Bob Travica MIS 2000 Class 12 Group Processes and Group Support Systems Updated Feb. 2014.

Slides:



Advertisements
Similar presentations
Project L.O.F.T. Report May 2007 through October 2007 Creating a design to meet stakeholder desires and dissolve our current set of interacting problems.
Advertisements

NPA: Business Improvement Techniques Contributing to Effective Team Working.
PROCESS FRAMEWORK Lecture - 3. Topics covered PROCESS FRAMEWORK PROCESS MODELS DIFFERENCE.
MIS 2000 Class 20 System Development Process Updated 2014.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
Bob Travica MIS 2000 Class 9 Operations and Information Systems Updated Jan
Lead Black Slide. © 2001 Business & Information Systems 2/e2 Chapter 9 Group Collaboration.
6150 Management of Information Systems and Technology Class 3 Systems Support to Work Groups Asper School of Business Information Age Organizations.
Chapter Lead Black Slide Powered by DeSiaMore Powered by DeSiaMore.
Decision Making Tools for Strategic Planning 2014 Nonprofit Capacity Conference Margo Bailey, PhD April 21, 2014 Clarify your strategic plan hierarchy.
MIS 2000 Instructor: Bob Travica Class 7 Process View of Organization and Information Systems Updated: January 2015.
Chapter Learning Objectives
FROM DIALOGUE TO SYNERGY: BUILDING COLLABORATIVE RELATIONSHIPS Janet Salmons, Ph.D.
Foundations of Team Leadership
McGraw-Hill/Irwin Copyright © 2008, The McGraw-Hill Companies, Inc. All rights reserved.
Modern Systems Analysis and Design Third Edition
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project 3.1 Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
McGraw-Hill/Irwin Copyright © 2008, The McGraw-Hill Companies, Inc. All rights reserved. Electronic Business Systems Chapter 7.
Copyright 2002 Prentice-Hall, Inc. Chapter 1 The Systems Development Environment 1.1 Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
9.614 Information Age Organizations Instructor: Bob Travica Class 4 Groupware (Chapter 13) Asper School of Business Information Age Organizations.
Fundamental System Concepts Asper School of Business University of Manitoba Systems Analysis & Design Instructor: Bob Travica Updated: September 2014.
Making business case for IS Asper School of Business University of Manitoba Systems Analysis & Design Instructor: Bob Travica Updated: September 2014.
Organizational Influences and Life Cycle
Bob Travica MIS 2000 Class 11 Group Processes and Group Support Systems Updated Feb
SIPOC.
Designing Incentives and Rewards Class Session 1.
Module 1: Overview of Information System in Organizations Chapter 2: How Organizations use IS.
1 Public Entities Risk Management Forum Office of the Accountant General National Treasury Project Risk Management Jeets Hargovan Government Technical.
MIS 2000 Class 9 Process View of Organization and Information Systems Updated: Jan
Release & Deployment ITIL Version 3
Effective Methods for Software and Systems Integration
Global Software Teams. Sources – Handout Readings  Carmel “Global Software Teams”  Alexander “Virtual Teams Going Global”  Geber “Virtual Teams” 
MIS 2000 Information Systems for Management Section A01, Bob Travica Introduction to Course Updated: May 2015.
 A project is “a unique endeavor to produce a set of deliverables within clearly specified time, cost and quality constraints”
MIS 2000 Class 11 Knowledge Processes & Knowledge Work Systems.
Managing Projects using Oracle Project Management (PJT) & SPREADSHEETS Neeraj Garg Vice President, Client Services.
Copyright 2002 Prentice-Hall, Inc. Chapter 1 The Systems Development Environment 1.1 Modern Systems Analysis and Design.
Bob Travica MIS 2000 Bob Travica Class 5 More on Data Analysis Updated Jan
MIS 2000 Class 5 Process View of Organization and Information Systems Updated: September 2012.
MIS 2000 Organizations and Information Systems – Impact on Organizational Design (slightly revised, see outline)
Resources Performance time. resources Performance time 2.
System Establishing Your Management Reporting System.
1 Project Management Introduction. 2 Chap 1 What is the impact? 1994: 16% of IT projects completed “On-Time” 2004 : 29% of IT projects “On- Time” 53%
Software Engineering Saeed Akhtar The University of Lahore Lecture 8 Originally shared for: mashhoood.webs.com.
7-1 Project Management from Simple to Complex. 7-2 This work is licensed under the Creative Commons Attribution-Noncommercial-Share Alike 3.0 Unported.
Team Communication and Difficult Conversations Chapter 3.
Teambuilding For Supervisors. © Business & Legal Reports, Inc Session Objectives You will be able to: Recognize the value of team efforts Identify.
Understanding Groups & Teams Ch 15. Understanding Groups Group Two or more interacting and interdependent individuals who come together to achieve particular.
Bob Travica MIS 2000 Class 9 Group Processes and Group Support Systems Updated: 7 October 2012.
Virtual Business Virtual Communication Copyright © Texas Education Agency, All rights reserved.
District Leadership Module Preview This PowerPoint provides a sample of the District Leadership Module PowerPoint. The actual Overview PowerPoint is 73.
Make Your Mark.. Paul Cannon Technical Specialist, Office Enterprise Groove and OneNote: Extending Collaboration with Office Enterprise OFC227.
© BLR ® —Business & Legal Resources 1408 Teambuilding for All Employees.
Introduction Complex and large SW. SW crises Expensive HW. Custom SW. Batch execution Structured programming Product SW.
TEAM BUILDING Operating Tactics. “ None of us is as smart as all of us ” THE KEY Cooperative & Synchronized work by a team produces remarkable results.
InLoox PM Product Presentation Slide 1 InLoox PM Product Presentation © InLoox, Inc. InLoox PM 8 for Outlook Product Presentation The Project.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 2 Diploma of Project Management.
6 Class 6 Organization in Process View MIS 2000 Information Systems for Management Bob Travica Updated Jan
The Project Management Process Groups
Driving to Results: Key Changes and Leadership Behaviors: Management Systems to Deploy & Sustain the Improvements David Munch M.D. IHI Faculty Chief Clinical.
GroupRocket.net. Years back checking s in the morning was the first ever thing most of the professionals would start their day with. And with the.
Jitasa Overview.
Group Decision Support Systems
Project Management Processes
Teams and Communication
9/18/2018 Department of Software Engineering and IT Engineering
Chapter 7 Electronic Business Systems
Project Management Processes
Chapter 7 Electronic Business Systems
Presentation transcript:

