDGs Economic Policy and Implications Rand Water and its Role in Africa Conclusion.
Water Sector response to ASGISA IMC Department of Water Affairs and Forestry June 2008.
DEPARTMENT OF COOPERATIVE GOVERNANCE AND TRADITIONAL AFFAIRS PRESENTATION TO THE PORTFOLIO COMMITTEE Municipal Infrastructure Grant (MIG) Projects and.
Tseliso Ntili Provincial Head: Department of
22/03/13 Integrated Water and Sanitation Service chain Cooperation across the water and sanitation value chain World Water Day 22 March 2013 Butare, Rwanda.
11 ICLEI / NMBM DROUGHT / FLOODING WORKSHOP WATER & SANITATION B.J. Martin 25 September 2013.
For Sustainable Development Progress Report on Green Fund Select Committee Meeting - 7 May 2013.
Municipal and Industrial Conservation and Water Reuse Workgroup Elizabeth Lovsted Sr. Civil Engineer Urban Water Institute Annual Water Policy Conference.
Constant Flow Community Water Supply in South Africa.
Presentation to the Portfolio Committee: Water & Environmental Affairs Presentation by Mbangiseni Nepfumbada Acting DDG: P&R 11 August Briefing.
National Investment in Water and Waste Water Infrastructure, Funding & Pricing Mid-West Regional Authority Annual Conference 2009.
Imagine the result Impact Study on MSD Rate Payers of Proposed Consolidation/Merger Phase II – Towns of Biltmore Forest, Montreat and Weaverville Presentation.
Water Stress in China: Shortage and Pollution CHEN Ying Research Centre for Sustainable Development (RCSD) Chinese Academy of Social Sciences (CASS) CASS-Nottingham.
‘Improving Quality of Life and Enhancing Sustainable Economic Development’
1 ALLOCATIONS for the Integrated National Electrification Programme 2009/10 Presentation to the Select Committee on Finance 25 February 2009.
Applying scientific thinking in the service of society Water and Sanitation Low carbon cities meeting 04 – 06 October 2010.
Department of Water Affairs Water Requirements and Availability Reconciliation Strategy for Mbombela Municipal Area Water Conservation and Water Demand.
SUMMARY OUTCOMES OF THE PROVINCIAL WATER INDABA Some emerging issues for the sector WSLG 19 November
1 Water Services to Schools and Clinics Programme 20 June 2007 Presentation to Select Committee on Education and Recreation By DWAF.
World Water Forum Session 3.2.1: Using a structured set of strategies to ensure adequate water to the large metropolitan areas in South Africa Peter H.
Western Cape Water Sector Plan Mr R Dyantyi MEC for Local Government & Housing (DLG&H) May 2007.
2008 Electricity Distribution Maintenance Summit Stream 3A: Funding, Investment and Financial issues 10 June 2008 Theo van Vuuren Divisional Executive.
DCoG Presentation to the Appropriations Committee HEARINGS ON THE MEDIUM TERM BUDGET POLICY STATEMENT 2 November 2010.
ACCELERATED COMMUNITY INFRASTRUCTURE PROGRAMME MOKGALAKA.
Water Conservation and Water Demand Management Progress with the Strategy Implementation 16 September 2010.
1 Presentation to the Portfolio Committee: Water & Environment Presentation by Mr Trevor Balzer Programme Manager: Special Projects 16 – 17 March 2010.
