The commissioning of Virgo and GEO The link with N5-WG1 G.Losurdo – INFN Florence H.Grote – AEI Hannover on behalf of N5-WG1.

Slides:



Advertisements
Similar presentations
19. October 2004 A. Freise Automatic Alignment using the Anderson Technique A. Freise European Gravitational Observatory Roma
Advertisements

Status of the Virgo Commissioning G.Losurdo – INFN Firenze/Urbino for the Virgo Collaboration.
September 21, 2005Virgo Status – ESF Workshop1 Status of Virgo B. Mours.
VIRGO: WHERE WE COME FROM WHERE WE ARE GOING GIOVANNI LOSURDO - INFN Firenze Advanced Virgo Project Leader for the Virgo Collaboration (and the LIGO Scientific.
Cascina, January 24, 2005 Status of GEO600 Joshua Smith for the GEO600 team.
1 Virgo commissioning status M.Barsuglia LAL Orsay.
F. Frasconi I.N.F.N. Pisa for the Virgo Collaboration TAUP2007 Sendai, September 11-15, 2007 VIRGO EXPERIMENT VIRGO: a large interferometer for Gravitational.
1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.
rd ILIAS-GW annual general meeting 1 VIRGO Commissioning progress J. Marque (EGO)
COMMISSIONING PROGRESS G.LOSURDO – INFN Firenze for the Virgo Collaboration.
N5 – WP1: Status and perspectives G.Losurdo – INFN Firenze/Urbino H.Grote – AEI Hannover.
Report From Joint Run Planning Committee R. Passaquieti & F. Raab - LSC / VIRGO Collaboration Meeting rd July 2007 – LIGO-G Z.
Virgo Control Noise Reduction
Max-Planck-Institut für Gravitationsphysik (Albert-Einstein-Institut) Institut für Atom- und Molekülphysik Detector Characterization of GEO 600 during.
1 Ist Virgo+ review Cascina H. Heitmann Alignment: Virgo+ changes.
Status of Virgo Gabriele Vajente INFN Pisa and Scuola Normale Superiore di Pisa On behalf of the Virgo Collaboration 11 th Gravitational Wave Data Analysis.
Andreas Freise ILIAS WG1 Meeting CERN (29-Mar-07) GEO 600 Simulation Group.
Optical Configuration Advanced Virgo Review Andreas Freise for the OSD subsystem.
Interferometer Control Matt Evans …talk mostly taken from…
March 17, 2008LSC-Virgo meeting1/12 Virgo Status B. Mours.
Summary and Plans for the WG3 activity H.Lück, M.Punturo.
Paris, July 17, 2009 RECENT RESULTS OF THE IGEC2 COLLABORATION SEARCH FOR GRAVITATIONAL WAVE BURST Massimo Visco on behalf of the IGEC2 Collaboration.
1 1.ISC scope and activities 2.Initial Virgo status 3.Design requirements 4.Reference solution and design status 5.Plans toward completion 6.Technical.
The status of Giovanni Losurdo - INFN Firenze-Urbino on behalf of the Virgo Collaboration Workshop on GW detection– Gingin, Oct. 4-7, 2005.
Virgo Commissioning update Gabriele Vajente for the Virgo Collaboration LSC/VIRGO Meeting – MIT 2007, July LIGO-G Z.
Paris, November 5th, ILIAS/N5: The GW antenna network Raffaele Flaminio EGO and LAPP/CNRS Summary - History - GWA Objectives & Contents - Management.
3 May 2011 VESF DA schoolD. Verkindt 1 Didier Verkindt Virgo-LAPP CNRS - Université de Savoie VESF Data Analysis School Data Quality and vetos.
Gabriele Vajente ILIAS WG1 meeting - Perugia Couplings of angular noises into dark fringe Diffused light studies.
Environmental noise studies at VIRGO Environmental contributions to Virgo readout noise (C-runs) many sources identified through coherency analyses with.
Status of Virgo A. Viceré INFN-Firenze – Università di Urbino.
1 Virgo commissioning: Next steps December 12 st 2005 Hannover, ILIAS-GWA WG1 Matteo Barsuglia, LAL/CNRS.
Summary and plans for the WG1 activity H.Grote – AEI Hannover G.Losurdo – INFN Firenze/Urbino Explorer Nautilus Virgo.
JRA3 STREGA - Introduction Geppo Cagnoli IGR – University of Glasgow ILIAS-GW Meeting, Orsay, 5 th -6 th Nov 2004.
