Desalination Becomes A Reality In Tampa Bay Florida Jim Jensen Senior Project Manager PB Water Area Manager Parsons Brinckerhoff Quade & Douglas, Inc.

Slides:



Advertisements
Similar presentations
Rivanna Water & Sewer Authority Community Water Supply Plan Update Public Meeting Monticello High School September 21, :00 pm.
Advertisements

n Headquarters:Raleigh, N.C. n Employees:17,355 n Customers:2.8 million n Primary Subsidiaries: CP&L, Florida Power, NCNG, Progress Telecom, SRS n Operating.
This presentation is an abbreviated version of the original PowerPoint presentation of June 23, This version was presented at the Commissioners’
THE EXPANDING ROLE of RECYCLED WATER The Need, Benefits and Cost Effectiveness Make Recycled Water an Increasingly Valued Resource Harry Ehrlich, SDA Principal.
Eld Polk County Southeast Regional Wellfield. Polk County, Florida  Central Florida (Landlocked)  554 Lakes  Headwaters to Multiple Rivers (Low Volume)
Water Conservation in the San Diego Region Bill Jacoby San Diego County Water Authority North Bay Water Association April 2, 2004.
Membrane Softening Water Treatment Plant completed in –Upper Floridan groundwater wells provide the source water for treatment. –Treatment process.
Presented by: Kevin J. Spencer, P.G. R.W. Harden and Associates, Inc. Benefits and Challenges of Developing Brackish Groundwater Supplies WATER Supply.
WRWSA Water Supply Plan Update Progress Report – (April 1- May 15) >Project Tasks 1.Water Demand Estimates 2.Availability of Ground- and Surface Water.
Carlsbad Desalination Project
American Society of Farm Managers & Rural Appraisers Kevin Morrison, P.G. Project Coordinator – Desalination Engineering Brackish Groundwater Desalination.
United Water & Sanitation District Stonegate Village Metro District Water Supply Opportunities 1.
 Groundwater Supply ◦ Quantity ◦ Quality  Infrastructure ◦ Treatment ◦ Transmission ◦ Distribution  Response Plans ◦ Long-term ◦ Short-term ◦ Emergencies.
1 South Orange Coastal Ocean Desalination (SOCOD) Project, Ocean Desalination Costs and Recent Public Opinions November 2011 Status Update Karl Seckel,
Seawater Desalination and Water Supply Reliability in Marin County Louis Armstrong, URS Corporation.
Delta Conveyance: Update on the Planning Process and Analysis of Water Supply and Costs CCWA Board of Directors February 25, 2010.
June 13, 2003 Status Report. Project Summary n Project to provide new 27.5 MGD blended supply to El Paso n Cooperative effort between Fort Bliss and EPWU.
Newark Desalination Facility
Water System Planning Study
Sole Source Contracts for Administrative Hearing Southeast Water Supply Augmentation Project Presented to: Orange County Board of County Commissioners.
Water Treatment Plant No. 2 Concentrate Zero Liquid Discharge August 30, 2011.
Desalination, With a Grain of Salt: A California Perspective Desal Response Group Aquarium of the Pacific October 2006.
Lay-out of Proposed Scheme. Positives – Well located for integration into both NMBM Potable and Industrial supply infrastructure Can supplement either.
Water for Monterey County Regional Project Capital and O&M Cost Description 1 Lyndel Melton, P.E. RMC Water and Environment.
Chapter 21: How We Obtain and Use Water. Water To understand water, we must understand its characteristics, and roles: –Water has a high capacity to absorb.
San Diego County Water Issues 2010 Update Maritime Business and Technology Summit November 16, 2010 Seawater Desalination for San Diego.
Rodman & Renshaw Conference September 2015 This presentation contains forward-looking statements that are subject to significant risks and.
1 The Tampa Bay Water Surface Water DBO Joe Ortiz U.S. Conference of Mayors November 19, 2008.
HEA 1738 IC as amended Water Resource Allocation and Distribution in Indiana IDNR Division of Water.
July 2007 AMTA Event Type “Theme” Location - Date Improving America’s Water Through Membrane Filtration & Desalting America’s Authority in Membrane Technology.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Group 7: DESALINATION - A SUSTAINABLE OPTION? By: Matthew Harvey ( ); Richard Lea ( ); Callum Kerr ( );
Withlacoochee Regional Water Supply Authority Water Supply Plan Update - Progress Report #3 May 15 – June 18.
Energizing Utilities to Embrace Demand Energizing Utilities to Embrace Demand Management South Florida Water Management District Water Summit December.
Rulemaking for Central Florida Coordination Area Coordinated Rulemaking by the South Florida, St. Johns River and Southwest Florida Water Management Districts.
Interdistrict Transfers of Water and Local Sources First Land Resources and Regulatory Committee November 3, 2005 Land Resources and Regulatory Committee.
Texas Innovative Water 2010 Kevin Morrison, P.G. Project Coordinator / Water Resources What has SAWS Learned about Concentrate Disposal Options for Inland.
1 Update Ocean Desalination Feasibility Studies Karl Seckel Assistant General Manager.
Rural Water District No. 5 Douglas County Study Session May 17, 2007.
South Orange Coastal Ocean Desalination (SOCOD) Project Dana Point/Doheny Beach, California November 2010 Status.
Seacoast Utility Authority Water Use Permit Steven Memberg, Section Leader Water Use Regulation Division, Water Supply Department January 26, 2009.
Texas Innovation Water 2010 Seawater Desalination What is the benefit to the State from implementing the Brownsville Seawater Demonstration Project?
Western Delta Diversion Gary W. Darling Delta Stewardship Council September 22, 2011 Delta Diablo Sanitation District.
Levy Nuclear Plant Overview of Water Issues Presented by Jamie Hunter to the FDEP – Central District’s 13 th Annual Power Generation Conference Lake Buena.
POTABLE REUSE THE ALTERNATIVE WATER SUPPLY. Florida Section WateReuse Association November 9, 2015 Chuck Drake, PG.
Natural Disaster Management Group Drinking Water Advisory Group July 21, 2015 Alexander Hinz Wendi Wilkes Water Supply Division Texas Commission on Environmental.
 Project Capacity: 54 MGD  Water Purchase Agreement: 30-year take-if-delivered contract with San Diego County Water Authority for water purchase of.
MSSC 2011 Annual Salinity Summit February 17 – 18, 2011 Thirty Years of Success in Implementing Desalination By Roger K. Noack, P.E. HDR Engineering, Inc.
1. 2 Regional water wholesaler to 6 counties covering 5,200 square miles Serves 19 million people = 50% of the state’s population with projected population.
City of San Diego’s Recycled Water Study Item W15a October 10, 2012 Presentation to the California Coastal Commission.
Potable Reuse in Texas: A Glimpse into the New Water Frontier Ellen McDonald, Ph.D., P.E. Alan Plummer Associates, Inc.
Water Supply Orange County Presented by Kirby B. Green Executive Director St. Johns River Water Management District January 27, 2009.
Withlacoochee Regional Water Supply Authority Water Supply Plan Update #7 October 15 – November 15.
Alternative Rate Structure Paul Smith Vice President, Rates Duke Energy Ohio June 20, 2006.
Withlacoochee Regional Water Supply Authority Water Supply Plan Update - Progress Report #5 July 15 – September 15.
PROPOSED BRUNSWICK COUNTY INTERBASIN TRANSFER PETITION REQUEST NOVEMBER 14, 2013.
Miami-Dade Water & Sewer Department Miami-Dade Water and Sewer Department |  1   Reuse, Every Drop Has Value Seminar FPL JPA.
Overview of Desalination Trends and Jaffna Project
UTILITY PARTNERSHIP CITY OF STOCKTON & OMI / THAMES WATER SERVICE CONTRACT.
Nikolay Voutchkov, PE, BCEE
Sam Aminfard CATEE 2017 – Texas Energy Summit November 15, 2017
Seawater Desalination
CITY OF MARSHALL CHLORIDE ISSUES September 26, 2017
CITY OF MARSHALL CHLORIDE ISSUES NOVEMBER 22, 2016
Withlacoochee Regional Water Supply Authority
Brackish Water Desalination Project
City of Sunrise Wastewater Reuse Program
Claude “Bud” Lewis Desalination Plant
Carlsbad and Huntington Beach Seawater Desalination Facilities
Why Potable Reuse in Florida?
Presentation transcript:

Desalination Becomes A Reality In Tampa Bay Florida Jim Jensen Senior Project Manager PB Water Area Manager Parsons Brinckerhoff Quade & Douglas, Inc. San Diego NBWA Water Conference April 2, 2004 Jim Jensen Senior Project Manager PB Water Area Manager Parsons Brinckerhoff Quade & Douglas, Inc. San Diego NBWA Water Conference April 2, 2004

Institutional  Tampa Bay Water regional water wholesaler  Owns all significant wellfields  Regional distribution system  New surface WTP  Member governments  Hillsborough, Pasco & Pinellas counties  New Port Richey, St. Petersburg & Tampa  Operate their own WTPs  Retail water distribution systems  Tampa Bay Water regional water wholesaler  Owns all significant wellfields  Regional distribution system  New surface WTP  Member governments  Hillsborough, Pasco & Pinellas counties  New Port Richey, St. Petersburg & Tampa  Operate their own WTPs  Retail water distribution systems

Why Desalination Is Needed In Southwest Florida  Years of drought  Overpumping from concentrated wellfields  Environmental stress to wetlands and lakes  Years of drought  Overpumping from concentrated wellfields  Environmental stress to wetlands and lakes

SWFWMD Required Reduction In Wellfield Withdrawals  Average of 158 MGD pumped in 1998  Settlement required reduction in pumping to 121 MGD in 2003  Further reduction in pumping to 90 MGD by 2008  Average of 158 MGD pumped in 1998  Settlement required reduction in pumping to 121 MGD in 2003  Further reduction in pumping to 90 MGD by 2008

