EUM/PEPS/VWG/08/0122 Issue 1, 19/11/2008 Post-EPS Status at PMET-7.

Slides:



Advertisements
Similar presentations
ESWW4, 5-9 th November 2007 Draft Proposal: Space Weather as part of an Optional Space Situational Awareness Programme A.Glover, E. Daly, R. Marsden, A.
Advertisements

Space/GMES and Climate Change Mikko Strahlendorff, GMES Bureau.
The WMO Vision for Global Observing Systems in 2025 John Eyre, ET-EGOS Chair GCOS-WMO Workshop, Geneva, January 2011.
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO Barbara J. Ryan Director, WMO Space Programme.
ACC-VC Status and Issues – Continuity of Limb Sounding Richard Eckman NASA CEOS SIT-29 Meeting CNES, Toulouse, France 9 th -10 th April 2014.
1 6th GOES Users' Conference, Madison, Wisconsin, Nov 3-5 WMO Activities and Plans for Geostationary and Highly Elliptical Orbit Satellites Jérôme Lafeuille.
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO Inventory & Evaluation of Space-based Instruments:
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO Dr B. Bizzarri, Consultant WMO Space Programme.
CEOS-CGMS Working Group Climate, Darmstadt, Germany, 5-7 March 2014 Coordination Group for Meteorological Satellites - CGMS COORDINATION GROUP FOR METEOROLOGICAL.
10-Dec-2012-cesg-1 SLS-OPT: Optical Communications Working Group (1 of 6) Problem and Issues: None. However, schedule for standards publication is very.
1 State of play Robert Lowson EEA Kopernikus coordinator, GMES Bureau.
Polar Highly Elliptical / Molniya Orbit Science (PHEMOS) Mission Phase 0/A Studies Mid-Term Review Meetings January 12-14th, 2011.
WMO Space Programme, CBS Technical Conference1 Integrated Global Data Dissemination Service (IGDDS)
Priority Project Update PSSD-CIO Joint Council Meeting Lac Carling, May 28, 2003 Service Delivery to Business and Mapping.
© Crown copyright Met Office Instrumentation planned for MetOp-SG Bill Bell Satellite Radiance Assimilation Group Met Office.
UGDIE PROJECT MEETING Bled September WP6 – Assessment and Evaluation Evaluation Planning  Draft Evaluation plan.
Recent developments in the UNFCCC process in relation to global observations 4 th GTOS Steering Committee Paris, 1-2 December 2009 Rocio Lichte Programme.
1 Dr Reinhard Schulte-Braucks Head GMES Unit, DG ENTR, EC The role of Copernicus in Promoting the European Economy Geospatial World Forum Rotterdam, 16.
CAPACITY Final Presentation, 2 June 2005, ESTEC Operational Atmospheric Chemistry Monitoring Missions (“CAPACITY”) Final Presentation ESA-ESTEC, Noordwijk.
Slide: 1EUM/PPS/08/VWG/ October 2008 Programme Preparation 2 nd Post-EPS User Consultation Workshop Darmstadt, 3-4 February 2009 Lorenzo Sarlo.
Atlanta Public Schools Project Management Framework Proposed to the Atlanta Board of Education to Complete AdvancED/SACS “Required Actions” January 24,
EUM/SIR/VWG/12/0375, v1, 10 July 2012 Coordination Group for Meteorological Satellites - CGMS EUM/SIR/VWG/12/0375, v1, 10 July 2012 Coordination Group.
EUM/SIR/VWG/12/0375, v1, 10 July 2012 Coordination Group for Meteorological Satellites - CGMS EUM/SIR/VWG/12/0375, v1, 10 July 2012 Coordination Group.
EUM/PEPS/VWG/09/0012 Issue 1, 26/01/2009 Candidates for the Post-EPS Observation Missions, Prioritisation, and Preliminary Assessment.
1 st Workshop on space-based architecture for Climate, Geneva, January WMO Gap Analysis with respect to GCOS requirements Presented by B. Bizzarri.
28 th CEOS Plenary Session Alain Ratier EUMETSAT CEOS Plenary, Agenda Item 28 Tromsø, Norway October 2014.
28 th CEOS Plenary Session Position Paper and Recommended Way Forward for the LSI-VC Thomas Cecere, USGS Jonathon Ross, GA CEOS Plenary, Agenda Item 19.
CAPACITY Operational Atmospheric Chemistry Monitoring Missions CAPACITY Final Meeting - WP Ground Segment synthesis Final Meeting ESTEC02/06/05.
Slide: 1 Osamu Ochiai Water SBA Coordinator The GEO Water Strategy Report – The CEOS Contribution Presentation to the 26 th CEOS Plenary at Bengaluru,
CGMS lessons learned towards vibrant weather and climate monitoring Dr Tillmann Mohr – Former Director General EUMETSAT Dr Don Hinsman – Former Director.
26. GIST Meeting, RAL, Rainer Hollmann, DWD Vision for ERB-mission for post-EPS ? Post-EPS: Background MRD Priorities for different mission.
GEO Forest Carbon Tracking Outcomes in 2010 Per-Erik Skrøvseth (NSC) Osamu Ochiai (JAXA) Frank Martin Seifert (ESA) Ake Rosenqvist (for JAXA) CEOS Plenary,
GIST RMIB, Brussels; 8-10 November 2004 Page 1 Plans for EUMETSAT’s Third Generation Meteosat (MTG) Geostationary Satellite Program G. Fowler and.
CAPACITY Composition of the Atmosphere: Progress to Applications in the user CommunITY STUDY OVERVIEW AND LOGIC Michiel van Weele, KNMI Kick Off/ Negotiation.
GSFC GOES-R Notional End-To-End Architectures Satellite Direct Readout Conference for the Americas December 9 – 13, 2002 Miami, Florida Sandra Alba Cauffman.
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO WMO Space Programme UPDATE ON THE WMO DOSSIER.
Slide: 1 Status of EUMETSAT services, GODAE IGST meeting, 7-9 August 2007 GODAE IGST meeting, 7-9 August 2007 Status of EUMETSAT services in respect to.
GEO ADC meeting, Washington DC, USA, Sep Slide # 1 DA DA Virtual Constellations Ivan Petiteville, CEOS GEO ADC Meeting, Washington DC,
EUM/SAF/VWG/02/0010, Rev. 3, May 2003 Page 1 The SAF Network Concept and Status Juha-Pekka Luntama, EUMETSAT GRAS Mission Scientist
Diane E. Wickland NPP Program Scientist NPP Science: HQ Perspective on VIIRS May 18, 2011.
PoDAG XXI: SEEDS SEED: NSIDC Potential Interactions NSIDC DAAC should prepare an evaluation of their desired future roles in "core activities" and in mission.
AMS Annual Meeting, New Orleans, 2012, 8 th Symposium on Future Operational Environmental Satellite Systems Johannes Schmetz Head of Meteorological Division.
GEO Visit to EUMETSAT, 2 July MONITORING WEATHER AND CLIMATE FROM SPACE Overview of Current Satellite Operations GEO Visit – 2 July 2015.
Update on WE Space-based GOS for Weather Status May 2008.
23 rd CEOS Plenary I Phuket, Thailand I 3-5 November 2009 Co lead : Francois ParisotEUMETSAT Stan Wilson NOAA Ocean Surface Topography Constellation.
WMO OMM 9th Annual Symposium on Future Operational Environmental Satellite Systems, Austin, 10/01/20131 Information/training of prospective users –User.
E u r o p e a n C o m m i s s i o nCommunity Research Global Change and Ecosystems Malta, 27 January 2004 Alan Edwards EUROPEAN COMMISSION GMES – Implications.
US-Europe Data Exchange Meeting May Page 1 EUMETSAT Status Report Simon Elliott EUMETSAT Operations Department
Second GOES Users Conference, Boulder October 1-3, Issue B Page 1 ACTIVITIES TOWARDS USER REQUIREMENTS FOR POST-MSG by R. Stuhlmann GOES Users.
Towards an Architecture for Operational Monitoring for Climate Change from Space: NOAA’s Contribution Charles S. Baker Deputy Assistant Administrator NOAA.
3rd Helix Nebula Workshop on Interoperability among e-Infrastructures and Commercial Clouds Carmela ASERO, EGI.eu 17 September 2013, Madrid
Cloud-based e-science drivers for ESAs Sentinel Collaborative Ground Segment Kostas Koumandaros Greek Research & Technology Network Open Science retreat.
The ESA call for the 9 th Earth Explorer mission (EE9)
Ivan Čačić cirus. dhz.hr Državni hidrometeorološki zavod Ivan Čačić EUMETSAT Council Vice Chair Rising burden of higher membership fees (METOP.
NOAA, May 2014 Coordination Group for Meteorological Satellites - CGMS NOAA Activities toward Transitioning Mature R&D Missions to an Operational Status.
CGMS-42-WP-21, 28 April 2014 Coordination Group for Meteorological Satellites - CGMS Slide: 1 Main outcomes of the Ad-hoc Meeting on Space Weather CGMS-42,
Radio Occultation and IROWG Matters Presented to CGMS-42 WGII session, agenda item 7 Co-Chairs: Axel von Engeln (EUMETSAT), Dave Ector (UCAR)
METimage Calibration Pepe Phillips GSICS Data & Research Working
Fair Go Rates System Dr Ron Ben-David Chairperson
Background D/HSO Announcement of Opportunity (July 2011) in coordination with D/EOP soliciting scientific experiments for the International Space Station.
ESA EO Programmes after CM16 EOEP-5 Block 2
Meteosat Third Generation (MTG)
Update on WE Space-based GOS for Weather
NOAA Future Observing System Objectives
Preparations for post-2020 Impact Assessment European Commission Directorate General for Regional and Urban Policy Unit DGA Policy.
Fair Go Rates System Dr Ron Ben-David Chairperson
Pier Giorgio Marchetti, Philippe Mougnaud European Space Agency
DOD’S PHASED SYSTEM DEVELOPMENT PROCESS
SOCIAL DIALOGUE WITHIN THE SCOPE OF EUPAN
CEOS strategy for GFOI Phase 2
Presentation transcript:

EUM/PEPS/VWG/08/0122 Issue 1, 19/11/2008 Post-EPS Status at PMET-7

Slide: 2 EUM/PEPS/VWG/08/ /07/2008 Post-EPS Overall Programme Planning Phase BEUM Phase 0Phase A Readiness of IR and MW Sounding VIS/IR Imaging Missions Phase C/D All Post-EPS Missions Prep. Programme Development and Operation Programme EUMETSAT Approval Processes ESA Programme ESA Ministerial Conf. go ahead for phase B/C/D Ops 2021

Slide: 3 EUM/PEPS/VWG/08/ /07/ ESA C-Min-11 go-ahead for Ph. B/C/D Phase A ESA Ph. 0 Studies Ph. A Studies Prelim. Assessment Review (missions shortlist) Mission Definition Review EUM Approval of Preparatory Programme 2 nd User Cons. Workshop Preliminary Requirements Review 2011 MTR PCR MTR = Mid Term Review PCR = Preliminary Concepts Review EUM Phase 0 Post-EPS Programme Planning, Timeline Phases 0 and A

Slide: 4 EUM/PEPS/VWG/08/ /07/2008 Cooperation with NOAA on JPS (1/3) Regular meetings of the technical and high-level working groups are held with NOAA to work towards an extended cooperation past IJPS and JTA A concept paper has been drafted for negotiation of a JPS and is under approval by DB Model is similar to that of IJPS and JTA –NOAA spacecraft operate in early morning and afternoon orbits –EUMETSAT spacecraft operates in mid-morning orbit –Exchange of instruments as far as practicable –Collaboration on developments for data exploitation –Exchange of data Timeline –Draft JPS agreement finalised in Q –JPS agreement to EUMETSAT Council and US authorities at end of Phase A

Slide: 5 EUM/PEPS/VWG/08/ /07/2008 Cooperation with NOAA on JPS (2/3) InstrumentNotional Assignments Provider / Orbit05:30 d09:30 d13:30 a Visible/Infrared Imager NOAAXX EUMETSATX Infrared SounderEUMETSATXXX NOAAC3 CrIS Microwave SounderNOAAXXX Microwave ImagerNOAAXX Scatterometer NOAAXX EUMETSATX Ozone Monitoring EUMETSATX (S-5) NOAAC3 OMPS

Slide: 6 EUM/PEPS/VWG/08/ /07/2008 Cooperation with NOAA on JPS (3/3) InstrumentNotional Assignments Provider / Orbit05:30 d09:30 d13:30 a Aerosol EUMETSATX NOAAC3 APS Earth RadiationNOAAXX Solar IrradianceNOAAX Data CollectionNOAAXX EUMETSATX Space EnvironmentNOAAXXX Search and RescueNOAAXXX Radio OccultationNOAA/EUMETSATConstellations EUMETSATTBD

Slide: 7 EUM/PEPS/VWG/08/ /07/2008 Recent Council Decisions Relevant to Post-EPS (1/2) The opportunity of flying Earth observation payloads on the Iridium-NEXT constellation of satellites should not be pursued Adopted the initiating resolution on the preparation of a Jason follow-on programme, authorising the DG to prepare a full Jason2 follow-on optional programme proposal and a related declaration (to be adopted) –All 21 member states indicated their interest in participation –Funding scheme needs to be secured among partners before optional programme can be proposed Adopted way forward for the implementation of GMES Sentinel 5 on Post-EPS –Consider S-5 as PEPS baseline in terms of design and development –Rely on ESA provided S-5 ground processor –Manage delta-development within an optimised approach for GS procurement –Have full control of the overall process up to GS level and end-to-end system verification and validation –Discuss with EU about the necessary funding to cover operations costs of S-5

Slide: 8 EUM/PEPS/VWG/08/ /07/2008 Recent Council Decisions Relevant to Post-EPS (2/2) With respect to the GMES long-term governance EUMETSAT should play the role of operational agency in the areas of –GMES Marine Core Service –GMES Atmosphere Service –The planned GMES Service for Climate Monitoring During GMES pre-operations, access by the three GMES fast track services and two pilot services to EUMETSAT data will be granted free of charge For the GMES S-3 development, a third party programme will be established

Slide: 9 EUM/PEPS/VWG/08/ /07/2008 Current activities ESA: 2 nd industrial Phase 0 study for Post-EPS (Thales Alenia Space has been kicked off) in July 2008 Preliminary Assessment Review was held in June 2008 Mid Term Reviews to be held in December 2008 (Astrium) and January 2009 (Thales) Follow national studies DLR: METimage, Phase A completed, Phase B started in September 2008 CNES: IASI follow-on, Phase 0 completed

EUM/PEPS/VWG/08/0122 Issue 1, 19/11/2008 Preliminary Assessment Review Outcome

Slide: 11 EUM/PEPS/VWG/08/ /07/2008 Objectives of Preliminary Assessment Review (PAR) “to decide on the observation missions to be retained for further study” ref. to “potential for implementation within the anticipated budgetary constraints” (EUM/C/63/07/DOC/46) It implies –a review of the preliminary assessment of the candidate missions, and its consistency with mission and programmatic requirements It is an opportunity to –give recommendations on the execution of the industrial studies

Slide: 12 EUM/PEPS/VWG/08/ /07/2008 PAR Objectives / Selection Criteria CriteriaInputs to support the assessment 1Contribution by the mission to the fulfilment of EUMETSAT high level objectives Ranking of the candidate missions (elaborated in the Post-EPS PARD) 2Prefer solutions that address a broader set of missions to those that strive for the highest compliance by only the top priority ones, as long as a baseline level of performance is assured in each of them  Baseline mission performance defined in the Post- EPS MRD  Implementation options as output of the Preliminary Assessment part of the study by industry and ESA 3Maturity of the technology, suitability for an operational mission and minimisation of development risk Output of the Preliminary Assessment part of the study by industry and ESA 4Expected data gaps vs. similar missions planned by other agencies Gap Analysis 5Compliance with the financial constraints and optimisation of cost/benefit relationship  EUMETSAT financial constraints defined in PARD  Cost estimates of the Preliminary Assessment part of the study by industry and ESA

Slide: 13 EUM/PEPS/VWG/08/ /07/2008 PAR Non-Objectives The PAR is NOT expected to anticipate: –Specific payload options (for those missions to be retained) –A space or ground segment configuration Available elements are too preliminary, often and on purpose limited to a “baseline” or heritage concept for a rapid programmatic/cost assessment Relevant concepts are to be established in the industrial studies managed by ESA

Slide: 14 EUM/PEPS/VWG/08/ /07/2008 Scope of PAR: Observation Missions (1/2) Observation Mission as per MRD v. 1M Ph. 0 Study approach – special cases High-Resolution Infrared Sounding (IRS) Microwave Sounding (MWS) Scatterometry (SCA) VIS/IR Imaging (VII) Microwave Imaging (MWI)1.4 GHz: preliminary assessment by EUM/ESA based on SMOS Other channels: preliminary assessment by industry Radio Occultation Sounding (RO) Nadir viewing UV/VIS/NIR - SWIR Sounding (UVNS) Accommodation only, payload defined in Sentinel 4/5 Phase 0 study Doppler Wind Lidar (DWL)Preliminary assessment by EUM/ESA based on ADM follow-on studies Aerosol Profiling Lidar (APL)Preliminary assessment by EUM/ESA based on ADM follow-on studies

Slide: 15 EUM/PEPS/VWG/08/ /07/2008 PAR Scope: Observation Missions (2/2) Observation Mission as per MRD v. 1M Ph. 0 Study approach – special cases Multi-viewing, Multi-channel, Multi-polarisation Imaging (3MI) Dual View Radiometry (DVR)Not addressed, payload of Sentinel 3 Radar Altimetry (ALT)Not addressed, payload of Sentinel 3 Ocean Colour Imaging (OCI)Not addressed, payload of Sentinel 3 Cloud and Precipitation Profiling Radar (CPR) Radiant Energy Radiometry (RER) Total Solar Irradiance Monitoring Mission (TSIM) Limb Infra-Red Sounding (LIR)Not retained, no demonstration Limb Millimetre-Wave Sounding (MMW)Not retained, no demonstration Differential Absorption Lidar (DIA)Not retained, no demonstration

Slide: 16 EUM/PEPS/VWG/08/ /07/2008 PAR: Non-Observation Missions/Services Data Collection System (PARD, TBC) Search & Rescue (PARD, TBC) User Services (MRD): Direct Data Broadcast Near Real Time Data Distribution Archiving and Retrieval Reprocessing User Support Space and Ground Segment impact Ground Segment impact Not in scope of PAR But system impact should be taken into account

Slide: 17 EUM/PEPS/VWG/08/ /07/2008 Scope: Phase 0 Studies Preliminary Assessment Preliminary analysis of requirements Identification of baseline instrument concepts / heritage instruments for cost Estimation, including driving/critical elements, cost and development risk factors Preliminary trade-offs on number of satellites, launchers, data rates and number of ground stations Preliminary Assessment Review Preliminary Definition Identification of instruments concepts options and trade off criteria Preliminary architectural design with emphasis on space segment and space– ground interfaces Preliminary programmatic planning and costs elements Detailed Definition Refinement of selected instrument and system options Identification of critical areas and needs for technology developments Consolidation of programmatic elements “standard” Phase 0 Post-EPS Specific Approach

Slide: 18 EUM/PEPS/VWG/08/ /07/2008 Scope: Phase 0 Study (2/2) WhoWhatWhen EUMETSAT/ESAPreliminary Assessment of DWL, APL, MWI 1.4 GHz March – June 2008 ASTRIUM (F) / ESAKicked off 1 st industrial study28 March 2008 ASTRIUM (F) / ESAPreliminary Assessment of IRS, MWS, SCA, VII, MWI, RO, 3MI, CPR, RER, TSIM, S5 accommodation March – June 2008 EUMETSATSystem and ground segment analyses EUMETSAT/ESAPreliminary Assessment Review24-25 June 2008 TAS (I) / ESAKicked off 2 nd de-scoped study16 July 2008 ASTRIUM (F) /TAS (I) ESA / EUMETSAT Preliminary DefinitionJune-December 2008 ESA/Industry EUMETSAT Mid Term Review 2 nd User Consultation Workshop Dec 2008 / Jan 2009 February 2009 ASTRIUM-F / TAS (I) ESA / EUMETSAT Detailed DefinitionJanuary 2008 – June 2009 ESA/Industry EUMETSAT Final Review Mission Definition Review June 2009 June - July 2009

Slide: 19 EUM/PEPS/VWG/08/ /07/2008 Candidate Mission Ranking

Slide: 20 EUM/PEPS/VWG/08/ /07/2008 Candidate Mission Ranking (after the PAR)

Slide: 21 EUM/PEPS/VWG/08/ /07/2008 Programmatic Constraints - A summary table

Slide: 22 EUM/PEPS/VWG/08/ /07/2008 PAR Outcome – Missions to be Retained in Phase 0 Studies Infrared Sounding Mission (IRS) –Atmospheric Chemistry requirements must not drive the instrument Microwave Sounding Mission (MWS) Visible/Infrared Imaging Mission (VII) Scatterometry Mission (SCA) Microwave Imaging Mission for Precipitation (MWI – Precipitation) Radio Occultation Mission (RO) Multi-Viewing Multi-Frequency, Multi-Polarisation Imaging Mission (3MI) Accommodation of Radiant Energy Mission (RER) Accommodation of Ultraviolet Visible Near Infrared Shortwave Infrared Imaging Mission (UVNS) via GMES Sentinel-5

EUM/PEPS/VWG/08/0122 Issue 1, 19/11/ nd Post-EPS User Consultation Workshop

Slide: 24 EUM/PEPS/VWG/08/ /07/ nd PEPS UC Workshop – Objectives (1/2) Inform users on relevant mission requirements –WMO: vision and requirements of the WMO space programme in the PEPS era –GOS: evolution of the space-based observing system –EUMETSAT: lessons learnt from EPS Introduce candidate observation missions, prioritisation, and down-selection process for industrial studies –PMET-Chair: introduction to the candidate observation missions –EUMETSAT: details on observation missions, their prioritisation and down- selection Present the potential of the system in various application areas –PMET

Slide: 25 EUM/PEPS/VWG/08/ /07/ nd PEPS UC Workshop – Objectives (2/2) Inform users on programmatic assumptions and constraints –EUMETSAT Inform users on the status of concept studies –EUMETSAT: notional concepts –ESA: Phase 0 studies outcome –ESA: Status of GMES S-5 Inform users on US approach for next generation polar system –NOAA: NPOESS and its follow-on Inform users on status of related projects –CNES: IASI follow-on –DLR: METimage Acquire users’ feedback