FF-LYNX (*): Fast and Flexible protocols and interfaces for data transmission and distribution of clock, trigger and control signals (*) project funded.

Slides:



Advertisements
Similar presentations
TileCal Optical Multiplexer Board 9U VME Prototype Cristobal Cuenca Almenar IFIC (Universitat de Valencia-CSIC)
Advertisements

Token Bit Manager for the CMS Pixel Readout
E-link IP for FE ASICs VFAT3/GdSP ASIC design meeting 19/07/2011.
GEM Design Plans Jason Gilmore TAMU Workshop 1 Oct
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS) Orsay, France Calorimeter upgrade meeting Olivier Duarte Upgrade calo FE review Comments : Digital.
FF-LYNX R. Castaldi, G. Magazzù, P. G. Verdini INFN – Sezione di Pisa G. Bianchi, L. Fanucci, S. Saponara, C. Tongiani Dipartimento di Ingegneria della.
CMS Upgrade Workshop November Fermilab POWER DISTRIBUTION SYSTEM STUDIES FOR THE CMS TRACKER Fermilab,University of Iowa and University of Mississippi.
Readout of DC coupled double sided sensors with CBMXYTER: Some first thoughts Peter Fischer, Heidelberg University.
Trigger Supervisor (TS) J. William Gu Data Acquisition Group 1.TS position in the system 2.First prototype TS 3.TS functions 4.TS test status.
Calorimeter upgrade meeting - Wednesday, 11 December 2013 LHCb Calorimeter Upgrade : CROC board architecture overview ECAL-HCAL font-end crate  Short.
Gunther Haller SiD LOI Meeting March 2, LOI Content: Electronics and DAQ Gunther Haller Research Engineering Group.
The ALICE Silicon Pixel Detector Gianfranco Segato Dipartimento di Fisica Università di Padova and INFN for the ALICE Collaboration A barrel of two layers.
CHIPIX65/RD53 collaboration
U N C L A S S I F I E D FVTX Detector Readout Concept S. Butsyk For LANL P-25 group.
Understanding Data Acquisition System for N- XYTER.
Leo Greiner IPHC meeting HFT PIXEL DAQ Prototype Testing.
M. Lo Vetere 1,2, S. Minutoli 1, E. Robutti 1 1 I.N.F.N Genova, via Dodecaneso, GENOVA (Italy); 2 University of GENOVA (Italy) The TOTEM T1.
The GBT A single link for Timing, Trigger, Slow Control and DAQ in experiments A. Marchioro CERN/PH-MIC.
C.Schrader; Oct 2008, CBM Collaboration Meeting, Dubna, Russia R/O concept of the MVD demonstrator C.Schrader, S. Amar-Youcef, A. Büdenbender, M. Deveaux,
1 “Fast FPGA-based trigger and data acquisition system for the CERN experiment NA62: architecture and algorithms” Authors G. Collazuol(a), S. Galeotti(b),
Bart Hommels Univeristy of Cambridge EUDET Annual Meeting, Ecole Polytechnique, Paris JRA3: DAQ Overview Objectives System Overview Status of.
David Bailey University of Manchester. Overview Aim to develop a generic system –Maximise use of off-the-shelf commercial components Reduce as far as.
Evaluation of the Optical Link Card for the Phase II Upgrade of TileCal Detector F. Carrió 1, V. Castillo 2, A. Ferrer 2, V. González 1, E. Higón 2, C.
A.A. Grillo SCIPP-UCSC ATLAS 10-Nov Thoughts on Data Transmission US-ATLAS Upgrade R&D Meeting UCSC 10-Nov-2005 A. A. Grillo SCIPP – UCSC.
Leo Greiner IPHC DAQ Readout for the PIXEL detector for the Heavy Flavor Tracker upgrade at STAR.
23 February 2004 Christos Zamantzas 1 LHC Beam Loss Monitor Design Considerations: Digital Parts at the Tunnel Internal Review.
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
GBT, an integrated solution for data transmission and TTC distribution in the SLHC Perugia, 17 May 2006 A. Marchioro, P. Moreira, G. Papotti CERN PH-MIC.
CMX status and plans Yuri Ermoline for the MSU group Level-1 Calorimeter Trigger Joint Meeting CERN, October 2012,
BTeV Pixel Detector Optical link receiver chip Data In and Out project.
Features of the new Alibava firmware: 1. Universal for laboratory use (readout of stand-alone detector via USB interface) and for the telescope readout.
