BPM System Status P. Cameron 13 Aug 07. Outline 1.Notes from NSLS-II Design Review (last Thursday) 2.System Block Diagram 3.Process Variables 4.DAQ status.

Slides:



Advertisements
Similar presentations
Orbit Feedback NSLS-II stability workshop Visitor committee April 20, 2007.
Advertisements

Stephanie Allison LCLS Event System 14 June LCLS Event System Outline HW Block Diagram Timing Requirements Time Lines EVG.
Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
Mark Heron Diamond Light Source Oct 2007 EPICS EPICS Interface to the Libera Electron Beam Position Monitor.
BEPCII RF POWER SYSTEM RF group, IHEP Sep ~ April 1.The 1 st transmitter had finished installing,commissioning and SAT (Site Acceptance Test).
Working group report T500 and E203 Armin Reichold 30/08/2011 A Reichold, for SP group, FACET User Meeting, SLAC 1.
S. Smith LCLS Facility Advisory April 16, BPMs and Toroids Facility Advisory Committee April 16, 2007 System overview.
Stephanie Allison Integration with the SLC Control April 7, 2005 Introduction PNET Receiver VME Module SLC-Aware IOC Existing.
Mike Zelazny FAC April 17 th, 2007 Matlab Applications Image Management Bunch Length Measurement Feedback Software Engineers.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
Dayle Kotturi SLC April 29, 2004 Outline Motivation Key Components Status Update SLC / EPICS Timing Software Tasks Hardware.
Proton Source Workshop December 7 & 8, 2010 John Reid December 8, 2010.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Stability Workshop April , 2007 NSLS-II Electrical Systems G. Ganetis NSLS-II Electrical Systems NSLS-II.
Status & operational experience of Liberas at SSRF Leng Yongbin, Yan Yingbing, Zhou Weimin, Chen Yongzhong Ye Kairong, Yuan Renxian, Zou Yi, Yu Luyang,
Project X RD&D Plan Instrumentation Manfred Wendt AAC Meeting February 3, 2009.
ERL Differential Current System Status Peter Cameron with contributions from Michelle Wilinski and Christophe DeFrance (Bergoz) 17 Sep 07.
1 BROOKHAVEN SCIENCE ASSOCIATES LBT Diagnostics Installation Update Dan Padrazo Diagnostics & Instrumentation Group Feb 1, 2012.
1 BROOKHAVEN SCIENCE ASSOCIATES Preparations for Linac Commissioning Ray Fliller, Associate Physicist 8 th ASAC meeting for NSLS-II Project May 10-11,
Beam Stability WBS U and SPX Diagnostics WBS U Glenn Decker Group Leader APS Accelerator System Division Diagnostics DOE Lehman CD-2.
Beam Instrumentation for Orbit Stability I. Pinayev.
Characterization of Fast Orbit Feedback System Om Singh, APS, ANL NSLS-2 Beam Stability Workshop BNL, April 18-20, 2007.
Tuesday September Cambridge1 GDCC “next replacement of the LDA” Franck GASTALDI.
BEPCII Transverse Feedback System Yue Junhui IHEP , Beijing Sep 17 th, 08IMAC.
BPMs and HOM-BPMs for the XFEL Linac N. Baboi for the BPM and the HOM teams (DESY, CEA-Saclay, SLAC, FNAL, Cockroft/Daresbury) XFEL Linac Review Meeting,
Beam diagnostics control for J-PARC LINAC Guobao SHEN J-PARC Center Japan Atomic Energy Agency Mar
Group Electronique Csnsm AGATA SLOW CONTROL MEETING 19th fev AGATA PROJECT PREPROCESSING MEZZANINE SLOW CONTROL GUI FOR THE SEGMENT AND THE CORE.
1 Results from the 'S1-Global' cryomodule tests at KEK (8-cav. and DRFS operation) Shin MICHIZONO (KEK) LOLB-2 (June, 2011) Outline I. 8-cavity installation.
Stephen Schuh Vacuum Controls SCR and 16 November 2005 Vacuum Controls System Concept Review and Preliminary Design Review.
The design of HEPS digital BPM electronics BI Group, accelerator division.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
An RF & High-Speed Acquisition Systems for High-Gradient Tests at CLIC Test Facility Raquel Fandos.
Michael Borland Advanced Photon Source Using SDDS for Accelerator Commissioning and Operation Michael Borland Operations Analysis Group Advanced Photon.
G5 Beam Instrumentation D. Gassner, E. Pozdeyev 4-09.
Eric Prebys Accelerator Physics Center Program Director, LARP December 7, 2009.
Fast feedback, studies and possible collaborations Alessandro Drago INFN-LNF ILCDR07 Damping Rings R&D Meeting 5-7 March 2007.
EU Design Study Kickoff Meeting GSI U. Raich CERN AB/BDI Digital Signal Analysis for BPMs The Project –Measure beam trajectories and orbits in.
BEPCII Transverse Feedback System Yue Junhui Beam Instrumentation Group IHEP , Beijing.
Nominal Workflow = Outline of my Talk Monitor Installation HWC Procedure Documentation Manufacturing & Test Folder Instantiation – NC Handling Getting.
BIC Issues Alan Fisher PEP-II Run-4 Post-Mortem Workshop 2004 August 4–5.
Stephanie Allison SLC-Aware April 5, 2005 Introduction Description Issues Progress Plans for 2005 SLC-Aware IOC LCLS Collaboration,
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
11 th February 2008Brian Martlew EPICS for MICE Status of the MICE slow control system Brian Martlew STFC, Daresbury Laboratory.
TBPM Front-End Software Design Review L.Piccoli April
Main Injector Beam Position Monitor Upgrade: Status and Plans Rob Kutschke All Experimenters’ Meeting April 3, 2006 Beams-doc-2217-v3.
1 BROOKHAVEN SCIENCE ASSOCIATES Open-Source Distributed Deterministic Device Control Larry Doolittle Alex Ratti Bob Dalesio.
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
4. Operations and Performance M. Lonza, D. Bulfone, V. Forchi’, G. Gaio, L. Pivetta, Sincrotrone Trieste, Trieste, Italy A Fast Orbit Feedback for the.
XTCA Workshop Topic Suggestions Ray Larsen, SLAC TWEPP 2010 Workshop Aachen, Germany September 22, 2010.
Notes from Tom’s visit 1. Controls is under-staffed 2. Common Diagnostics platforms (BPM, FCT, DCCT, BLM,…) 3. Where possible, ‘Smart’ Diagnostics, running.
Estimates of required MPS reaction time In the merger (at the centers of respective 20deg dipoles and in between 2 lenses) rms R=250 um In the
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
PIP-II Beam Instrumentation Vic Scarpine PIP-II Machine Advisory Committee Meeting March 2016.
Status of CEPC Beam Instrumentation Study Ma Huizhou On behalf of CEPC BI Group Beijing, China
U. Iriso ESLS XXIII Nov Commissioning of the Bunch By Bunch Feedback System U. Iriso, J. Moldes, A. Olmos (ALBA – CELLS) M. Abbot, G. Rehm (Diamond)
SESAME TL2 and SR Diagnostics
Beam diagnostics from GSI
Working groups status report on Feedbacks
LLRF'15 Workshop, Shanghai, Nov. 4, 2015
SLC-Aware IOC LCLS Collaboration Jan 26, 2005
ILC LLRF Status Ruben Carcagno, Brian Chase
Ewald Effinger, Bernd Dehning
CesrTA Status Report Mark Palmer July 8, 2009.
P. Forck, P. Kowina, M. Schwickert, R. Singh
Controls CBETA controls will extend existing EPICS control system
Update on ALICE-LHC interfaces & BCM
LLRF and Beam-based Longitudinal Feedback Readiness
Feedback Systems Joe Grames Hall A Parity Meeting Jefferson Lab
RF Local Protection System
Status of TTF HOM Project Aug 9, 2005
Presentation transcript:

BPM System Status P. Cameron 13 Aug 07

Outline 1.Notes from NSLS-II Design Review (last Thursday) 2.System Block Diagram 3.Process Variables 4.DAQ status 5.PUE status 6.Meeting plans

Notes from NSLS-II Design Review Committee members: Marc Ross (FNAL), B.X. Yang (APS), Om Singh (APS/NSLS-II), Gunther Rehm (Diamond), Bob Hettel (SLAC) 1.Bergoz in-flange transformers have epoxy vacuum breaks, they leak, use BPM sum signal instead 2.Button design looks good, may be concern with trapped modes with high current (>100mA) and short bunches (<15psec rms) 3.Considerable discussion of Libera - presently this is NSLS-II baseline, driven by manpower, crossbar and feedbacks 4.Libera has required extensive local support from existing users (several man years at Diamond), ‘plug and play’ perception may not be realistic 5.DESY is exploring Xilinx demo board approach as Libera alternative, we are contacting them 6.At Diamond all orbit feedbacks, both slow (~0.1Hz) and fast (~100Hz) are implemented with reflected memory, no real-time EPICS involve

Suggestions for upcoming meeting agendas July 30 th – AP presentation/discussion on beam and machine modes, global naming convention, MPS reqt’s for commissioning Aug 6 th – joint AP/Diagnostics discussion on Process Variables, Diagnostics Prioritization (AP shifted emphasis to ‘system status’ discussions) Aug 13 th - Scraper/Collimator Aug 20 th – presentation and discussion of BPM status Aug 27 th – presentation and discussion of BLM status Sep 10 th – presentation and discussion of DCCT and differential current status Sep 17 th – presentation and discussion of Profile status Sep 24 th, Oct 1 st – ???? Oct 8 th – Preparation for Design Review Oct 15 th – Design Review –Committee members – at least 2 from NSLSII, maybe more? Promote collaboration with those guys –Igor Pinayev, Om Singh, Bob Dalesio, else??? Sequence???

BPM (also FCT, DCCT, BLM,…) Block Diagram

threshold?

BPM DAQ Status Two approaches under consideration: COTS Xilinx demo board We understand how to interface this board to timing and controls systems, and provide for 1 sec and abort PVs Presently available hardware requires design and fab of digitizer mezzanine (not an issue, but…) Negotiating with vendors regarding design and release of complete BPM board as demo board As suggested by review committee, discussing with DESY Presently running for Differential Current Libera Not clear how to interface this box to timing and controls systems, and provide for 1 sec and abort PVs. Hopefully this will be clarified by demo box Demo box due in at the end of the month FPGA source code (~1GB!!!) downloaded, uses old (>2 years) Xilinx tools and Linux

BPM PUE Status Buttons are in house (qty 70, 64 required presently) 4 installed on BPM block, leak-checked, measured (S- parameters, DC resistance, capacitance,…), baked to 150C (cert to 200C, known problems with all vendors at 250C), re-measured Remainder are awaiting tech time for testing and sorting Cables – RG-223 order soon? HOM probes Installed in 5 cell cavity transitions ‘soon’ (plating problem) Cables? LMR-195? BTF – use buttons (buy broadband ~5W RF amplifier?)

Suggestions for upcoming meeting agendas July 30 th – AP presentation/discussion on beam and machine modes, global naming convention, MPS reqt’s for commissioning Aug 6 th – joint AP/Diagnostics discussion on Process Variables, Diagnostics Prioritization (AP shifted emphasis to ‘system status’ discussions) Aug 13 th - Scraper/Collimator Aug 20 th – presentation and discussion of BPM status Aug 27 th – presentation and discussion of BLM status Sep 10 th – presentation and discussion of DCCT and differential current status Sep 17 th – presentation and discussion of Profile status Sep 24 th, Oct 1 st – ???? Oct 8 th – Preparation for Design Review Oct 15 th – Design Review –Committee members – at least 2 from NSLSII, maybe more? Promote collaboration with those guys –Igor Pinayev, Om Singh, Bob Dalesio, else??? Sequence???