NATIONAL WATER AND SANITATION INFRASTRUCTURE MASTER PLAN STRATEGIC INFRASTRUCTURE PROJECT 18 (SIP 18) 1 1.
Alternative water resources Presentation to Portfolio Committee 14 September 2005.
Mbombela Climate Change Workshop 2 5 November 2015 Civic Centre Hall, Mbombela.
ILembe District Municipality Municipal Water Infrastructure Grant Projects and Project Readiness 13 TH SEPTEMBER 2013 iLembe District Municipality Municipal.
Municipal involvement in the energy crisis Select Committee on Labour & Public Enterprises.
1. PRESENTATION TO THE SELECT COMMITTEE ON APPROPRIATIONS Public Hearing on Division of Revenue Bill March
PRESENTATION TO THE PORTFOLIO COMMITTEE ON SPORT AND RECREATION MUNICIPAL INFRASTRUCTURE GRANT By Molatelo Montwedi Date: 14 June 2005.
QUARTERLY PERFORMANCE OF THE MUNICIPAL INFRASTRUCTURE GRANT (MIG) – 2005/06 AND 2006/07 FINANCIAL YEARS Presentation to the Select Committee On Finance.
6/3/11 1 DEPARTMENT OF WATER AFFAIRS “Progress in the Accelerated Community Infrastructure Programme (ACIP)” Briefing to the Select Committee on Land and.
Performance of the Integrated National Electrification Programme as at 30 June 2008 (4 rd Quarter) Presentation to the Select Committee on Finance 14 August.
Parliamentary submission on the eradication of the Bucket Toilet System 22 & 23 February 2007 Cllr. Derrick Ndlovu.
1 MANAGING MAJOR INFRASTRUCTURE DEVELOPMENT: LESSONS ON COMPETITIVE RIVALRY IMPACT OF THE CONSTRUCTION CARTEL ON MUNICIPALITIES AND MANAGEMENT.
Drought Update to EXCO 08 March Learning from the Hazelmere experience This is a continuation of the effects of the drought. Lessons learnt must.
@ContentsExecutive Summary Annexures A M A J U B A Umkhandlu Wesifunda District Municipality Distrik
WATER DEMAND MANAGEMENT INITIATIVES RETROFITTING OF HOUSES.
Presentation to the Portfolio Committee on Energy
4/14/2018.
REPORT ON URBAN SETTLEMENTS DEVELOPMENT GRANT
PRESENTATION TO THE TRANSPORT PORTFOLIO COMMITTEE BUS SUBSIDY BUDGET SHORTFALL 2008/09 03 FEBRUARY
Overview of the CoJ Water & Sanitation Master Plan
Briefing on Current Expenditure and their Performance Trends
Presentation to the Portfolio Committee: Water & Environment
Trevor Balzer: Acting CFO Helgard Muller : CD Water Services
SALGA Comments on LG Grants Division of Revenue Bill, 2011
On-Site Leak Repair Dumisani Gubuza (M.Sc., M.Eng., Pr.Sci.Nat.)
Urban Settlements Development Grant 2nd and 3rd Quarter Exp of 2016
Presentation by Department: Water Affairs 22 March 2011
Water Quality and Water Security towards a joint action plan to continue to improve the quality of life of SA’s people through improved water quality.
Recognising and managing the key challenges in water service delivery
Cape Town Water Outlook 2018
WASTEWATER MANAGEMENT 19 September 2018
PROGRAMME 3 WATER SERVICES
Overview: 2008/2009 Annual report
Water & Environmental Affairs
City of Sunrise Wastewater Reuse Program
Progress on the Bucket Eradication Programme
Gauteng Department of Local Government
WATER & WASTEWATER PUNJAB, PAKISTAN
Select Committee on Land and Environmental Affairs
Presentation transcript:

1 Presentation to the Portfolio Committee: Water & Environment Presentation by Mr Trevor Balzer Programme Manager: Special Projects 16 – 17 March 2010 Accelerated Community Infrastructure Programme (ACIP)

2 Contents 1.Introduction 2.Budget 3.Community Infrastructure 5.Water Conservation and Demand Management a.Vaal River System b.City of Jo’Burg c.eThekwini Metro d.Nelson Mandela Bay Metro e.City of Cape Town 5.Refurbishment of Waste Water Treatment Works 6.Drought Intervention Eastern Cape

3 Introduction Accelerated Community Infrastructure Programme – Rapid intervention programme to accelerate the achievement of universal access to water and sanitation services by 2014 with a focus on 3 areas Community infrastructure Water conservation and demand management Waste water infrastructure and refurbishment – Drought Intervention: Eastern Cape – Budget R500 million over two financial years

4 Budget 2009/10 to 2011/12 The initial budget for the 2009/10 financial year was expected to be R500 million, however the budget for the project is being made available over two financial years: 2009/10: R240 million; and 2010/11: R260 million. Projects are being scheduled in such a way that all expenditure will take place during the 2009/10 Municipal Financial year. Therefore funds set aside by DWA will be expended by 30 June 2010.

5 Community Infrastructure Water and Sanitation projects selected and ranked on the basis of Exposure to the impacts of cholera; high water services backlogs (typically where between 50% and 100% of households were not served); Evidence presented where the current budgets would not allow for the eradication of backlogs by 2014; and Projects with special needs. Budget allocation: Water Supply (14 projects): R100 million Household Sanitation (13 Projects): R100 million

6 Water Conservation and Demand Management (WC/WDM) The following criteria was used to identify possible projects: Funds to be utilised to leverage additional funds from the beneficiary Metros; Projects should have high impact and substantial water savings should be achieved; Areas must already be identified as water stressed catchments; Higher levels of water security to support expected economic growth by increasing water use efficiency; An increase in water consumption based on high expected growth rates; Potential for water restrictions; Potential for WC/WDM has been identified or it is the primary option to prevent water shortages and targets have been set; and Capability of Municipalities to immediately implement the projects.

7 Water Conservation and Demand Management (WC/WDM) Budget Allocation (Total Budget R254 million: of which R100 million from DWA and R154 million from Metro’s) Vaal River system, illegal water use: R17 million City of Jo’burg, R110,5 million (R76.5 million from CoJ and R33 million from DWA) Ethekwini, R27.5 million (R10 million from EMC and R17.5 million from DWA) Nelson Mandela Bay, R36.9 million (R21.9 million from NMBM and R15 million from DWA) City of Cape Town, R62.1 Million ( R44.6 million from CCT and R17.5 million from DWA)

8 WC/WDM : Vaal River System Vaal River system, illegal water use project will cover the following main areas: Validation and Verification on the Lower Vaal River (Northern Cape); Validation and Verification on the Middle Vaal River (Free State); Investigations and Legal Support (mostly Gauteng ); Training; Communication of Compliance, Monitoring and Enforcement; Programme Management and Coordination ( NC, FS & Gauteng

9 WC/WDM: City of Jo’Burg City of Jo’burg, R110.5 million Pressure management, Active leakage control; and Repair and retrofitting of water efficient devices at schools, public buildings and households. Potential accumulated water savings: 51.5 Ml/day

10 WC/WDM: eThekwini Metro Council Ethekwini Metro Council, R27.5 million Pressure management; Active leak detection and repairs; Advanced pressure control; Mains replacement; and Improving billing by regularising connections. Potential accumulated water savings: 24 Ml/day:

11 WC/WDM: Nelson Mandela Bay Metro Nelson Mandela Bay, R21.9 million Residential, commercial and industrial metering replacement; Sector Billing and zone management; Pressure management; and Retrofitting of water inefficient devices. Potential accumulated water savings: 20.4 Ml/day:

12 WC/WDM: City of Cape Town City of Cape Town, R62.1 million Integrated water leak detection (reduction of leaks on private properties); Pressure management (reducing pressure in pipelines to reduce bulk infrastructure leaks and pipe bursts); Electronic monitoring of network to actively manage the water network; and Re-use of treated sewage effluent (off-setting the use of potable water by further treatment and distribution of treated effluent to end users). Potential accumulated water savings: 51.5 Ml/day:

13 Refurbishment of Waste Water Treatment Works The following criteria was used to identify projects: Cholera risk areas; Facilities exceeding the effluent quality limits; Failures exceeding the maximum hydraulic capacity; Non-compliance with minimum skill requirements; High profile areas prone to spillages; Significant threats to Public Health; and Mechanical failures. Budget Allocation R195 million (20 projects)

14 Drought Intervention: Eastern Cape Following Minister’s Eastern Cape Provincial Water Indaba a number of additional projects were identified, needing urgent intervention. Funds reserved from Programme management and Contingencies were re-allocated for the following projects: 1050 Rain Water Tanks in 6 DM’s: R5 million 40 Rain Water Tanks in Adelaide: R0,2 million Ground water exploration in Amatola DM: R2 million. Budget Allocation R7.2 million