GEO Architecture and Data Committee Task AR-07-02 Architecture Implementation Pilot George Percivall September 2008.

Slides:



Advertisements
Similar presentations
GEO Task AR AIP-2 Kickoff Workshop NCAR Mesa Laboratory September 2008.
Advertisements

GEOSS ADC Architecture Workshop Break-out summaries: Initial Operating Capability (IOC) Doug Nebert U.S. Geological Survey February 5,
GEOSS AIP-2 Development Interim Design Review Portals & Application Clients Transverse WG Nadine Alameh
GEO Architecture and Data Committee Task AR Architecture Implementation Pilot Products, Sensors, Models Access Services WG WG Points of Contact:
AIP-2 Kickoff Workshop Energy SBA Session Ellsworth LeDrew, University of Waterloo, Canada Thierry Ranchin, Mines ParisTech, France GEOSS AIP-2 Kickoff.
GEOSS Architecture Implementation Pilot, Phase 3 - Call for Participation - George Percivall, Open Geospatial Consortium GEO Task AR-09-01b Task POC December.
GEOSS Architecture Implementation Pilot Water Information Services with GEOSS Interoperability Arrangements George Percivall Open Geospatial Consortium.
GEO Task AR Architecture Implementation Pilot, Phase 2 (AIP-2) Kickoff Workshop NCAR Mesa Laboratory September 2008.
High level summary and recommendations from AIP-3 George Percivall Open Geospatial Consortium Task lead AR-09-01B ADC-16, May 2011.
Successful Implementations for SBAs using GEOSS Interoperability Arrangements George Percivall The Open Geospatial Consortium Jay Pearlman, IEEE Nadine.
GEOSS Task AR-09-01b Architecture Implementation Pilot Phase 4 (AIP-4) Nadine Alameh, George Percivall, Ingo Simonis Open Geospatial Consortium (OGC) GEOSS.
1 GEOSS Architecture Implementation Pilot (AIP) Phase 2 Air Quality and Health Working Group Stefan Falke, Rudy Husar, Frank Lindsay, David McCabe, Erin.
SIF Status to ADC Co-Chairs
Core Task Status, AR Doug Nebert September 21, 2008.
GEOSS Common Infrastructure (GCI)
Slide # 1 Report to ADC AR Status Doug Nebert, POC U.S. Geological Survey.
REASoN REASoN Project to link NASA's data, modeling and systems to users in research, education and applications Application of NASA ESE Data and Tools.
GEOSS Community Portal Recommendations Team Report.
GEO Architecture and Data Committee Task AR Architecture Implementation Pilot George Percivall Open Geospatial Consortium Task AR Point of.
GEOSS Architecture Describes how components fit together for providing data and information that will be better …than the individual components or systems.
ESIP Air Quality Workgroup and the GEO Air Quality Community of Practice collaboratively building an air quality community network for finding, accessing,
Emissions Information Infrastructures NEISGEI and GEOSS Stefan Falke Northrop Grumman and Washington University in St. Louis
Global Earth Observation System of Systems (GEOSS) Architecture Implementation Pilot (AIP) Air Quality and Health Working Group Stefan Falke, Rudy Husar,
GEO Architecture Implementation Pilot ESIP Federation Meeting January 2009.
Global Earth Observing System-of- Systems (GEOSS) Architectural Framework Doug Nebert FGDC, U.S. Geological Survey February 2008.
GEO Architecture and Data Committee Architecture Workshop Hosted by the European Commission At the Joint Research Centre February 2008 DRAFT.
Vision and architecture of GEOSS Information System GEOSS Design and Evolution George Percivall The Open Geospatial Consortium (OGC) GEO Task IN-05 coordinator.
GEOSS Task AR-09-01b Architecture Implementation Pilot Phase 6 (AIP-6) Bart De Lathouwer Open Geospatial Consortium (OGC) GEO-X Plenary, Geneva, Switzerland.
GEO Architecture and Data Committee Task AR Architecture Implementation Pilot George Percivall Open Geospatial Consortium GEO Task AR Point.
Slide # 1 GEO Task AR Architecture Implementation Pilot George Percivall GEO ADC Meeting, 14 & 15 May 2007.
GEOSS Architecture Implementation Pilot AIP February 2011 GeoViQua First Workshop George Percivall Open Geospatial Consortium Task Lead AR-09-01B - AIP.
