Paper # LOS ANGELES COUNTY PRIORITIZATION OF SEWER REHABILITATION PROJECTS Fernando Villaluna, P.E. 1.

Slides:



Advertisements
Similar presentations
ENHANCING LEVEL OF SERVICE THROUGH RISK-BASED ASSET MANAGEMENT Greg Norby, P.E. General Manager Vivian Housen, P.E. Principal, VWHA Northern California.
Advertisements

11 Grant Park Sewer Rehabilitation Project BES Project #E10346 Bid # SCOPE: Rehabilitation, Replacement, or Relocation of Sanitary & Combined Sewers,
CMOM CMOM Capacity, Management, Operation & Maintenance and Remote Wireless Monitoring of Collection Systems 5 th Annual FVOA Mini Conference August 18,
Steve White Urban Water Council US Conference of Mayors
INFORMATION on RATE increase On May 6, 2008, the Clark County Water Reclamation District Board of Trustees approved a rate increase at a public hearing.
Alex Churchill.  What is the Problem?  Sewer Line Inspection Methods  Acoustic Inspection Technology  Case Study  Summary WWETT
Utah Pollutant Discharge Elimination System (UPDES) Utah Sewer Management Program (USMP)
City of Berea North End Area Sewer Investigation Project- Phase I Commencing Fall 2011.
Evaluation of Private Property I/I Sources for Sanitary Sewer Evaluation Study City of Grand Rapids – E. Leonard Heights Area Presenter: Jay Zawacki, CDM.
1 Collection System And Wastewater Treatment Plant Sewer Update
Department Of Public Works Environmental Engineering Section Inflow and Infiltration (I/I) Demonstration Project Sanitary Sewer Lateral Lining 1 City of.
MSD Pipe Rating Program AQUA SALUBRIS
Cuba’s Future Development Needs, Funding Models, and Alternatives. A Perspective of the Operation of a Cuban Water & Sewer Utility. Eduardo Vega-Llort,
FISCAL YEAR BUDGET MONROE METROPOLITAN POLLUTION CONTROL SYSTEM BUDGET 1 Presented by Barry S. LaRoy, P.E. Director of Water & Wastewater Utilities.
Professional Sewer Line Cleaning Services Tel:(914)
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
McElroy Mechanical & Environmental Services Presents CCTV Inspection A high-tech solution for the inspection of and/or viewing of entire sections of existing.
Pavement Management Program Overview February 10, 2015 Presented By: Christopher J. Ott, E.I.
Public Information Meeting #6 City of Fargo Flood Risk Reduction Projects Rose Creek Coulee October 9, 2012.
Public Works Jack Petkus, Director Informational Overview.
The City of North Bend Sanitary Sewer System
Gwinnett County’s Post Development Stormwater Management Program
Overview of Key Rule Features
April 10, 2002 Jon KreischerCVEN GIS Identifying Critical Sewer Lines.
1 By: Dan Scherer, Assistant Superintendent of Water & Sewer.
1 Innovative Use of Administrative Order Authority Management, Operation and Maintenance (MOM) Program.
MONROE METROPOLITAN POLLUTION CONTROL SYSTEM BUDGET 1 FISCAL YEAR BUDGET Presented by Barry S. LaRoy, P.E. Director of Water & Wastewater Utilities.
ANNUAL REPORT Monitoring Reports 2010 Monitoring Reports 2010  Every month SSD is required to send a monitoring data report to the State Water.
SSES and GIS, A Great Partnership Cindy Fort, PE Technical Director Environmental Engineering and Jeff McCann GIS Coordinator.
Using Your Own Resources, or CSI City Sewer Investigation.
Wastewater Management
Office of Facilities Deferred Maintenance UTSA Strategic Resource Planning Council Deferred Maintenance UTSA Strategic Resource Planning Council March.
