FAIR International Facility for Antiproton and Ion Research Key features and organization Plans for realization Experiments and LOIs Technical challenges.

Slides:



Advertisements
Similar presentations
Boris Sharkov FAIR Joint Core Team
Advertisements

FAIR – Status Report Walter F. Henning NuPECC Meeting -- March Venice.
Darmstadt Helmholtz Center for Heavy Ion Research Facility for Antiproton and Ion Research FAIR = A New International Facility next to GSI.
FAIR – Facility for Antiproton and Ion Research * FP6 Proposals * Status and Recent Activities Walter F. Henning / GSI Darmstadt NuPECC, Lisbon, November.
Status of FAIR Boris Sharkov FAIR Joint Core Team.
The Physics of Dense Nuclear Matter
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Status of the FAIR project TRD workshop, Romania, September 24-28, 2005.
J. Marton, ÖPG-FAKT, Weyer, September 27, FAIR at GSI and the Future of Hadron Physics J. Marton Institute for Medium Energy Physics Austrian Academy.
Raport o stanie projektu FAIR – przedstawiony w oparciu o folie prof.W. Henninga, dyrektora GSI, oraz H. Wenningera kierującego pracami STI i H.-F Wagnera.
GSI and FAIR - EPICS status report - Peter Zumbruch Experiment control systems group GSI (KS/EE)
Lasers and Highly-Charged Heavy Ions at Günther RosnerHZDR Workshop, Rossendorf, 6/9/111.
1 Antiprotons at FAIR FLAIR SIS 100 / 300 pbar production Capture and accumulation deceleration High Energy Storage Ring for Antitprotons (HESR): 0.8–15.
Super-FRS the Next-Generation Facility for Physics with Exotic Nuclei
Hans Geissel, Pisa05 Precision Experiments with Exotic Nuclei at Relativistic Energies Hans Geissel, GSI and JLU Giessen  Introduction  Precision Measurements:
PLANS JINR PARTICIPATION for JINR PARTICIPATION FAIR PROJECT: in the FAIR PROJECT: - ACCELERATOR TECHNOLOGY A.Kovalenko 103 session of the JINR Scientific.
Outlook towards future Polish participation in the new Accelerator Facility Tomasz Matulewicz Warsaw University.
FAIR GmbH and FAIR Project History, Status and Outlook
Open Charm Everard CORDIER (Heidelberg) Grako meeting HD, April 28, 2006Everard Cordier.
Research Areas at FAIR Structure and Dynamics of Nuclei - Radioactive Beams Nucleonic matter Nuclear astrophysics Fundamental symmetries Hadron Structure.
Christina Markert Physics Workshop UT Austin November Christina Markert The ‘Little Bang in the Laboratory’ – Accelorator Physics. Big Bang Quarks.
BINP for FAIR Yu.Shatunov Moscow May Research and Development Contract between GSI and BINP 1. Kickers for synchrotrons and storage rings.
Progress Report Günther RosnerNuPECC, Copenhagen, 15/6/121.
Future Penning Trap Experiments at GSI / FAIR – The HITRAP and MATS Projects K. Blaum 1,2 and F. Herfurth 1 for the HITRAP and MATS Collaboration 1 GSI.
FAIR – Status Report Walter F. Henning.
Claudia Höhne GSI Darmstadt
Workshop Summary: Physics and Technology Frontiers of Facilities for Hadron Physics Richard Milner Massachusetts Institute of Technology Frank Rathmann.
R&D for R3B/EXL silicon spectrometers, ELISe in-ring instrumentation based on planar Si and CVDD Alexander Gorshkov Flerov Laboratory of Nuclear Reactions.
Working Group 5 Summary David Christian Fermilab.
The FAIR Chance for Nuclear Astrophysics Elemental Abundances Core-collapse Supernovae The neutrino process The r-process nuclei in -Wind Neutron Stars.
The Active Target for R 3 FAIR Peter Egelhof GSI Darmstadt, Germany ACTAR Workshop Bordeaux, France June 16 – June 18, 2008 FAIR.
Helmholtz Centre for Ion Research G. Moritz, Cryogenic Expert meeting, GSI, September 19/ (courtesy of D. Krämer for the FAIR Design Team) Current.
GSI Future Facility Walter F. Henning March 2003, LEAP03 Introduction Facility Layout and Characteristics Scientific Areas and Goals Research with Antiprotons.
1 Development of models of intrabeam scattering for charged beams in storage rings E. Mikhaylova Joint Institute for Nuclear Research Dubna, Russia The.
FAIR/SFRS meeting at HIPHeikki Penttila Oct 6, 2008 Facility for Antiproton and Ion Research FAIR is An international accelerator facility of the ”next.
