July 09, 2008 NIH Project Management Community Project Scope and Change Management Discussion This document is confidential and is intended solely for.

Slides:



Advertisements
Similar presentations
© Telelogic AB Modeling DoDAF Compliant Architectures Operational Systems Technical.
Advertisements

© 2009 IBM Corporation iEA16 Defining and Aligning Requirements using System Architect and DOORs Paul W. Johnson CEO / President Pragmatica Innovations.
A BPM Framework for KPI-Driven Performance Management
1 INCOSE Chesapeake Chapter Enterprise SE Panel Discussion L. Mark Walker/LMC 21 March 2007.
Course: e-Governance Project Lifecycle Day 1
Systems Development Environment
Leveraging Success Through Effective Project Management Tools and Processes Charlie Schloff Manager, C3P Project Office Ford Motor Company File: MPUG 2000.
Enterprise Resource Planning
 DB&A, Knowledge Management Within and Across Projects June 15, 2012 INNOVATION for a better world.
Transformations at GPO: An Update on the Government Printing Office's Future Digital System George Barnum Coalition for Networked Information December.
The Transforming Power of the ITIL Framework for the Project Manager Patrick von Schlag Deep Creek Center November 10, 2010.
Well, Sort-of.
ERP Implementation Fundamentals
What is an Information System? Input of DataResourcesProcessing Data Data Control of System Performance Storage of Data Resources Output of InformationProducts.
1 Objective of today’s lesson S oftware engineering occurs as a consequence of a process called system engineering. Instead of concentrating solely on.
System Engineering Instructor: Dr. Jerry Gao. System Engineering Jerry Gao, Ph.D. Jan System Engineering Hierarchy - System Modeling - Information.
Introduction to Building a BI Solution 권오주 OLAPForum
Introduction to Computer Technology
Roles and Responsibilities
Chapter 2 The process Process, Methods, and Tools
Engineering, Operations & Technology | Information TechnologyAPEX | 1 Copyright © 2009 Boeing. All rights reserved. Architecture Concept UG D- DOC UG D-
Putting a Face on Electronic Commerce Kathy Warden.
Demystifying the Business Analysis Body of Knowledge Central Iowa IIBA Chapter December 7, 2005.
Business Analysis and Essential Competencies
The Challenge of IT-Business Alignment
What is Oracle Hyperion Planning  Centralized, web- based Budgeting and Planning application  Combines Operational and Financial measures to improve.
Geospatial Systems Architecture Todd Bacastow. GIS Evolution
What is a life cycle model? Framework under which a software product is going to be developed. – Defines the phases that the product under development.
Views from different perspectives
Methodology for Information Strategy Planning for ERP By : Saleh A. Motawe Supervisor : Yassmen El bobo.
Introduction to Business Intelligence
Microsoft ® System Center Service Manager 2010 Infrastructure Planning and Design Published: December 2010.
VALUE BASED SYSTEMS ENGINEERING THE VALUE ADDED PATH FORWARD Joseph Maley October 8, 2015.
Relationships July 9, Producers and Consumers SERI - Relationships Session 1.
What is e-business?. 2 Agenda Regional Training Workshop for Enterprise Support Agencies to Promote E-business for SMEs in the Greater Mekong Subregion.
Managing an Enterprise GIS Project: Key Things You Need Right from the Start Gerry Clancy Glenn Berger.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
Systems Design Approaches The Waterfall vs. Iterative Methodologies.
ERP Implementation Fundamentals Richard Byrom Oracle Consultant, Speaker and Author
EPA Geospatial Segment United States Environmental Protection Agency Office of Environmental Information Enterprise Architecture Program Segment Architecture.
Software Engineering COSC 4460 Class 4 Cherry Owen.
ANKITHA CHOWDARY GARAPATI
Requirements Development in CMMI
Rational Unified Process Fundamentals Module 7: Process for e-Business Development Rational Unified Process Fundamentals Module 7: Process for e-Business.
Stoneworks Software Corp. Presents Delegate for Windchill® An Executive Overview.
1- 1 Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 1998 James A. O'Brien Fourth Edition Management Information Systems Managing Information Technology.
Business Process Modeling for EPLC Angela Thomas Ryan Kahn
Alcatel-Lucent CDC Workshop, Coaching & Knowledge Transfer Genesis.
Arlington, VA March 31, 2004 Presentation for the Advisory Committee for Business & Operations Effective Practices Research Overview For Merit Review This.
Management Information System
Integration integration of all the information flowing through a company – financial and accounting, human resource information, supply chain information,
 CMMI  REQUIREMENT DEVELOPMENT  SPECIFIC AND GENERIC GOALS  SG1: Develop CUSTOMER Requirement  SG2: Develop Product Requirement  SG3: Analyze.
21/1/ Analysis - Model of real-world situation - What ? System Design - Overall architecture (sub-systems) Object Design - Refinement of Design.
Momentum. Strategy & Roadmapping Business Analysis Information Architecture Usability / User Experience Rich Media Social Media (Web 2.0) Interface Design.
Software Engineering Lecture 10: System Engineering.
A way to develop software that emphasizes communication, collaboration, and integration between development and IT operations teams.
Chapter 9 : Knowledge Transfer in the E-World KNOWLEDGE TRANSFER IN THE E-WORLD Chapter 4.
What’s New in SPEED APPS 2.3 ? Business Excellence Application Services.
1 The XMSF Profile Overlay to the FEDEP Dr. Katherine L. Morse, SAIC Mr. Robert Lutz, JHU APL
Roles and Responsibilities
Overview of MDM Site Hub
PMRIPT Portal Team.
EIN 6133 Enterprise Engineering
By Jeff Burklo, Director
Data Warehouse Overview September 28, 2012 presented by Terry Bilskie
CAF Quarterly Meeting Measuring the Value of an EA Practice
Chapter 1: Introduction to Systems Analysis and Design
Red Sky Update “Watching the horizon for emerging health threats”
Requirements Development in CMMI
Presentation transcript:

July 09, 2008 NIH Project Management Community Project Scope and Change Management Discussion This document is confidential and is intended solely for the use and information of the client to whom it is addressed.

1 The purpose of today’s discussion is to share Change and Requirement Management techniques/process that enable us to effectively manage project scope  Speaker: Chris Ghion  Relevant Background: –Booz Allen Hamilton: Currently supporting FDA CIO office, leading technical and software engineering initiatives using Oracle, Documentum, J2EE, Business Objects and Cold Fusion. Responsible for the program management and technical leadership of over 30 concurrent FDA projects, 200 staff –CareFirst BCBS: Led Information Technology strategy and delivery in support of sales and marketing organizations, acting as CIO Strategic Advisor for all CareFirst Information Technology Plans and Initiatives, and directing development and implementation of Enterprise Analytics technical program in support of Marketing organization –Verizon: Program Manager in the e-Commerce business unit. Established the first e- commerce capability to add phone service via the internet

2 One year after obtaining CMMI Level 3 we still identified the majority of changes affecting project scope in the latter phases of the SDLC, regardless of SDLC type (waterfall, iterative, RAD) JUNE 2004 Phase IdentifiedChange % Requirements4% Design18% Development24% Test54%  Community Models and Multi Dimensional Requirement Views are created to bridge the gap between business and engineering by addressing each dimension of a requirement from both a user (community) and developer perspective.  These artifacts provide a robust and detailed depiction of user needs, concepts of operation, interface specifications, data models, and requirements specifications and allocations.  The layered graphical presentation at the center of this method enables all project constituents to clearly understand the intent of the need and participate in detailed specification development and validation process. JUNE 2008 Phase IdentifiedChange % Requirements37% Design28% Development25% Test10% CHALLENGESOLUTIONRESULTS

3 Community Model Purpose: To provide a segmented enterprise view and user role types; suppliers, customers, brokers, and partners from an enterprise ‘community’ perspective. Building a community model helps to understand the enterprise environment, its users, its boundaries and the interfaces the architecture must support. Usage: We develop Community Models to show how systems support business processes as depicted within the Firms and Products Community of Interest And Community Models are developed to show the relationship between systems within the local and enterprise environments (Slide 4)

4 Multi-Dimensional Requirements View (MRV)  Created in an integrated environment of stakeholder, developers and integrators  Captures the activity workflow of people and systems  Captures the behaviors between functions, applications and data  Derives new requirements from integrated architecture analysis  Provides framework to map existing legacy requirements  Blend requirement analysis with preliminary design to answer how the system will satisfy the expressed needs of the community Requirements Visualization Web viewable; DOORS, RequistPRO Central Repository Define operational functional steps – activity workflow Map ops functions to system layer applications Map data created & data read to functions Derive new requirements, map existing requirements Derive and/or Map business rules to functions MRV System Requirements – Workflow, Interfaces, Behaviors

5 In conclusion, an automated Change Management supporting process remains the foundation for proactively managing project scope  Artifacts are selected from the organizational BAH repository or provided by the client and loaded into the configuration management repository  If desired, automated workflow processes are configured for artifact management.  Metrics are entered into the CM toolset as team members check-in each artifact. Each metric contains project-specific thresholds  When exceeded, the thresholds trigger automatic notifications that risk mitigation/planning activities need to occur  Project data are electronically transferred into the metrics databases at daily intervals  Full project reporting and monitoring is facilitated through the use of dashboards Configuration Management Toolset Risk Management Portal Metric Collection per Lifecycle Artifact Metrics Database Dashboard