Master Water Plan  $610 million capital improvement plan  Aggressive water conservation program  Skimmed surface water stored in above ground reservoir  Desalinated seawater  Desalinated brackish water  Limited new groundwater sources  $610 million capital improvement plan  Aggressive water conservation program  Skimmed surface water stored in above ground reservoir  Desalinated seawater  Desalinated brackish water  Limited new groundwater sources

Water Master Plan Requirements  Diversified and sustainable  Limited new groundwater ( reduced total groundwater withdrawal)  Drought resistant  Reasonably priced  Diversified and sustainable  Limited new groundwater ( reduced total groundwater withdrawal)  Drought resistant  Reasonably priced

Seawater Desalination Procurement Process  Desalinated water supply MGD  Board initially not fully committed  Tampa Bay Water did not own a site  Developer responsible for water delivery system to point of connection  Design, Build, Own, Operate, Transfer  Co-funded capital costs by SWFWMD  Desalinated water supply MGD  Board initially not fully committed  Tampa Bay Water did not own a site  Developer responsible for water delivery system to point of connection  Design, Build, Own, Operate, Transfer  Co-funded capital costs by SWFWMD

PROPOSALS  All 5 Pre-Qualified Developers Submitted  Approximately 23 options and alternatives submitted  Three sites proposed  MED, MVC and RO process  Power plant intake and discharge canals used  All 5 Pre-Qualified Developers Submitted  Approximately 23 options and alternatives submitted  Three sites proposed  MED, MVC and RO process  Power plant intake and discharge canals used

ANCLOTE POWER PLANT Florida Seawater Desaliantion Company Progress Energy/Ionics BIG BEND POWER PLANT Enova/SSI 2 Florida Water Partners Stone and Webster HIGGINS POWER PLANT 1 Progress Energy Ionics 1 Higgins Power Plant was eliminated from further consideration. 2 Enova/SSI was not selected for further evaluation. Proposed Desalination Site Locations

Power Plant Co-Location  Shares intake and outfall with power plant once through cooling water system  Tie in to power plant discharge pipeline on land  Increase in temperature increases production of desalinated water  Bay water salinity less than open seawater  Shares intake and outfall with power plant once through cooling water system  Tie in to power plant discharge pipeline on land  Increase in temperature increases production of desalinated water  Bay water salinity less than open seawater

Tampa Bay Desalination Facility

Desalinated Water Quality  Meets all local, State and Federal drinking water standards  Chloride maximum 100 mg/L (partial second pass)  Lime added to prevent corrosion  Disinfectant added to prevent biological growth in delivery pipeline  Meets all local, State and Federal drinking water standards  Chloride maximum 100 mg/L (partial second pass)  Lime added to prevent corrosion  Disinfectant added to prevent biological growth in delivery pipeline

Seawater Concentrate Disposal  16.7 MGD concentrate mixed with 1,350 MGD cooling water flow = 70:1  Blended discharge increase ~2% at canal discharge point  NPDES Permit minimum blending ratio 20:1 (1 of 4 generators operating)  16.7 MGD concentrate mixed with 1,350 MGD cooling water flow = 70:1  Blended discharge increase ~2% at canal discharge point  NPDES Permit minimum blending ratio 20:1 (1 of 4 generators operating)

Public Acceptance  Extensive public information and education program from proposal process through construction  Public Service Announcements  Editorial Board Presentations  Open House presentations/ Q&A  Focus Groups  Homeowner’s Associations, etc.  70% Favorable for desalination  Concern about environmental impact  NIMBY  Extensive public information and education program from proposal process through construction  Public Service Announcements  Editorial Board Presentations  Open House presentations/ Q&A  Focus Groups  Homeowner’s Associations, etc.  70% Favorable for desalination  Concern about environmental impact  NIMBY

Plant Operational Status  Began water production in March 2003  Excessive fouling problems  Did not pass Acceptance Tests  Operational and other changes reduce fouling, operational costs still to high  Production averages 22.5 MGD in February 2004 before shutdown for repairs  Began water production in March 2003  Excessive fouling problems  Did not pass Acceptance Tests  Operational and other changes reduce fouling, operational costs still to high  Production averages 22.5 MGD in February 2004 before shutdown for repairs

Plant Institutional Status  Covanta notified of termination of O&M contract in October 2003  Covanta files for bankruptcy delaying repairs and termination  Board nominates Interim Operations, Maintenance and Management firms  American Water Services/Pridesa  Ionics/Montgomery Watson Harza  Veolia Water (USFilter Operating Services)  Covanta notified of termination of O&M contract in October 2003  Covanta files for bankruptcy delaying repairs and termination  Board nominates Interim Operations, Maintenance and Management firms  American Water Services/Pridesa  Ionics/Montgomery Watson Harza  Veolia Water (USFilter Operating Services)

Desalination Is A Reality In Tampa Bay  Pretreatment problems resulting in excessive fouling can be fixed  The Tampa facility meets all drinking water standards  The Tampa facility is capable of producing 25 MGD of potable water  Pretreatment problems resulting in excessive fouling can be fixed  The Tampa facility meets all drinking water standards  The Tampa facility is capable of producing 25 MGD of potable water

Questions?