734073 Bridge Abutment Repair Old King’s Road. 734073 Location; Old King’s Road N 734063.

Slides:



Advertisements
Similar presentations
Presentation by: LT Environmental, Inc.. Why Stormwater Matters Water is a precious resource that must be protected. Flood-defensive measures will protect.
Advertisements

1 M-150 / Botts Rd Interchange MoDOT Project No. J4P2251 Pre-Bid Meeting June 24 th, 2010.
CONSTRUCTION DEFECT RECOVERY FROM SURETY: THE SINKING BUILDING TALE PRESENTATION AT DES CLIENT WORKSHOP OCTOBER 8, 2014 BOB BOURG, DES CLAIMS AND DISPUTES.
Summary of Conceptual Design Site 3 Causeway Landfill Culvert Stabilization Marine Corps Recruit Depot Parris Island (CTO JM38) 19 August 2014.
Duane Hill, District Engineer
CONSTRUCTION OF SOIL NAILING WALLS
Public Information Meeting #6 City of Fargo Flood Risk Reduction Projects Rose Creek Coulee October 9, 2012.
1 Armour Ranch Road Bridge Emergency Repairs SB County Project Number 01STRM R015 Storm Damage caused during March 5 th 2001 storm.
CRITICAL REPAIR OF KALAUPAPA DOCK STRUCTURES: HONORING THE PAST, PROTECTING THE FUTURE.
CONSTRUCTION BEST MANAGEMENT PRACTICES (BMPs) CONSTRUCTION GUIDE TO CLEANER WATER Information compliments of: WaterWorks! WaterWorks! Center for Environmental.
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
Section Two Collapsing slopes. What is a landslide? soil layer rock layer wet soil Landslide takes place when large masses of loose rocks and soil move.
Preservation and Protection of Covered Bridges Frederick County, Maryland Division of Public Works.
CE 486 DEEP COMPACTION Name : Ali Hamood Al-teeb. ID :
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN DESIGN APPROACH- THE BASICS Issued May 2009.
GABION PRESENTATION.
1Furmanite Confidential - 1/9/04 Motor and Pump Base Foundational Repair.
The sand filter has to be moved from this location. The embankment cross section used in the slope stability analysis did not include the sand filter.
Chapter 29 Landscaping.
Grindstone Seepage Mitigation Project Village of Ruidoso Ed Toms 2105 NMWDOC Spring Workshop May 12, 2015.
Pre-Disaster Contracts, Evaluation, Estimating and Reconstruction.
Module V Final Wrap-Up ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control (SC) III Tracking, Wind Erosion, and Construction.
Module 7: Construction Phase
Deterioration of CMP: Abrasion and Erosion caused by years of water and debris flowing through the pipe Deterioration of CMP: Abrasion and Erosion caused.
*Who We Are* *What We Do* *Why You Should Use CMP Repair* *What Can You Expect*
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee.
Chapter 2: Landforms of Georgia Lesson 4: How Do Humans Change Landforms? S5E1c: Students will relate the role of technology and human intervention in.
1 Pavement Lifting & Soil Stabilization Control SOIL STABILIZATION, LIFTING OF PAVEMENT STRUCTURES AND UNDERGROUND INFRASTRUCTURE REPAIRS USING DEEP INJECTION.
Informational Meeting. The mortar joints have started to break down and shift Minor re-pointing was done in 2001, major re-pointing in 1985, work prior.
Riverside County Flood Control and Water Conservation District Murrieta Creek Flood Control, Environmental Restoration and Recreation Project June 2006.
Trees protect the earth’s surface because… they act as a shield against the wind.
Glendale Creek Restoration. Restoration Goals Ensure long-term stability of road and stream Manage excess gravel and debris Provide habitat/fish passage.
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
MO’OMOMI NATIVE PLANTS U.S. Fish and Wildlife Service Pacific American Foundation Hui Malama o Mo’omomi.
Basic Hydraulics: Bridges. Definition & terminology Abutments Flow contraction.
C-4 Canal Bank Improvements Belen Phase 2 Flood Protection Berm & Wall John Mitnik, P.E. Engineering & Construction Bureau Chief John Mitnik, P.E. Engineering.
Northeast Corridor Greenway Acquisition Project – Design and Permitting Status Update City Council Workshop August 25, 2015.
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Culvert Maintenance CULVERT MAINTENANCE.
Fully-grouted repair, ready for Diamond Grinding.
Polepick DNR Salvage Sale. Polepick debris flows and flooding Waypoint 120.
Lift Station No. 1 and 2 Force Main Replacement Ronald Wastewater District Summer 2015.
Earth’s Surface Changes Processes
Nonfarm Erosion Control
Soil Conservation. Soil conservation means protecting soils from erosion and nutrient loss. Soil conservation can help to keep soils fertile and healthy.
Engineering Presentation. Basic Soil Mechanics Soil type classification Gravel, sand, silt, clay Soil strength classification Granular soils (sand and.
Boscastle Floods, 16 th August Boscastle Floods, 16 th August 2004 – Causes:  Over 70mm of rain fell in just two hours  The ground was already.
Forestry. Harvesting processes Harvesting processEase of loggingCostEcological protection Clear cuttingVery easy – area can be cut with machines and logs.
KY FEMA DEBRIS DOCUMENTATION Ice Storm extent.
CONREPNET Performance based rehabilitation of reinforced concrete structures Members workshop – London – 24 & 25 April 2006 CE marking of concrete repair.
Building Committee Presentation March 03, MAIN ENTRANCE.
Chapter 3 Managing Earth’s Changes
Facilities Services Department Meeting August 2016.
CONTRACTING FOR LOCAL MAINTENANCE
Culvert Maintenance Similar to bridges Structurally different
City of San Jacinto 7th Street Pavement Repairs
Replacement of excess Pavement at SMO runway ends
Christopher R. Bennett Darejan Kapanadze The World Bank
Best Gutter Repair Company in Toronto
GLADSTONE 1800mm Steel culvert rehabilitation
9.4 Product Quality Control
Lehigh Canal Spoil Removal At Old King’s Road.
INDOT Storm Water Management
Chapter 5.3 Mass Movements.
Lake 16 Dam Repair Presentation
Narrows Bridge - Perth Concrete Repair Works
Protective surface finishes
PRESENTER: Paul ”Capt. Grout” Layman
Steps To Prepare Site For Site Work Construction Calhoun GA.
Access Hatch Replacement Phase 4
Access Hatch Replacement Phase III
Presentation transcript:

Bridge Abutment Repair Old King’s Road

Location; Old King’s Road N

Old King’s Road Bridge (734073) existing structure Built in 1962

September 26, 2014 Rainstorm

Fill and compact the voids as much as possible and restore the concrete flume over the damaged area … Done.

Inject a soil stabilizing chemical grout under the repair to force water out, fill all the voids that could not be reached and consolidate and bind the soil together.

Before the rain event Lehigh Canal Native Soil Fabriform Slope Protection

Erosion after the rain event Lehigh Canal Native Soil Erosion behind slope protection Fabriform Slope Protection Flume removed to repair erosion

Phase 1 Repair Lehigh Canal Native Soil Void filled with road base Fabriform Slope Protection Flume repaired

Phase 2 Repair (Chemical Grout Installed) Lehigh Canal Native Soil Chemical Grout injected into fill Fabriform Slope Protection

Uretek Holdings was selected to perform the work subject to the terms, conditions and pricing of the FDOT Contract No. BDV76, which is a statewide contract that was competitively bid. Uretek Holdings has agreed to perform the work with a not to exceed cost of $39,600 with 36,000 pounds of material.

2015 Approved Budget Budgeted$50,000 Uretek Contract$39,600 Remaining:$10,400

As soon as possible Tentative Schedule Should be a one day job and as soon as the contractor can work the project into their schedule