NUSTAR Nuclear Structure, Astrophysics, Reactions NUSTAR is the biggest collaboration in FAIR The collaboration unites 450 scientists from 98 institutions.
* Spokesperson: Isao Tanihata - Beijing and Osaka Co-spokesperson: Hans Geissel – GSI Chair of Collaboration board: Juha Äystö – Helsinki Co-chair: Christoph.
The Facility for Antiproton and Ion Research in Europe Günther RosnerMESON2012, Krakow, 4/6/121.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Status of the FAIR project Visit in Wuhan,China November 23, 2006 J.
SIS 100 main magnets G. Moritz, GSI Darmstadt (for E. Fischer, MT-20 4V07)) Cryogenic Expert Meeting, GSI, September 19/
FAIR Facility for Antiproton and Ion Research Guenther RosnerNuPECC, Prague,
1 Plans for JINR participation at FAIR JINR Contributions: ● Accelerator Complex ● Condensed Baryonic Matter ● Antiproton Physics ● Spin Physics Physics.
International FAIR Boris Sharkov FAIR / MEPhI Scientific Managing Director, Lomonosov MSU 2015 Sweden FranceIndia Finland GermanyPoland UK Romania Russia.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR Status Report CBM Collaboration Meeting March 9, 2005 J. Eschke,
A.N.Sissakian, A.S.Sorin Very High Multiplicity Physics Seventh International Workshop JINR, Dubna, September 18, 2007 Status of the project NICA/MPD at.
The FAIR* Project *Facility for Antiproton and Ion Research Outline:  FAIR layout  Research programs Peter Senger, GSI USTC Hefei Nov. 21, 2006 and CCNU.
Status and Perspectives for the NuSTAR collaboration Reiner Krücken Physik Department E12 Technische Universität München.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU Design Study Kick-off meeting April 14-15,
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU CNI contract Kick-off meeting, December 1-2,
The High Intensity Frontier Franco Cervelli INFN-Pisa 7 Nov, 2005.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Construction of FAIR Phase-1 December 2005 J. Eschke, GSI Construction.
Proposed strategy for the FAIR science program Boris Sharkov Scientific managing director FAIR NuPECC Sweden FranceIndia Finland GermanyPoland.
M. Steck, RUPAC 2006, Novosibirsk Cooling of Rare Isotope Beams in the ESR Cooling by: Stochastic cooling (pre-cooling) Electron cooling (final cooling)
UK Research in Nuclear Physics P J Nolan University of Liverpool.
GSI, Si microstrip detectors for R3B – general concept and prototypes O. Kiselev Gesellschaft für Schwerionenforschung, Darmstadt Institut für.
4 Construction Site today Construction Site – current Google Maps View 1Short Status of FAIR for NuPECC /KP.
The HITRAP Project at GSI For the HITRAP collaboration: Frank Herfurth GSI Darmstadt.
1 FAIR Project – status and research program Zbigniew Majka – FAIR Joint Core Team, Head of Research Facility for Antiproton and Ions Research Helmholtz.
Inti Lehmann Facility for Antiproton and Ion Research Darmstadt, Germany 2nd PhD Science GSI 2014 – 11 August 2014 FAIR – Facility for Antiproton.
Reinhard Kulessa1 Polish-German Meeting on the New International Accelerator Facility at Darmstadt Present Polish-German Collaborations at GSI.
GSI Helmholtzzentrum für Schwerionenforschung GmbH GSI visitation W. Barth W. Barth, WAO 2014, Mainz/Germany.
The Active Target for R 3 FAIR Peter Egelhof GSI Darmstadt, Germany ACTAR Workshop Bordeaux, France June 16 – June 18, 2008 FAIR.
International Conference on Science and Technology for FAIR in Europe 2014 APPA Cave Instrumentation for Plasma Physics Vincent Bagnoud, GSI and Helmholtz.
Precision Tests of Fundamental Interactions with Ion Trap Experiments
Perspectives for Heavy-Ion Collisions at Future Facilities
In-Kind FAIR David Urner FAIR, Darmstadt , D. Urner.
The FAIR Project Physics Programme of FAIR CBM PANDA NUSTAR
Ladies and Gentlemen, Let me give you a short outlook to the operating of the new facility at this point. My colleague has just shown you, how we operate.
Project "Nuclotron M" / NICA
FAIR – the Universe in the labororatory
HESR for SPARC 25th November FAIR MAC Dieter Prasuhn.
Presentation transcript:

FAIR International Facility for Antiproton and Ion Research Key features and organization Plans for realization Experiments and LOIs Technical challenges NUSTAR: nuclear structure and the SUPER FRS Gottfried Münzenberg, Jan Scientific Collaboration Workshop, German Centers – JINR, 2005

Research Areas at FAIR Structure and Dynamics of Nuclei - Radioactive Beams Nucleonic matter Nuclear astrophysics Fundamental symmetries Hadron Structure and Quark-Gluon Dynamics - Antiprotons Non-pertubative QCD Quark-gluon degrees of freedom Confinement and chiral symmetry Nuclear Matter and the Quark-Gluon Plasma - Relativistic HI - Beams Nuclear phase diagram Compressed nuclear/strange matter Deconfinement and chiral symmetry Physics of Dense Plasmas and Bulk Matter - Bunch Compression Properties of high density plasmas Phase transitions and equation of state Laser - ion interaction with and in plasmas Ultra High EM-Fields and Applications - Ions & Petawatt Laser QED and critical fields Ion - laser interaction Ion - matter interaction SIS 18 Ion Beam Heating Jupiter Sun Surface Magnetic Fusion solid state density Temperature [eV] Density [cm -3 ] Laser Heating PHELIX Ideal plasmas Strongly coupled plasmas Sun Core Inertial Cofinement Fusion

Primary Beams GeV/u; 238 U 28+, /s; 35 GeV/u, 238 U /s 30 GeV protons 4x10 13 /s Secondary Beams radioactive beams, factor 10 4 intensity Antiprotons GeV Storage and Cooler Rings Radioactive beams e – A collider antiprotons GeV stored and cooled The New Facility and its Characteristics Rapidly cycling superconducting magnets Cooled beams Key Technical Features Existing New SIS 100/300 UNILAC SIS 18 ESR HESR CR NESR Super FRS

0% 50% 100% RIbs N-N Collisions Antiprotons Plasma-Physics 100 Tm Ring 300 Tm Ring C S R HES R Nucleus-Nucleus 100 se Radioactive Beams Plasma Physic s Antiprotons Duty-Cycles of the Accelerator Rings Duty-Cycles of the Physics Programs Parallel Operation of Experiments with Storage Rings SIS300

STI-FAIR Scientific + Technical Issues Sidney Gales AFI-FAIR Administrative + Funding Issues H.F.Wagner ISC-FAIR Internat. Steering Committee H.Schunck PAC QCD PAC NUSTAR PAC APPA TAC Observer FAIR Projekt The Multi-National FAIR Project J. Eschke 2004

MoU Contract Development Contract Negotiations Closing LoI's Proposals / TR's PAC's Technical Committee TDR's Signing of MoU Phase I – Governed by MoU Phase II Governed by contracts

Signing of Memorandum of Understanding (MoU) September 23, 2004 in Berlin FAIR member countries: Germany, Finland, France, Italy, Russia, Spain, Sweden, UK Observers: Hungary, Poland, India, China, USA

On November 11, 2004, the Head of the Federal Agency on Science and Innovations Dr.S.N.Mazurenko signed the MoU for Russia FAIR MoU

Stage 1: Civil Construction Ringtunnel for double ring synchrotron incl. technical buildings Buildings housing the SFRS, the CR and NESR plus nuclear structure and atomic physics experiments Office building Accelerator 2 x /puls U 28+ at 200 AMeV 4 x /puls U 73+ at 1000 AMeV 4 Hz up to 12 Tm; 1 Hz up to 18 Tm Bunch compression to 70 ns Research Nuclear structure and nuclear astrophysics (gain factor in intensities for radioactive secondary beams: ~100) Plasma physics at 'old' facility (gain factor in power density: ~200) Atomic physics studies with highly charged/radioactive ion beams Staged construction scenario

Stage 2: HESR Civil Construction (completed) p linac building HESR building Buildings housing nuclear collision, plasma physics and atomic physics experiments Accelerator 1 x /puls U 28+ at 2,7 AGeV 1 x /puls U 73+ at 8,3 AGeV (Ne 10+ to 14 AGeV) Bunch compression to 50 ns 2,5 x /puls protons up to 29 GeV up to antiprotons accumulated, stored and cooled in the HESR up to 15 GeV low (down to zero) energy antiprotons at NESR and HITRAP Research Nuclear structure and nuclear astrophysics (full gain factor in intensities for radioactive secondary beams: ~ ) QCD studies with protons and antiprotons Precision studies with antiprotonn beams for fundamental symmetries and interactions

Stage 3: Accelerator 2 x 10 9 /puls U 92+ up to 34 AGeV Stretcher option with long extraction times from seconds up to minutes High energy e-cooling for HESR Research Full energy and luminosity for nuclear collisions program at CBM Precision QCD Studies at PANDA up to 15 GeV Plasma research (full gain factor in power density: ~2500) Atomic reaction studies with fast beams Full parallel operation of up to four experiments

Planning of Civil Construction / Layout of Buildings

SIS100/300 Underground Tunnel 5 m -24 m Tunnel in Open-Pit Construction

Superconducting Magnets for SIS 100 Collaboration: JINR (Dubna) Iron Dominated (window frame type) superferric design Maximum magnetic field: 2 T Ramp rate: 4 T/s Hollow-tube superconducting cable, indirectly cooled Two-phase helium cooling Collaboration: JINR (Dubna) Iron Dominated (window frame type) superferric design Maximum magnetic field: 2 T Ramp rate: 4 T/s Hollow-tube superconducting cable, indirectly cooled Two-phase helium cooling Nuclotron Dipole Improvement of DC-field quality 2D / 3D calculations Guarantee of long term mechanical stability (≥ 2  10 8 cycles ) concern: coil restraint in the gap, fatigue of the conductor Reduction of eddy / persistent current effects (field, losses) Improvement of DC-field quality 2D / 3D calculations Guarantee of long term mechanical stability (≥ 2  10 8 cycles ) concern: coil restraint in the gap, fatigue of the conductor Reduction of eddy / persistent current effects (field, losses)

Collaborations at Large Setups Hadron Physics with Antiproton Beams Physics of Nuclear Matter CBM Collaboration (W.Mueller)PANDA Collaboration (H. Orth) Nuclear Structure, Astrophysics,Reactions NUSTAR Collaboration Super FRS

PAC on QCD: ASSIA Study of Spin-dependent Interactions with AntiprotonsR.Bertini Torino CBM Compressed Baryonic Matter ExperimentP.SengerGSI DIRAC Tests of Low Energy QCDL.NemenovJINR Dubna PANDA Strong Interaction Studies with AntiprotonsU.WiednerTSL Uppsala PAX Antiproton-Proton Scattering Experiments with PolarizationF.RathmannFZJ PAC on Atomic Physics, Plasma Physics and Applications (APPA-PAC): Laser Cooling of Highly Charged Ions at SIS 100/300U. SchrammLMU FLAIR - A Facility for Low-energy Antiproton and Ion ResearchE. Wiedman Tokyo Anti-deuteron Breeding in a Double Ring ColliderW. Oehlert FZ-Jülich SPARC Stored Particles in Atomic physics ResearchR. SchuchStockholm HEDGEHOB: High Energy Density matter GEenerated by Heavy-iOn BeamsD. Varentsov Darmstadt Applications of Relativistic Ions in Radiobiology and Space ResearchM. DuranteNapoli Materials Research with Relativistic Heavy Ion BeamsS. KlaumünzerHMI Radiative Properties of Warm Dense MatterF. B. RosmejMarseille Letters of Intent (LoI) 834 users 505 users

Letters of Intent (LoI) PAC on Nuclear Structure and Nuclear Astrophysics (NUSTAR-PAC): 1.) Low Energy Branch (LEB).Scheidenberger GSI High-resolution In-Flight Spectroscopy (HISPEC)J. Gerl GSI Decay Spectroscopy with Implanted Ion Beams (DESPEC)J. Woods Edinburgh Precision Measurements of very short-lived Nuclei using an Advanced Trapping System for highly-charged Ions (MATS)K.Blaum Mainz LASER Spectroscopy for the Study of Nuclear Properties (LASPEC)W.Nörtershäuser GSI Neutron Capture Measurements (NCAP)M.Heil FZK Antiprotonic Radioactive Nuclides (Exo+pbar)M. Wada Riken 2.) High Energy Branch (R3B) A Universal Setup for Kinematical Complete Measurements of Reactions with Relativistic Radioactive Beams (R3B)T. Aumann GSI 3.) Ring Branch (STORIB) Study of Isomeric Beams, Lifetimes and Masses (ILIMA)Y.Novikov SPNPI Exotic Nuclei Studied in Light-Ion Induced Reactions at the NESR Storage Ring (EXL)H. Emling GSI Electron-Ion Scattering in a Storage Ring (e-A Collider) (ELISe)H. Simon GSI Antiproton-Ion Collider: A Tool for the Measurement of Neutron and Proton rms radii of Stable and Radioactive Nuclei (pbarA)P. Kienle TUM Spectroscopy of Pionic Atoms with Unstable Nuclei (PIONIC)K. Itahashi Riken 619 users

JINR Participation in FAIR R&D Accelerators VBLHE-Laboratory of High Energy, LPP-Laboratory of Particle Physics, LNP-Laboratory of Nuclear Problems, LIT-Laboratory of Information Technology QCD CBM BLHE-Laboratory of High Energy, LPP-Laboratory of Particle Physics, LIT-Laboratory of Information Technology ASSIA Laboratory of Nuclear Problems PANDA VBLHE-Laboratory of High Energy, LPP-Laboratory of Particle Physics, LIT-Laboratory of Information Technology PAX LNP-Laboratory of Nuclear Problems, LPP-Laboratory of Particle Physics NUSTAR R3B Bogoliubov Laboratory of Theoretical Physics EXL FLNR- Flerov Laboratory of Nuclear Reactions ELISe LNP- Laboratory for Nuclear Problems, FLNR- Flerov Laboratory of Nuclear Reactions APPA Biology + Space Division of Radiation and Radiobiological Research

NUSTAR: NUclear STructure and Astrophysics Reactions  Proton-neutron asymmetric matter  Loosely bound nucleons  Correlations  Large proton numbers New phenomena:  New shells  New decay modes GSI Proposal 2002  Decay studies  Reactions in reversed kinematics  Precision experiments in a storage-ring  Medium dependence of Nucleon-nucleon interaction Neutron skins and halos 

The NUSTAR-Facility The NUSTAR-Facility Phase 1

Layout and Design Parameters of the Super-FRS Technical challenges: target, beam dump, and Pre-Separator The performance can be directly taken from the experience with the FRS Technical challenges: target, beam dump, and Pre-Separator The performance can be directly taken from the experience with the FRS Super – conducting FRagment Separator H. Geissel

Target for slow extraction Rotating carbon wheel (PSI design, G. Heidenreich) Vertical plug handling concept Temperature profile after 150s (T<1000k) K. Sümmerer

Pre-Separator Optical Design Previous New design for high radiation Can the magnets stay superconducting after the target and beam dumps? Additional focal plane PreviouslyPresently H. Geissel, M. Winkler

Energy deposition calculation with PHITS Energy deposition calculation with PHITS Projectile: 1500 MeV/u 238 U /s σ p /p = 0.5% σ y = 2.0 mm σ x = 1.0 mm Energy deposition distribution on the quadrupole surface avarage energy deposition on the coil surface: E>/M= 0.2 mJ/g limit: 2-3 mJ/g H. Iwase First Quadrupole (after Target)

R3B: Reactions with Relativistic Radioactive Beams Particle detectors Neutron wall Target with calorimeters Superconducting dipole T.Aumann

The Storage Ring System as used for Structure Investigations RESR deceleration (1T/s) to MeV/u C R bunch rotation, adiabatic de-bunching, fast stochastic cooling, isochronous mode e-A Collider small electron ring from Super-FRS (up to 10 9 fragments per cycle at 740 MeV/u) H. Weick NESR electron cooling, deceleration to 4 Mev/u internal target

Target-Recoil and Gamma Detector around internal target Target-Recoil and Gamma Detector around internal target NESR P. Egelhof EXL: Exotic Nuclei Studied in Light-Ion Induced Reactions at NESR Internal target

The Electron-Ion (eA) Collider Electrons, a new probe for structure investigations of unstable nuclei Electrons, a new probe for structure investigations of unstable nuclei H. Simon Idea and first common studies from JINR (Oganessian, Meshkov, TerAkopian Idea and first common studies from JINR (Oganessian, Meshkov, TerAkopian JINR: UHV detectors Electron spectrometer  p/p=10 -4 gap 25 cm weight 90 t Electron spectrometer  p/p=10 -4 gap 25 cm weight 90 t

Conclusion GSi profited from JINR ideas and developments FAIR will profit from the intellectual input and expertise of JINR scientists LOIs and collaborations are open to be joined by new interested members