AIP-2 Kickoff Workshop End-to-end use case: Discovery, access, and use with variations Doug Nebert GEOSS AIP-2 Kickoff September 2008.
ENV proposal meeting, Geneva, Sep. 24, GCI Presentation Joost van Bemmelen, ESA
GEOSS Architecture Implementation Pilot, Phase 3 - AIP-3 Initial Concepts - Hervé Caumont George Percivall Open Geospatial Consortium GEO Task AR-09-01b.
SIF Status to ADC Co-Chairs Siri Jodha S. Khalsa Steve Browdy.
GEOSS AIP-2 Overview AIP-2 Societal Benefit Area Working Groups: Air Quality & Health Disaster Response Biodiversity and Climate Renewable Energy Air Quality.
GEOSS Common Infrastructure Internal Structure and Standards Steven F. Browdy (IEEE)
WGISS Technology Subgroup Report WGISS-29 Bonn, 2010 Nataliia Kussul WGISS.
® GEOSS AIP 5 Water SBA Update HDWG June 2012 Matt Austin NOAA Stefan Fuest KISTERS Jochen Schmidt NIWA.
Initial Operating Capability Task Force (IOCTF) Status Briefing September 21, 2008.
Slide # 1 GEO Task AR Architecture Implementation Pilot George Percivall GEO ADC Meeting, 28 February & 1 March 2007.
Report of the Architecture and Data Committee (ADC) R.Shibasaki (ADC, Japan)
1 ISO WAF Community Catalog Product Access Servers Registry Clearinghouse(s) GEO Portals Community Portals Users Client Apps GetCapabilities ISO
Core Task Status, AR Doug Nebert September 22, 2008.
Implementing GEOSS architecture with-and-for Users George Percivall Open Geospatial Consortium Task lead AR-09-01B.
GEOSS Common Infrastructure Access to Priority Earth Observations Data “ Sprint to Plenary” Group on Earth Observations Eighth Plenary Session - GEO-VIII.
ISWG / SIF / GEOSS OOSSIW - November, 2008 GEOSS “Interoperability” Steven F. Browdy (ISWG, SIF, SCC)
Architecture Implementation Pilot, Phase 2 (AIP-2) presentation to ADC/UIC meeting, Stresa, Italy AIP-2 SBA Demonstrations and discussion of UIC/AIP-2.
GEOSS Architecture Implementation Pilot - AIP-2 Results - AIP-3 Initial concepts George Percivall Open Geospatial Consortium GEO Task AR-09-01b Task POC.
GEOSS Architecture Implementation Pilot, Phase 2 (AIP-2) George Percivall, Open Geospatial Consortium GEO Task AR-09-01b Task POC 2 February 2009.
GEO ADC Co-Chair meeting USGS, Reston, Dec Slide # 1 AR Interface implementations for GEOSS George Percivall
GEO Architecture and Data Committee Task AR Architecture Implementation Pilot Access Services: Products, Sensors, Models WG Access Services Co-Chairs:
OGC’s role in GEO: Results from the Architectural Implementation Pilot (AIP) George Percivall Open Geospatial Consortium GEO Task IN-05 Coordinator
GEO Task AR-09-01B AIP-3 Kickoff Workshop Closing Plenary ESA-ESRIN Frascati, Italy March 2010.
GEO Architecture and Data Committee Task AR Architecture Implementation Pilot GEO Task AR Team Representatives: - Doug Nebert, USA/FGDC - Larry.
Architecture Implementation Pilot, Phase 2 (AIP-2) presentation to ADC-10 meeting, Stresa, Italy AIP Phase 2 Progress including demonstration of Transverse.
Global Earth Observation System of Systems (GEOSS) Architecture Implementation Pilot (AIP) Air Quality and Health Working Group Stefan Falke, Rudy Husar,
ESA-FAO GEOPortal STATUS & PLANS
GEO Task AR Team Representatives: Doug Nebert, USA/FGDC
George Percivall, Open Geospatial Consortium
GEO Task IN-05 Architecture Implementation Pilot, Phase 5 AIP-5 Kickoff Workshop UNEP Geneva 3-4 May 2012.
GEO Architecture Implementation Pilot
Workplan for Updating the As-built Architecture of the 2007 GEOSS Architecture Implementation Pilot Session 7B, 6 June 2007 GEOSS Architecture Implementation.
GEOSS Architecture Implementation Pilot, Phase 2 (AIP-2)
George Percivall September 2008
Core Task Status, AR Doug Nebert September 22, 2008.
AIP-5 Kick-off Workshop Summary 3-4 May 2012, UNEP, Geneva
GEOSS Architecture Implementation Pilot, Phase 3 AIP-3 Initial Plans – Drought Scenario - presentation to ESIP - George Percivall, Open Geospatial Consortium.
GEOSS Future Products Workshop March 26-28, 2013 NOAA
Air Quality Data Systems and the GEOSS Architecture
Presentation transcript:

GEO Architecture and Data Committee Task AR Architecture Implementation Pilot George Percivall September 2008

Slide 2 GEO Task AR Architecture Implementation Pilot Lead incorporation of contributed components consistent with the GEOSS Architecture… …using a GEO Web Portal and a GEOSS Clearinghouse search facility …to access services through GEOSS Interoperability Arrangements …in support of GEOSS Societal Benefit Areas

Slide 3 AI Pilot has broad international participation that could only have occurred with GEO. High interest & momentum supporting GEOSS vision. AIP Phase 1 Results Elements of the GEOSS Common Infrastructure (GCI) – Initial Operating Capability established Effective development process for GEO –CFP, Kickoff, Execution, etc. –~120 organizations participated –Methods for international coordination 10 Demonstrations of Initial Operating Capability10 Demonstrations Prepared “Architecture Implementation Report”

AIP Phase 1 Results Initial results established in Components & 75 Services registered (21 Nov 07) –Process and components for registration; SIF User interfaces to services –GEO Web Portals (3), Community Portals (27) and Application Clients (13) Several organizations capable of providing –GEO Web Portal solutions –GEOSS Clearinghouse solutions

DevelopmentActivities Kick-offWorkshop Call for Participation ConceptDevelopment PersistentOperations(AR-07-01) Participation ArchitectureDocumentation Updates for each step Baseline AR Architecture Implementation Pilot Evolutionary Development Process Operational Baseline and Lessons Learned for next evolutionary spiral Continuous interaction with external activities AI Pilot Development Approach

AIP Phase 2 - CFP (Call For Participation ) CFP Main Document –Master Schedule –Themes 2008 –How to respond to CFP Annex A: Development plan –Development phases; Communication Plan –Relationship to GCI task force Annex B: Architecture CFP announced 30 June 2008 Responses for Kickoff 1 Sept 2008

AIP Phase 2 Priorities Identify and register solutions that are available in GEOSS as complete application solutions used on a regular basis by a Community of Interest. Underlying services and schemas are exposed in well-documented, ideally standard, ways and are demonstrated as consumable by other solutions (in the scenarios). Coordination and integration activity through 'externality analysis' to relationships, dependencies and issues with related topics.

