SPS Synchrotron Light Monitor -BSR- Status G. TRAD E. Bravin, A. Goldblatt, F. Roncarolo.

Slides:



Advertisements
Similar presentations
Observation of beam halo with corona graph
Advertisements

Short bunches in SPEAR J. Safranek for the SPEAR3 accelerator group November 2, 20101J. Safranek CLS THz Workshop.
Remote sensing in meteorology
James Welch October 30, FEL Commissioning Plans J. Welch, et. al. FEL Commissioning Plans J. Welch, et. al. Accelerator.
Two-dimensional and wide dynamic range profile monitor using OTR/fluorescence screens for diagnosing beam halo of intense proton beam Y. Hashimoto, T.
VisiTech International’ VT-iSIM Imaging Beyond all Limits
BSRT Optics Design BI Days 24 th November 2011 Aurélie Rabiller BE-BI-PM.
CCD Detectors in High- Resolution Biology Jian Guan
Berkeley workshop summary Redundancy : dual detector Field of view : 3”x6” Spectrograph length goal: < 400 mm Isostatic mount on the base plate with control.
AWAKE Electron Spectrometer Design Simon Jolly 4 th September 2012.
Matching and Synchrotron Light Diagnostics F.Roncarolo, E.Bravin, S.Burger, A.Goldblatt, G.Trad.
Profile monitors, Injection Matching monitor, BSRT & BSRA LHC OP days - 19 th of January 2010 – Evian Stephane Bart Pedersen, Andrea Boccardi, Enrico Bravin,
Electron Spectrometer Progress Report Simon Jolly 19 th October 2012.
Optics and magnetic field calculation for the Hall D Tagger Guangliang Yang Glasgow University.
9/25/031 First Tests of an Optical Transition Radiation Detector for High-Intensity Proton Beams at FNAL September 25, 2003 Vic Scarpine.
1 Luminosity monitor and LHC operation H. Burkhardt AB/ABP, TAN integration workshop, 10/3/2006 Thanks for discussions and input from Enrico Bravin, Ralph.
BROOKHAVEN SCIENCE ASSOCIATES BIW ’ 06 Lepton Beam Emittance Instrumentation Igor Pinayev National Synchrotron Light Source BNL, Upton, NY.
SPS Syncrotron Telescope Software specifications Aurélie Goldblatt BE-BI-PM
Optical diagnostics for beam halo (I) Coronagraph (II) OTR halo monitor for J-PARC T. Mitsuhashi, KEK.
THE FORWARD PROTON DETECTOR AT DZERO Gilvan Alves Lafex/CBPF 1) MOTIVATION 2) DETECTOR OPTIONS 3) FPD R&D 4) OUTLOOK Lishep 98 Lafex/CBPF Feb 17, 1998.
05/05/2004Cyrille Thomas DIAMOND Storage Ring Optical and X-ray Diagnostics.
Transverse beam size measurement High energy micron electron beam non-invasive diagnostics based on diffraction radiation G.Naumenko*, A.Potylitsyn, L.Sukhikh.
C. Fischer – LHC Instrumentation Review – 19-20/11/2001 Gas Monitors for Transverse Distribution Studies in the LHC LHC Instrumentation Review Workshop.
October 13, IMAGE FORMATION. October 13, CAMERA LENS IMAGE PLANE OPTIC AXIS LENS.
“Performance of BTVs during the CNGS commissioning” E. Bravin AB/BI NBI th International workshop on Neutrino Beams and Instrumentation 4-9 September.
LARP Commissioning Plans for the LHC Synchrotron-Light Monitors Alan Fisher SLAC National Accelerator Laboratory LARP CM13 Port Jefferson, NY
Based on Lars’ progress report of LIU SPS BI Status of follow-up 13/10/2015Lars K. Jensen, V. Kain1.
BSRT CALIBRATION MD SUMMARY LSWG #6-15/09/2015 BSRT TEAM.
Preliminary NML RadiaBeam Transverse Profile Monitor Initial Testing at A0 Alex Lumpkin Bob Flora Congcong Tan James Santucci Jinhao Ruan Randy Thurman-Keup.
G. Ferioli, R. Jung - LHC-BI Review Workshop November 19&20 LHC Screen Profile Monitors G. Ferioli, R. Jung Introduction BTV LHC layout Monitor set-up.
Matching monitors for SPS and LHC E. Bravin 31 March 2011.
G. Trad on the behalf of the BSRT team LHC BI 2015 summary 13/11/2015.
East Area BTV upgrade 2015_09_03 S.Burger BE-BI-PM V.Clerc EN-MEF-SI I.Francescut BE-BI-ML V.deJesus EN-MEF-SI M.Lazzaroni EN-MEF-EBE … F61 line.
New emittance monitor beamline
Peterson xBSM Optics, Beam Size Calibration1 xBSM Beam Size Calibration Dan Peterson CesrTA general meeting introduction to the optics.
An electron/positron energy monitor based on synchrotron radiation. I.Meshkov, T. Mamedov, E. Syresin, An electron/positron energy monitor based on synchrotron.
Beam Physics Issue in BEPCII Commisionning Xu Gang Accelerator physics group.
LIU-SPS progress for BE/BI L. Jensen on behalf of BE/BI 27/08/2015Lars K. Jensen BE/BI/SW1.
SL/BI 16/05/1999DIPAC’99 -- JJ Gras -- CERN SL/BI -- Adaptive Optics for the LEP 2 SR Monitors G. Burtin, R.J. Colchester, G. Ferioli, J.J. Gras, R. Jung,
BSRT UPDATE LMC 02-OCT-2012 F.Roncarolo on behalf of the BSRT team W.Andreazza, E.Bravin, A.Boccardi, J-J.Gras, A.Goldblatt, M.Hamani, T.Lefevre, R.Jones,
LARP LHC Synchrotron-Light Monitors: Status and Possible Upgrades Alan Fisher SLAC National Accelerator Laboratory LARP CM16 Montauk, NY 2011 May 17.
Low Emittance Rings 2014 Workshop INFN-LNF, 18. September 2014 Low Emittance Studies at 3 GeV at PETRA III Joachim Keil DESY.
What did we learn from TTF1 FEL? P. Castro (DESY).
Wir schaffen Wissen – heute für morgen PSI, March 2013 Paul Scherrer Institut PSI / DESY / KIT Mini-Workshop on Longitudinal Diagnostics for FELs.
Requirements from BI and new instruments after LS1 LHC Optics Measurement and Correction Review; B.Dehning 1 Bernd Dehning CERN BE/BI
ODR Diagnostics for Hadron Colliders Tanaji Sen APC.
G. Trad on the behalf of the BSRT team Emittance meeting 04/11/2015.
Installation new BTV HiRadMat from 2017
Beam instrumentation MDs
The TV Beam Observation system - BTV
Beam Gas Imaging Kick-off meeting 30-Oct-2012
Instrumentation for Accelerators Technologies for the HL-LHC
Ch23 Ray Optics 講者: 許永昌 老師.
MD2243: Coronagraph commissioning at 6.5 TeV
E. Bravin, A. Goldblatt, S. Mazzoni, F. Roncarolo, M. Palm
Summary of experience with Tevatron synchrotron light diagnostics
Test of Optical Stochastic Cooling in CESR
Lebanese Teacher Programme 18/04/2017
ODR/OTR emittance station at ATF2 (KEK)
LHC Emittance Measurements and Preservation
Proposals of new electron cloud monitor in the PS
High resolution profile measurements
450 GeV Initial Commissioning with Pilot Beam - Beam Instrumentation
High Level Physics Applications for LCLS Commissioning
Remote sensing in meteorology
Linac Diagnostics Commissioning Experience
Diagnostics overview Beam profile monitors Cherenkov radiators Summary
Measurement of the beam (transverse) emittances
LHC BIF test setup - update
CLIC luminosity monitoring/re-tuning using beamstrahlung ?
Presentation transcript:

SPS Synchrotron Light Monitor -BSR- Status G. TRAD E. Bravin, A. Goldblatt, F. Roncarolo

2 SPS BSR Status, G. Trad 04 /02/2015 Content  System Description  Location  Components  Commissioning  SR Intensity  Status  Outlook  Batmon Readings  Summary

s 3 System Description Commissioning Status Outlook BSR 3 SPS BSR Status, G. Trad 04 /02/2015

SR Monitor Light Source SR extraction Optical Systems Detector System Description Commissioning Status Outlook 4 SPS BSR Status, G. Trad 04 /02/2015

Critical wavelength emitted (even at the flat top energy 28 µm) is far from the detectable range Expected light results to be the Edge radiation Short distance between the two dipoles lead to interference phenomena System Description System Description Commissioning Status Outlook 5 SPS BSR Status, G. Trad 04 /02/2015

integrated energy per turn over the detectable range in function of the energy α ɣ 12.8 From E≈400 GeV the emitted light is comparable to the LHC emitted by the LHC undulator at 450 GeV Therefore it is reasonable to foresee an SR monitor at flattop energy in the SPS SR Source Simulation System Description Commissioning Status Outlook 6 SPS BSR Status, G. Trad 04 /02/2015

System Description Commissioning Status Outlook s 96 mm 100 mm SR Light Towards optical system Beam axisMirror axis View Port 7 SPS BSR Status, G. Trad 04 /02/2015

System Description Commissioning Status Outlook 8 SPS BSR Status, G. Trad 04 /02/2015

Shielded Optical Table Motorized Steering mirror Extraction Mirror SR Light System Description Commissioning Status Outlook 9 SPS BSR Status, G. Trad 04 /02/2015

System Description Commissioning Status Outlook 10 SPS BSR Status, G. Trad 04 /02/2015

SR Light Intensified gated CCD (Motorized) Filters : ND+Color On motorized wheel Ocular Lens for zoom (motorized) Apochromat Lens System Description Commissioning Status Outlook 11 SPS BSR Status, G. Trad 04 /02/2015

Calibration Target for magnification Calculation System Description Commissioning Status Outlook 12 SPS BSR Status, G. Trad 04 /02/2015

Imaged SPS SR light for a bunch of protons over 4 SPS turns along the energy ramp. SR Source Measurement System Description Commissioning Status Outlook 13 SPS BSR Status, G. Trad 04 /02/2015

measured predicted observed Measured SR intensity integrated over the detector area SR Source Measurement System Description Commissioning Status Outlook 14 SPS BSR Status, G. Trad 04 /02/2015

Hardware Fully installed for a flattop measurement Software missing for a safe image acquisition with no expert tools Hardware missing for a continuous measurement along the ramp (function generator for the gain control). If optimized acquisition could reach 30 frames per seconds (expert tools) Status System Description Commissioning Status Outlook 15 SPS BSR Status, G. Trad 04 /02/2015

OUTLOOK

CROSS CALIBRATION WITH WS (s) FOR RESOLUTION MEASUREMENTS 17 SPS BSR Status, G. Trad 04 /02/2015

Dispersion is important in the horizontal plane Needed a good (delta p)/p knowledge 18 SPS BSR Status, G. Trad 04 /02/2015

Possible Installation of a high frame rate digital camera (1000 fps) System Description Commissioning Status Outlook 19 SPS BSR Status, G. Trad 04 /02/2015

SPARE