GWA-WG1 G.Losurdo – INFN Florence H.Grote – AEI Hannover on behalf of WG1.
1 Virgo Commissioning progress ILIAS, Nov 13 th 2006 Matteo Barsuglia on behalf of the Commissioning Team.
1 Feedback from the executive committee meeting Benno Willke GEO meeting, Glasgow October 2006.
GWDAW11, Postdam 18th-21th December 2006 E. Cuoco, on behalf of Virgo collaboration 1 “Data quality studies for burst analysis of Virgo data acquired during.
Status of coalescing binaries search activities in Virgo GWDAW 11 Status of coalescing binaries search activities in Virgo GWDAW Dec 2006 Leone.
Paolo La Penna ILIAS N5-WP1 meeting Noise analysis in Virgo Cascina, 7-8 July 2004 Analysis of noise in VIRGO.
Status of VIRGO Lisa Barsotti - University and INFN Pisa – on behalf of the VIRGO collaboration ANNECY - December 15 th, 2004  Status of the Commissioning.
LIGO-G D 1 Status of Detector Commissioning LSC Meeting, March 2001 Nergis Mavalvala California Institute of Technology.
M. Mantovani, ILIAS Meeting 7 April 2005 Hannover Linear Alignment System for the VIRGO Interferometer M. Mantovani, A. Freise, J. Marque, G. Vajente.
The status of VIRGO Edwige Tournefier (LAPP-Annecy ) for the VIRGO Collaboration HEP2005, 21st- 27th July 2005 The VIRGO experiment and detection of.
1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.
WG3 Report Michele Punturo Harald Lück. WG3 composition Co-Chairmen M.Punturo INFN Perugia, Italy H.Lück MPI für Gravitationsphysik, AEI, Hannover, Germany.
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, July 2004 VIRGO commissioning progress report.
M. Mantovani ILIAS Cascina March 2008 Automatic Alignment system Improvements after the VSR1 M. Mantovani for the Alignment team.
International Gravitational Wave Network 11/9/2008 Building an Stefan Ballmer, for the LIGO / VIRGO Scientific Collaboration LIGO G
LIGO-G M LIGO Status Gary Sanders GWIC Meeting Perth July 2001.
Gabriele Vajente ILIAS WG1 meeting - Frascati Noise Analysis Tools at Virgo.
Status of Virgo GWDAW12 Status of Virgo GWDAW Dec Leone B. Bosi INFN and University of Perugia (Italy) On behalf of the Virgo Collaboration.
LIGO-G D Commissioning at Hanford Stan Whitcomb Program Advisory Committee 12 December 2000 LIGO Livingston Observatory.
Monica VarvellaIEEE - GW Workshop Roma, October 21, M.Varvella Virgo LAL Orsay / LIGO CalTech Time-domain model for AdvLIGO Interferometer Gravitational.
Advanced Towards Advanced Virgo Giovanni Losurdo – INFN Firenze Advanced Virgo Coordinator on behalf of the Virgo Collaboration.
Sensitivity of Virgo E. Tournefier (LAPP-CNRS) LSC-Virgo week May 23 rd,2007 LIGO-G Z.
GEO Status and Prospects Harald Lück ILIAS / ETmeeting Cascina November 2008.
MG 11 - Berlin Virgo status Marie-Anne Bizouard (LAL-Orsay) on behalf of the Virgo Collaboration.
1 The status of VIRGO E. Tournefier LAPP(Annecy)-IN2P3-CNRS Journées SF2A, Strasbourg 27 juin – 1er juillet 2005 The VIRGO experiment The commissioning.
Edwige Tournefier for the Virgo Collaboration The status of Virgo.
ILIAS-GWA WP1 BUILDING UP THE EUROPEAN GW COMMUNITY
(Some) noise hunting issues at Virgo
Virgo Status Detector Status Computing Data Analysis status and Plans
Status of Virgo GWDAW Dec 13-16
Homodyne readout of an interferometer with Signal Recycling
GEO – VIRGO joint noise hunting project
Virgo Update – LSC meeting
WG3 Activities M.Punturo & H.Lueck WG3 - 4th ILIAS GW meeting.
The views of Virgo collaboration groups on upgraded/advanced Virgo
Alignment Investigations towards Advanced Virgo
Status at the Prague meeting
Presentation transcript:

The commissioning of Virgo and GEO The link with N5-WG1 G.Losurdo – INFN Florence H.Grote – AEI Hannover on behalf of N5-WG1

ILIAS Annual Meeting - Chambery, Feb. 27th, 2007 G.Losurdo – INFN Firenze 2/19 GW detection in Europe Interferometers GEO600 – D/UK Hannover Virgo – F/I/NL Cascina (PI), EGO Resonant detectors Auriga – I Legnaro (PD) Explorer – I CERN Nautilus – I Frascati (RM)

ILIAS Annual Meeting - Chambery, Feb. 27th, 2007 G.Losurdo – INFN Firenze 3/19 Detector plans LSC-Virgo MoU for data exchange and joint analysis Run Commissioning S5 Commissioning

ILIAS Annual Meeting - Chambery, Feb. 27th, 2007 G.Losurdo – INFN Firenze 4/19 GEO600 in LSC-S5  Instrumental duty cycle: 94.3 %  Science time duty cycle: 91.0 %  Longest lock: 102 hrs  Good stationarity Inst. duty cycle [%] May 1 - Oct 15: 168 days days Histogram of sensitivities (BLRMS Hz) May-September

ILIAS Annual Meeting - Chambery, Feb. 27th, 2007 G.Losurdo – INFN Firenze 5/19 After S5 Continue commissioning (at least until spring 2007) to:  improve sensitivity  allow long term operation  understand better the noise sources GEO runs in overnight/weekend mode since Oct 15 What next?  Re-join S5 until its end or commissioning until end 2007?  Stay on run during 2008  Sequential upgrades starting 2009

ILIAS Annual Meeting - Chambery, Feb. 27th, 2007 G.Losurdo – INFN Firenze 6/19 Virgo last year  Work on several issues aimed to –improve robustness –improve sensitivity –understand fully the noise  Weekly Science Runs (WSR): detector taking data during some weekends. Nine WSRs held so far

ILIAS Annual Meeting - Chambery, Feb. 27th, 2007 G.Losurdo – INFN Firenze 7/19 Detector progress Main actions  Reduction of longitudinal control noise  Reduction of scattered light effects  Improvements of the interferometer controls WSR 1 – Sep 06 WSR 8 – Feb 07 SENSITIVITY WSR 5 – Nov 06 WSR 7 – Jan 07 GAUSSIANITY STABILITY 55.5 hrs lock interferometer power

ILIAS Annual Meeting - Chambery, Feb. 27th, 2007 G.Losurdo – INFN Firenze 8/19 WSRn: towards S5 WSR #dateduty cycle (% locked) 1Sep 8-11, Sep 22-25, Oct 6-9, 2006cancelled 4Oct 13-16, 2006cancelled 5Nov 10-13, Dec 1-4, Jan 12-15, Feb 9-12, Feb 17-19, Commissioning going on Planned start of the long science run: May 18th

ILIAS Annual Meeting - Chambery, Feb. 27th, 2007 G.Losurdo – INFN Firenze 9/19 Noise hunting  Noise not completely understod.  Noise hunting going on on both detectors  Collaboration going on in WG1 to face common problems mark the gap between the understood noise and the measured one

The role of N5-WG1

ILIAS Annual Meeting - Chambery, Feb. 27th, 2007 G.Losurdo – INFN Firenze 11/19 N5-WG1 - the mission  Objectives –To speed up the commissioning and the characterization of Virgo and GEO by means of a deeper collaboration between the two teams –To develop common methods of characterization of interferometric GW detectors to be applied to Virgo and GEO –To suggest short term improvements of the existing interferometric detectors on the base of the commissioning experience  Activity: – face-to-face meetings: detectors status overview, commissioning issues, “hot topic” – parallel projects: joint work on specific commissioning topics performed by smaller groups –visits to labs and detector sites, control room sessions