1 Underground Asset Management Jonathan Mongie. 2 Asset Management ► Improved Asset Condition l Increased System Efficiency ► Prolonged Asset Life l Reduced.
Annexation Issues in Eden A History of Annexation in Eden Since 1968 NC Annexation History Current Annexation Issues in Eden January 2010.
Separating Inflow Reduction From Infiltration Removal Using Simple Tools Frederick Bloetscher, PhD, PE Florida Atlantic University.
METRO WASTEWATER RECLAMATION DISTRICT CAPITAL IMPROVEMENTS PROGRAM
Circuit Rider Training Program (CRTP) Circuit Rider Professional Association Annual General Meeting and Conference August 30, 2012.
Olathe PWPES Current Survey Methodology and Practices.
WVSD SANITARY SEWER REHABILITATION PROGRAM 2006 Sewer Smart Summit Presented by Peter V. Sevcik, P.E. West Valley Sanitation District Campbell, California.
1 Public Hearing User Rate Adjustments April 8, 2008.
ANNUAL REPORT Monitoring Reports 2011 Monitoring Reports 2011  Every month SSD is required to send a monitoring data report to the State Water.
NC AWWA-WEA 95th Annual Conference
Digital Innovation and Data Integration Key to Successfully Managing Charlotte’s Sewer Rehab Program Aaron Frazier - Frazier Engineering Keith Shirley.
March 3, 2016 Discovery Sewer/RWQCB LSM Vallecitos Water District Regional Water Quality Control Board (RWQCB) Lake San Marcos February 10, 2010.
Town of Oro Valley Oro Valley Stormwater Utility Commission Overview.
Water System Master Plan & Rate Study City of DeKalb, Illinois City Council Presentation May 16, 2015.
September 28, 2015 PUBLIC WORKS 101. sandyspringsga.gov Adopted City Priorities – FY
Sanitary Sewer Fee Study March 4, Summary Sausalito’s 75-year-old sewer system is old and deteriorated. While the current rates have allowed the.
City of McCall Sanitary Sewer I&I Study Community Stewardship for Economic Benefits Nathan Stewart, PE, City Engineer Matt Neukom, PE, Project Manager.
Detroit 0% Interest Home Repair Loan Program 1 CITY OF DETROIT HOUSING & REVITALIZATION DEPARTMENT Program grant sub-recipient overseeing loan capitalization.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
Spring 2009 Town Meeting Article 41 East Framingham Sewer Improvement Project (EFSIP) May 2009 Town of Framingham Department of Public Works "Preserving.
PUBLIC WORKS FY 2012 Proposed Budget May 24, 2012.
SOUTH LAGUNA TUNNEL STABILIZATION & SEWER PIPELINE REPLACEMENT PROJECT Providing Quality Water & Wastewater Services To the Coastal Communities.
City of Sausalito Sewer CIP Vivian Housen, P.E. V. W. Housen & Associates March 25, 2015.
Author name here for Edited books chapter 9 Facility Maintenance 9 chapter.
CITY OF BELLEVILLE ROAD IMPROVEMENTS PROGRAM
I/I Reduction Efforts EBMUD and the Satellite Agencies
City of Orinda 2017 Annual and Measure J &L Pavement Rehabilitation Projects City Projects No & 4115.
Week 3, March 13, 2017.
PACP® Based Asset Management
Separating Inflow Reduction and Infiltration Removal
Rehabilitation Program impact on Sewer Management
Town of Dunn Sanitary District No. 3
Key Performance Indicators
Quality Assurance For Trenchless Pipeline Rehabilitation
DTE Gas Company Leak Management Plan
City of Greater Sudbury Lining Program Overview. Brittany Hallam, P
MS4 OVERVIEW 2015.
Sidewalk Maintenance Program
Presentation transcript:

Paper # LOS ANGELES COUNTY PRIORITIZATION OF SEWER REHABILITATION PROJECTS Fernando Villaluna, P.E. 1

Paper # O VERVIEW Los Angeles County Sanitary Sewer System Condition Assessment Program Program Methodology Program Results Questions 2

Paper # LOS ANGELES COUNTY W ASTEWATER S YSTEM O VERVIEW 3

Paper # SYSTEM OVERVIEW L OS A NGELES C OUNTY C ONSOLIDATED S EWER M AINTENANCE D ISTRICT (D ISTRICT ) Comprises of 38 contract cities unincorporated communities Serves over 2.5 million people Collection System 4,600 miles of gravity sewer lines Over 90% 8” VCP 4

Paper # S ANITARY S EWER C ONDITION A SSESSMENT P ROGRAM 5

Paper # GOAL To reduce the number of Sanitary Sewer Overflows 6

Paper # P ROGRAM O BJECTIVES Conduct Closed-Circuit Television (CCTV) inspection Identify maintenance issues Determine structural intregrity Analyze data for benchmarking 7

Paper # P ROGRAM M ETHODOLOGY 8

Paper # P ROGRAM C YCLE 9 Conduct CCTV INSPECTION ANALYZE inspection data Distribute MAINTENANCE REPORTS to field crews to enhance current routine maintenance activities Identify & repair critical STRUCTURAL DEFECTS Provide collection system owners with a REPORT of the condition of their sewer collection system DATA MANAGEMENT and Integration into map-based application for historical comparisons & benchmarking Continuously repeating cycle

Paper # I NSPECTION P ROCESS Light Cleaning vs. Complete Cleaning CCTV Inspection Data Collection 10

Paper # D ATA R EVIEW Conducted by in-house Engineering Staff Verify upon receipt of data All segments were inspected Inspections were conducted using PACP Data is properly formatted 11

Paper # R EPORTS Provide a summary of overall health and condition of system Include maps and tables Highlight maintenance and structural issues 12

Paper # W HAT TO REPAIR OR MAINTAIN ? Utilize PACP Ratings Structural and Maintenance Prioritize the highest rated segments 13

Paper # M AINTENANCE R ATINGS 14 Due to continued deterioration, MAINTENANCE issues with a Grade 3 may be a problem in the next 10 years PACP Rating Descriptions GradeDescription of Defect Grades 1:Minor 2:Minor to Moderate 3:Moderate 4:Significant 5:Most Significant

Paper # M AINTENANCE S UMMARY 15 PACP SCORE # SEGMENTS% 116, , , , % 10.12%

Paper # P UBLIC E DUCATION Lateral connections with excessive roots, grease or other defects Homeowners are notified to maintain their connections 16

Paper # S TRUCTURAL R ATINGS 17 Segments with STRUCTURAL Grades of 4 and 5 will most likely be an issue in the next 10 years PACP Rating Descriptions GradeDescription of Defect Grades 1:Minor 2:Minor to Moderate 3:Moderate 4:Significant 5:Most Significant

Paper # S TRUCTURAL S UMMARY % PACP SCORE # SEGMENTS% 136, , , , ,

Paper # R EHABILITATION B UDGET Annual fee of $5/sewage unit District rehabilitation budget: $3.81 million Design, advertising, project management, construction Emergency Sewer Repair Program $950,000/year for as-needed emergency contractor repairs 19

Paper # P RIORITIZING R EPAIRS Emergency / Immediate Repairs Collapsed / blocked pipe Defect at invert / evidence of voids around defects Near watercourse or public facility High volume of flow / high risk Capital Improvement Repairs Breaks / fractures above the flow line Partially obstructed flow Easement / local street location Moderate volume of flow Monitor defects Cracks / minor fractures Unobstructed flow 20

Paper # E MERGENCY R EPAIRS Traditional open-trench repairs (typical) Time and Materials Costs range $12k – $25k Construction 3-5 days 21

Paper # R EPAIRS BY D ISTRICT F ORCES Low risk of collapse Scheduled repair Residential / local streets or easements Approximate cost: $10k Completed between 2-3 days 22

Paper # T RENCHLESS L INING P ROJECTS Moderate deficiencies Multiple breaks / fractures along sewer pipe Minimum obstacles along pipe from manhole to manhole Approximate construction cost: $22/foot Completed between 6-8 hours 23

Paper # P IPE B URSTING Replacement of 83-year old concrete sewer Deterioration from age and H 2 S exposure Limited access due to easement location and overbuild One hour for pipe bursting Two weeks prior to expose lateral connections 24

Paper # RESULTS 25

Paper # R ESULTS Inspected over 3,000 miles of sewers to date Produced over 3,500 maintenance work orders Completed 65 Emergency Structural Repairs District Crews completed over 50 repairs Rehabilitated 120 miles of concrete pipes Lined over 21 miles of pipe from CCTV projects 26

Paper # R EDUCTION IN O VERFLOWS 27

Paper # B ENEFITS R EALIZED Enhanced service to the community Lessen impact on public health, safety and the environment Reductions in Emergency overtime Service requests Claims Increased productivity Increased life expectancy of our collection system 28