Bob Travica MIS 2000 Class 12 Group Processes and Group Support Systems Updated Feb. 2014

Bob Travica Outline Workgroup (Team) Concepts Project Team Group Support Systems (Types, examples) Team-Based Organization (case of Protegra) Distributed Teams Summary 2 of 11

Bob Travica Workgroup Concepts Workgroup or team: - Collection of people working together on a specific task for a defined period of time. - Team is an organization in small with a shorter life span. - An organization can be team-based (e.g., Protegra; slide 8). -Task: What needs to be done -Work roles: Who does what -Timeline: Start and end point, landmarks, schedule Key aspects: More… 3 of 11

Bob Travica - Success conditions: member composition, communication, leadership -Group could do more than an individual – synergy -But there may be problems in teamwork: -some members do not put in their part (free ride) -members accept mainstream thinking without reasoning (groupthink) -Team types based on location: same location (collocated team) vs. different (distributed team) - Members depend directly on each other – interdependence: can be sequential, parallel, reciprocal. 4 of 11

Bob Travica Project Team Project Team (PT) is a kind of team that performs in fundamental production processes (see case later). PT has a key role in project-driven organizations (research, marketing, construction, public accounting, software development) PT has lots of autonomy as it manages work, money, time. PT disbands when project ends. 5 of 11

Bob Travica Team life cycle A set of complex activities (phases) from team formation to team’s delivery of product and disbanding. Each complex activity is a process in itself: 1. Set team task  Define goals and timeline  Allocate budget  Select members 2. Align on mission  Define roles  Establish leadership 3. Create project documentation (charter, plans, timelines)  Make appointments  Set communication means 6 of 13 More Developing/Using Group Mind 1. Forming 3. Norming4. Performing 5. Disbanding 2. Storming Focus for IS