ILIAS Annual Meeting - Chambery, Feb. 27th, 2007 G.Losurdo – INFN Firenze 12/19 N5-WG1 – the group GEO600 A.Freise S.Hild H.Grote (co-chair) G.Degaillaix H.Lueck J.Smith Virgo M.Barsuglia H. Heitmann P.La Penna G.Losurdo (co-chair) E.Tournefier Bar detectors L.Taffarello M.Visco Many others attending and giving talks… P.Ajith, L.Barsotti, V.Dattilo, M.Evans, I.Fiori, R.Gouaty, R.Flaminio, V.Iafolla, M.Mantovani, J.Marque, G.Mayer, G.Vajente, B.Willke, J.P.Zendri,…

ILIAS Annual Meeting - Chambery, Feb. 27th, 2007 G.Losurdo – INFN Firenze 13/19 N5-WG1 - Meetings held so far WG1 meetings 1st meeting1st meeting, Cascina, Jul nd meeting2nd meeting, Hannover, Sep rd meeting3rd meeting, Cascina, Jan th meeting4th meeting, Hannover, April th meeting5th meeting, Telecon, Jul th meeting6th meeting, Perugia, Sep th meeting7th meeting, Hannover, Dec th meeting8th meeting, Frascati, Mar th meeting9th meeting, Potsdam, Jul th meeting10th meeting, Cascina, Nov th meeting11th meeting, Hannover, Jan 23-24, th meeting, CERN, Mar 29-30, 2007 The windmills project 1st telecon1st telecon, May 12, 2005 Team meeting, Cascina, 7-9 June 2005 Seismic survey, GEO600 site, July nd telecon, August 25, 2005 Team meeting Seismic survey 2nd telecon The beam centering project 1st report1st report, Napoli-Cascina, June 10-14, 2005 The alignment simulation project 1st meeting1st meeting, Birmingham, August 2006 The joint noise hunting project 1st report1st report, Cascina, September nd report, Cascina, October rd report, Cascina, November th report, Cascina, January nd report 3rd report 4th report 5th report, Cascina, March 2007 PARALLEL PROJECTS environmental noise studies interferometer controls sensitivity studies

ILIAS Annual Meeting - Chambery, Feb. 27th, 2007 G.Losurdo – INFN Firenze 14/19 Common problems: stray light  Stray light (or scattered light) is an important noise source for all of the interferometric detectors, and is hard to foresee and modelize  Extremely small amounts of light power can cause significant problems  Diagnostics: –Search of spurious beams –Acoustic noise injections –Tapping/hammering tests  Noise reduction techniques: –New optical layouts for auxiliary beams –Larger/higher quality optics –AR-coated windows on photodiodes –Beam dumps Typical topic for WG1

ILIAS Annual Meeting - Chambery, Feb. 27th, 2007 G.Losurdo – INFN Firenze 15/19 The joint noise hunting project Common noise investigations – Virgo alignment noise projections – Virgo laser power noise investigations – GEO noise transfer functions simulation – General noise hunting at both sites – Knowledge exchange A 9 months post-doc fellowship granted. J.Smith (GEO) spent 25% of time at Virgo site Common algos/Software exchange – GEO algo for glitch parameterization implemented at Virgo – GEO data viewer used at Virgo to listen to “dark fringe music” and for off- line analysis of data

ILIAS Annual Meeting - Chambery, Feb. 27th, 2007 G.Losurdo – INFN Firenze 16/19 The joint noise hunting project How much is the alignment noise coupled with the GW channel?  Answer the questions by measuring noise projections  Method frequently discussed in WG1, now widely used on both detectors J. Smith - G. Vajente Virgo sensitivity Alignment noise contributions

ILIAS Annual Meeting - Chambery, Feb. 27th, 2007 G.Losurdo – INFN Firenze 17/19 The joint noise hunting project GEO glitch monitor available at Virgo. Precious “commissioning oriented” tool for understanding detector noise ― data quality ― detector noise characterization ― vetoing Every point is a glitch: an excess of power for some short period of time (tens of ms) and a narrow frequency band (tens of Hz) HACR at Virgo J. Smith - G. Vajente

ILIAS Annual Meeting - Chambery, Feb. 27th, 2007 G.Losurdo – INFN Firenze 18/19 The Windmills project  Costruction of two windmills stations near Virgo proposed. Concern for seismic disturbance  The wind park next to GEO600: chance to study the windmills seismic wave field in a soft soil similar to the Virgo one. –Seismic survey on GEO600 site using two stations run in coincidence –A model of noise spectral composition and soil attenuation was done and used to predict effects of the wind parks at Virgo. A safety distance of 5km from Virgo buildings was defined.  Positive reaction of both windmill companies, which modified projects layout to comply with our request.  Joint VIRGO-GEO600 document: VIR-NOT-PIS (I.Fiori L.Giordano S.Hild G.Losurdo E.Marchetti G.Mayer F.Paoletti)

ILIAS Annual Meeting - Chambery, Feb. 27th, 2007 G.Losurdo – INFN Firenze 19/19 Conclusion The networking activity N5-WG1 is having a real impact on the commissioning of Virgo and GEO600 WG1: intense activity linked to the commissioning of Virgo and GEO –Frequent face-to-face meetings –Parallel projects on defined topics –Joint noise hunting effort Today: a real collaboration among a group of young physicists has been established Tomorrow: the grown-up WG1 fellows may continue to collaborate and lead the effort for a new EUROPEAN detector

Spare slides

ILIAS Annual Meeting - Chambery, Feb. 27th, 2007 G.Losurdo – INFN Firenze 21/19 WG1: 4-years execution plan Annual report Recommandations report for short term improvements GEO/Virgo joint noise characterization YEAR Annual report GEO/Virgo joint noise characterization Implementation of common characterization algorithms YEAR Annual report Recommandations report for short term improvements GEO/Virgo joint noise characterization Development of common characterization algorithms YEAR Annual report Working group set-up GEO/Virgo noise sources comparison YEAR DELIVERABLESMILESTONES

ILIAS Annual Meeting - Chambery, Feb. 27th, 2007 G.Losurdo – INFN Firenze 22/19 The beam centering project  Centering of beam used for wavefront sensing on the quadrants is essential for the robustness of the alignment system  Virgo quadrants are centered with a low bandwidth (<0.3 Hz) control –Not enough to reduce rms considerably –Noisy system  GEO uses a commercial galvanometer scanner with custom mechanics and electronics.  Succesfully tested on Virgo: very good suppression of beam fluctuations Galvo off Galvo on R.De Rosa, L. Di Fiore, H.Grote, H.Heitmann, J.Marque,

ILIAS Annual Meeting - Chambery, Feb. 27th, 2007 G.Losurdo – INFN Firenze 23/19 The alignment optimization project  Sensing matrix optimization –Use the distribution of the matrix’ row vectors in the system's parameter space. Compute the separation of the diode signals in the space of the mirror angular movements.  Controllability: –Study of the dependence of the controllability of a simple system (a FP cavity using the Ward and the Anderson technique) on the parameters of the optical readout in order to validate and check the performance the chosen test method  Alignment noise propagation in Virgo under study VIRGO configuration : Result of the study on the controllability on a complex configuration as the VIRGO alignment system. The minimum separation between the 'best' sub-set of signal vectors is shown as a function of Gouy and demodulation phase (for the NE diodes). The chosen alignment control system can thus control all the required degrees of freedom and it can improved by tuning the parameters of the optical readouts. A.Freise, M.Mantovani

ILIAS Annual Meeting - Chambery, Feb. 27th, 2007 G.Losurdo – INFN Firenze 24/19 LIGO Commissioning started in Design sensitivity achieved. Detector technology demonstrated Commissioning started in Design sensitivity achieved. Detector technology demonstrated Long commissioning needed Challenging… but feasible

ILIAS Annual Meeting - Chambery, Feb. 27th, 2007 G.Losurdo – INFN Firenze 25/19 Virgo, GEO, LIGOs