AIP Phase 2 Themes Consolidate the GEOSS Common Infrastructure Emphasize SBAs identified by UIC/ADC collaboration Develop operational persistence; –"persistent exemplars” Refine GEOSS AIP Architecture definition Further open the AIP development process to all interested parties

Phase 2 Goals Systematic registration of Components and Services Support of registered standards by offerings Quality and availability of services, particularly core services Integrating data /services towards additional SBA application domains Strengthening the use of the Web Portals to access and integrate all GEOSS resources Improving the interaction of the GEOSS Web Portals, Registries, and Clearinghouse Focus on limited set of “well-known” combinations and versions of protocols and content standards Developing a basic EO metadata record for GEOSS-wide use Adding Sensor Web protocols and data types Increasing support for workflows and event - notification handling

GEO Web Site Client Tier Business Process Tier Access Tier GEO Web Portal GEOSS Registries Services Components Standards GEONETCast Other Services Product Access Services Model Access Services Community Portals Client Applications Requirements Community Catalogues Portrayal Servers Workflow Management Processing Severs Other Services GEOSS Clearinghouse Sensor Web Services Alerts/Feeds Servers Infrastructure Registries CFP Architecture – Component Types

CFP Architecture – Operational Persistence Length of commitment –Upon registering a service, a service provider must specify the length of time for which the service will be offered (preferably ‘continuous operation’). –Consider multiple years Level of service –services are expected to be available at least 99% of the time, except when otherwise required by the nature of the service. –This allows for approximately 7 hours of down time a month –Being achieved regularly by servers, Biggest problem is network provider –Performance (perhaps by specifying number of simultaneous connections) Termination –GEO may “de-list” a server –non-functioning components of the Network will diminish the operational and marketing value of the Network in general for all participating organizations.

AIP-2 CFP Responses (33 to date) ACRF BKG Caribbean Flood Team CIESIN CNES and ERDAS Compusult EPA AirNow ERDAS Titan ESA ESIP AQ Cluster ESRI ESRI Canada EuroCryoClim GEO-Ukraine ICAN ICT4EO INCOSE IP3 ISPRA JAXA Mines Paris Tech NASA World Wind NOAA/NASA GOES-R and GMU CSISS NOAA IOOS NOAA NCDC NOAA SNAAP Noblis Northrop Grumman Spot Image SURA/NIMSAT/GoMOOS USGS VIEWS Washington University in St. Louis

AIP-2 Kickoff Sessions Societal Benefit Areas, Communities of Practice & Scenarios –Disaster Response –Biodiversity and Climate Change –Renewable Energy –Air Quality Technology contributions: –Catalogues, Clearinghouse, Metadata –Data Product Access: service, schema, encoding –Sensors and Models Access: service, schema, encoding –Workflow for derived product and alert generation –Clients –Test Facility

Coordinating GEO Tasks in CFP Responses DI Use of Satellites for Risk management DI Risk management for floods EC Global Ecosystem Observation and Monitoring Network DA Sensor Web Enablement for In-Situ Observing Network DA Data Integration and Analysis System DA Basic Geographic Data AR Global Geodetic Reference Frames AR Enabling Deployment of a GEOSS Architecture

AIP-2 Kickoff – SBA SCENARIOS Disaster Response SBA : –Ron Lowther Ronald.Lowther at ngc.com Northrop Grumman –Didier Giacobbo Didier.Giacobbo at spotimage.fr Spot Image –Stuart Frye Stuart.Frye at nasa.gov Caribbean Flood Team Health SBA: Air Quality : –David McCabe, McCabe.David at epamail.epa.gov ESIP AQ Team –Frank Lindsay, francis.lindsay-1 at nasa.gov ESIP AQ Team –Stefan Falke, stefan at wustl.edu ESIP AQ Team –Rudy Husar rhusar at me.wustl.edu ESIP AQ Team Biodiversity and Climate –Stefano Nativi nativi at imaa.cnr.it IP3 Response –One other Energy SBA –Thierry Ranchin thierry.ranchin at ensmp.fr Mines Paris Tech –Ellsworth LeDrew ells at watleo.uwaterloo.ca UIC Co-Chair

AIP Phase 2 Master Schedule Architecture Workshop February 2008 CFP announce 30 June 2008 CFP Clarification Telecon 18 July 2008 CFP Responses for Kickoff due 1 Sept 2008 Kickoff workshop Sept 2008 Status & Interim results to GEO PlenaryNovember 2008 AIP-2 results transition to operations 1st quarter of 2009