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
Common ATLAS/CMS Electronics Workshop March, 2007 W. Dabrowski Atlas ABCNext/SiGe W. Dabrowski Faculty of Physics and Applied Computer Science AGH.
FPGA firmware of DC5 FEE. Outline List of issue Data loss issue Command error issue (DCM to FEM) Command lost issue (PC with USB connection to GANDALF)
December 14, 2006Anuj K. Purwar1 Design proposal for Read Out Card (ROC) Anuj K. Purwar December 14, 2006 Nevis Meeting.
LHCb front-end electronics and its interface to the DAQ.
Valerio Re, Massimo Manghisoni Università di Bergamo and INFN, Pavia, Italy Jim Hoff, Abderrezak Mekkaoui, Raymond Yarema Fermi National Accelerator Laboratory.
The GBT, a Proposed Architecture for Multi-Gb/s Data Transmission in High Energy Physics P. Moreira CERN – Geneva, Switzerland Topic Workshop on Electronics.
Transfering Trigger Data to USA15 V. Polychonakos, BNL.
FVTX Electronics (WBS 1.5.2, 1.5.3) Sergey Butsyk University of New Mexico Sergey Butsyk DOE FVTX review
Links from experiments to DAQ systems Jorgen Christiansen PH-ESE 1.
5 Gbps J. SMU 1 A Serializer for LAr Front-end electronics upgrade 1.Requirements and design philosophy. 2.Key features of the serializer.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
Jorgen Christiansen, CERN PH-ESE 1.  EPIX ITN proposal did not get requested EU funding ◦ CERN based proposals did very bad this time. ◦ I better not.
RD53 1.  Full/large demonstrator chip submission ◦ When: 2016 A.Early 2016: If chip must have been fully demonstrated in test beams for TDRs to be made.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
FPGA based signal processing for the LHCb Vertex detector and Silicon Tracker Guido Haefeli EPFL, Lausanne Vertex 2005 November 7-11, 2005 Chuzenji Lake,
DHH Status Igor Konorov TUM, Physics Department, E18 PXD DAQ workshop Münzenberg –June 9-10, 2011.
Firmware and Software for the PPM DU S. Anvar, H. Le Provost, Y.Moudden, F. Louis, E.Zonca – CEA Saclay IRFU – Amsterdam/NIKHEF, 2011 March 30.
The Data Handling Hybrid Igor Konorov TUM Physics Department E18.
CHEP 2010, October 2010, Taipei, Taiwan 1 18 th International Conference on Computing in High Energy and Nuclear Physics This research project has.
Off-Detector Processing for Phase II Track Trigger Ulrich Heintz (Brown University) for U.H., M. Narain (Brown U) M. Johnson, R. Lipton (Fermilab) E. Hazen,
Freescale™ and the Freescale logo are trademarks of Freescale Semiconductor, Inc. All other product or service names are the property of their respective.
E. Hazen1 MicroTCA for HCAL and CMS Review / Status E. Hazen - Boston University for the CMS Collaboration.
The design of fast analog channels for the readout of strip detectors in the inner layers of the SuperB SVT 1 INFN Sezione di Pavia I Pavia, Italy.
FF-LYNX: 2010 & H Luca Fanucci Pisa, 14 Giugno 2011.
Use of FPGA for dataflow Filippo Costa ALICE O2 CERN
The Jülich Digital Readout System for PANDA Developments
DAQ and TTC Integration For MicroTCA in CMS
FF-LYNX Overview FF-LYNX Interfaces FF-LYNX Protocol
CALICE DAQ Developments
Control of ASICs via GBTx
Possible contribution of Pisa on pixel electronics R&D
Readout System of the CMS Pixel Detector
Electronics, Trigger and DAQ for SuperB
FF-LYNX (*): Fast and Flexible Electrical Links for Data Acquisition and Distribution of timing, trigger and control signals in future High Energy Physics.
The digital read-out for the CSC system of the TOTEM experiment at LHC
SVT detector electronics
The digital read-out for the CSC system of the TOTEM experiment at LHC
SVT detector electronics
Presentation transcript:

FF-LYNX (*): Fast and Flexible protocols and interfaces for data transmission and distribution of clock, trigger and control signals (*) project funded by the INFN 5 th Commission R. Castaldi, G. Magazzù, P. G. Verdini INFN – Sezione di Pisa G. Bianchi, L. Fanucci, S. Saponara, C. Tongiani Dipartimento di Ingegneria della Informazione (DII-EIT) - Università di Pisa

G.Magazzù - INFN Pisa2 FF-LYNX: project genesis Common requirements in future High Energy Physics (HEP) experiments on distribution of Timing, Trigger and Control (TTC) signals and Data Acquisition (DAQ): – trigger latency – data-rates – flexibility w. r. t. working conditions and system architectures – robustness against effects of transmission errors and component failures – radiation hardness – power dissipation – material budget – …

G.Magazzù - INFN Pisa3 FF-LYNX: project goals Definition of a “standard” and “flexible” protocol for the integrated distribution of TTC signals and DAQ Development of functional simulators to validate the protocol and evaluate the overall system performance under different hypotheses on sensor geometry, detector architecture and working conditions (inputs from HEP communities) Implementation of the protocol in custom low power and radiation tolerant digital interfaces designed and produced in a commercial CMOS technology (  130nm) Test and characterization (including irradiation tests) of the interface prototypes and development of a library of IP-Cores accessible to designers of ICs for the future experiments

G.Magazzù - INFN Pisa4 FF-LYNX: key features Integrated distribution of TTC signals and DAQ: – transmission of TTC and DAQ data handled by the same protocol and the same hardware components – no more Trigger encoded with missing clock pulses – no more “slow control” protocols or “custom” fast control protocols Robustness of critical data w.r.t. transmission errors “General purpose” structure of data frames (i.e.: transparent w.r.t. data types) Easy coupling of FF-LYNX interfaces with “host” ASIC cores (serial and parallel ports) Flexibility with respect to system architecture (e.g.: Point-To-Point, Ring) Supporting different (standard or custom) link technologies (e.g.: LVDS) Supporting different link speeds: 160 or 320 Mbps in the Down-Link (toward the detector) and 80, 160, 320 or 640 Mbps in the Up-Link (from the detector)

G.Magazzù - INFN Pisa5 FF-LYNX: TTC & DAQ Triggers, Headers and Sync commands and data frames share the same link 4 or 8 bits transmitted in each 40MHz clock cycle (160 or 320 Mbps) 2 bits for Trigger, Headers and Sync commands (THS), 2/6 bits for frames (FRM) Triggers transmitted with the highest priority (constant latency)

G.Magazzù - INFN Pisa6 FF-LYNX: frame structure Frame structure transparent with respect to payload Header (HDR): “error robust” 6-bit encoding Frame Length and Type (FLT): Hamming 4/8 encoding (number of 16-bit words – 0 to 7, Label On/Off) Label: 16-bit label associated to the payload (e.g.: time stamp for raw data that can be used in data concentrators with event building capabilities to merge data associated to the same trigger and generated by different Front-End ASICs) Payload: commands, raw data (e.g.: hit data associated to triggers), trigger data (subset of hit data – e.g.: coordinate of strip clusters – that could be used in trigger generation), configuration and monitoring data (e.g.: current values of configuration registers) CRC: optional CRC on the payload Possible frame payload: 3 byte I 2 C command