Bob Travica Team life cycle (cont.) 4. Execute project tasks  Socialize  Deliver product - Execute project activities: a sub-process of connected work activities that are constrained by a precise timeline and budget allowances. * 5. Create final reports  Reflect on & Record experiences  Close Project Developing/Using Group Mind 1. Forming 2. Storming 3. Norming4. Performing 5. Disbanding Focus for IS 7 of 13

Bob Travica Group Support Systems Support the Performing phase (process) in the team life cycle. 1.Project Management Systems (PMS): Protegra – see slides; PMS covers: activities, people, time, financials (tracking work hours, expenses), management of versions of developed software, and sharing of project documentation. A team project is planned as a process that consists of tasks. Tasks employ team members, and area executed in time. Costs are incurred for people and material resources used in tasks. 8 of 11 Task Employee Project Account has employs contains allocated to Resource deploys Data diagram for project plan More…

Bob Travica 9 of 13 Activity Time People John Jean Money: Hourly rate is entered in a separate sheet for each person, and the system multiplies it by planned time entered in this sheet. With the progress function, the budget balance is tracked. PMS generates many reports automatically. John Jean, Alex Alex Output from PMS showing plan and possibly execution of project. This output can be presented as the standard process diagram. More…

Bob Travica 10 of 13 –Boeing-Rocketdyne - Internet Notebook PMS Project: Developing an economical type of rocket engine in 10 months Distributed team made of engineers from Boeing and two partners; Very successful outcome: new engine design, much simpler and cheaper to make; project under budget. GSS supporting the team: Internet Notebook (repository of design documentation with online access via laptops, notifications on project progress, hypertext links on useful learning sources). Functions that required more time & effort were used less - documenting new knowledge and indexing the documents. This outcomes ran against managers’ expectations. Project Document Linked learning source Rocket Engine Project created in tracked via supported by

Bob Travica 2. File Sharing (e.g., Google docs, university class support systems; used also in PMS and in knowledge management processes)File Sharing 3. Application Sharing (sharing screen and programs; figure below); engineers and other professionals using visual expression.Application Sharing 11 of 13 Group Support Systems

Bob Travica 4. Workflow Support Systems * 5. Communication for collaboration and knowledge sharing (e.g., private , el. bulletin boards, chat) 6. Group Decision Support System (group brainstorming and option selection via GDSS; fig. below). Used extensively at IBM. ** NOTE: This system also belongs to decision making systems. Facilitator – stirs the session Decision makers – team or ad-hoc group Group Support Systems 12 of 13

Bob Travica Team-Based Organization Team-Based Organization is one in which project team is the basic unit. In contrast, in other types of organization the basic unit is department. Research organizations, public accounting, consulting, software. Company Protegra – Winnipeg-based, consulting on management and IS (software creation).* Project team at Protegra has 3-5 members. Team roles** are divided but key decisions are made collectively. This is part of Protegra’s culture. Other cultural beliefs and behaviors: professionalism, fair contribution to project work, open communication, knowledge sharing, respect for others. More 13 of 13

Bob Travica Challenges for distributed teams: o Aligning workflows over space & time; IS for communication and work support are necessary o Following same values and norms o Maintaining trust in others and their work o Time synchronization o Effective communication; should be approached as process at detailed level (timing, turn taking, checks, effectiveness for all involved – many customers); selection of channels should fit task (systems-supported vs. face-to-face) Distributed Teams* 14 of 13

Bob Travica Summary Workgroup (Team) is a Collection of people working together on a specific task for a defined period. Some key aspects for teams: interdependence, synergy, composition, communication, leadership. Project team plays key role in project-driven organizations. Team life cycle is a process that consists of five sub-processes. GSS include project management system, file sharing, applications sharing, workflow system, communication systems & Group Decision Support System. Team-based organization is one in which project team is the basic unit (differentiate from org. using team as a work method). Culture and systems support crucial. In a distributed (“virtual”) team members work at different locations. To align distributed team's workflows over space and time, culture and communication processes & systems are crucial. 15 of 13