G.Magazzù - INFN Pisa7 FF-LYNX: flexibility Point-To-Point architecture: Front-End ASICs are directly connected to Electrical to Optical Converters (EOCs) or Data Concentrator (DC) ASICs DC ASICs merge data streams and eventually perform event building and distribute TTC signals to groups of Front-End ASICs Clock, Trigger and Commands are distributed in parallel to Front-End ASICs through Down- Links, data are acquired in parallel through Up-Links Ring architecture: Front-End ASIC are daisy chained with redundant connections to provide robustness against component failures Trigger and Commands propagate along the chain (highest priority to Triggers) and Data Concentration (Event Building) is distributed along the chain No distinction between Down-Links and Up- Links The FF-LYNX protocol is compatible with both Point-To-Point and Ring architectures

G.Magazzù - INFN Pisa8 FF-LYNX: applications (1/4) Phase I upgrade of the CMS pixel detector: FF-LYNX based TTC distribution and DAQ with trigger based individual ROC readout  4  160 Mbps optical fibers available for DAQ and reduced latency of data readout data (w.r.t. token based readout) Expected data rates for Phase I (inner layer): 40 Mbps from each ROC, 6÷16 hit ROCs/module  240 ÷ 640 Mbps from each module (16 ROCs).

G.Magazzù - INFN Pisa9 FF-LYNX: applications (2/4) Phase II upgrade of the CMS pixel detector: two 640 Mbps electrical links from each ROC; two uplink optical fiber (≥ 1.6 Gbps) for each 4-ROC module and one downlink optical fiber optionally shared among several modules. Expected data rates for Phase II (inner layer): 800 Mbps from each ROC, up to 3.2 Gbps from each module (4 ROCs).

G.Magazzù - INFN Pisa10 FF-LYNX: applications (3/4) Phase II upgrade of the CMS Strip Tracker (no trigger data readout): daisy chains of Front-End ASICs within the modules and, optionally, daisy chain of modules. Expected data rate for raw data, at r = 78 cm: 5 Mbps/FE chip  40 Mbps/module.

G.Magazzù - INFN Pisa11 FF-LYNX: applications (4/4) Phase II upgrade of the CMS Strip Tracker (trigger data readout and embedded trigger processors): data concentrators in the modules and high speed links between modules and trigger processors. Expected data rate for trigger data, at r = 78 cm: 120 Mbps/FE chip  960 Mbps/module.

G.Magazzù - INFN Pisa12 FF-LYNX: current status Preliminary phase of the analysis of the system requirements completed First version of a test bench for functional simulations (based on the current control and readout system of the CMS pixel detector) completed and operational Preliminary protocol and interface architecture (based on inputs so far received from CMS and Atlas) drafted and open to further refinements First VHDL models of the building blocks of the interfaces (synchronization block, trigger scheduler) developed and validated Analysis of different solutions to increase robustness against SEEs (triple redundancy, “SEU robust” encoding of FSM states, use of “ghost” registers) ongoing Tentative architecture of the test circuit TC1 defined Technology (e.g.: I/O libraries and PLL for TC1) survey under way

G.Magazzù - INFN Pisa13 FF-LYNX: short term plans The proposal for a CMS R&D activity (F3-LYNX) will be submitted soon: the draft of the proposal is currently reviewed by the members of the collaboration (extended w.r.t. FF-LYNX – UCSB, …) Physicists involved in physics simulations based on new detector architectures (UCSB) and in the design of future Front-End ASICs (PSI, IC) will provide guidelines for improving the protocol, the interface architecture and the system simulators The development of a “proof of concept” FPGA based prototype and relative “test bed” will be completed in summer 2009 The design of the test circuit TC1 will be completed: the submission is foreseen in fall 2009

G.Magazzù - INFN Pisa14 Acknowledgments Thanks for fruitful discussions and support to: R. Horisberger, H. C. Kaestli (PSI) G. Hall, M. Raymond (IC) J. Incandela (UCSB) R. Beccherle (INFN-GE) F. Palla, A. Messineo (INFN-PI) We appreciate comments and suggestions from … potential FF-LYNX users: