What Documentation Needs to be Submitted With an Approval Application?

Slides:



Advertisements
Similar presentations
(Individuals with Disabilities Education Improvement Act) and
Advertisements

AS9102 First Article Inspection Report
Independent Laboratory Testing PART 6 Regulations Wayne Colley Electrical Safety Division Electrical Engineer.
Nationally Recognized Testing Laboratories
Florida Product Approval System Validator Training December 11, 2012 Florida Product Approval System Validator Training December 11, 2012 Florida Building.
Becky Garrett, LRT/CTRS.  #1 Start the application before you leave school! It will be easier to collect all of the supporting documentation needed.
U.S. Pretrial Services and Probation Office Northern District of Ohio.
MSHA APPROVAL PROCESS Steven Luzik Chief, Approval and Certification Center Chief, Approval and Certification Center.
1 HYDROSTATIC TESTING Approved for Public Release.
Ensuring Better Services and Fair Value “Introduction and roadmap to implementation of ISO in Zambia’s water utilities” Kasenga Hara March 2015.
UTHSC IRB Donna Hollaway, RN, CCRC 11/30/2011 Authority to Audit 45 CFR (e) An IRB shall conduct continuing review of research covered by this.
Registration Management Committee (RMC) Other Party (OP) Assessor AS9104/2 - Oversight Training January 24, 2008 – Phoenix, Arizona Roles and Responsibilities.
First Article Inspection Report
1 Licensing in the Energy Sector Georgian National Energy And Water Supply Regulation Commission Nugzar Beridze June 27 – July 3, 2008.
Satellite Notification and Acceptance Program (SNAP)
[Federal Register: June 17, 2003 (Volume 68, Number 116)] [Rules and Regulations] [Page ]
Discussion on SA-500 – AUDIT EVIDENCE
Florida Product Approval System Florida Building Commission Florida Department of Community Affairs 2555 Shumard Oak Blvd | Tallahassee, FL
Laboratory Personnel Dr/Ehsan Moahmen Rizk.
Mª ANGELA JIMENEZ 1 UNIT 4. EXTERNAL AUDIT BASIS CONCEPTS.
H OW T O R ENEW Y OUR C ERTIFIED N URSE A SSISTANT ( CNA ) H OME H EALTH A IDE ( HHA ) C ERTIFICATE.
Independent Laboratory Testing PART 6 Regulations Mechanical & Engineering Safety Division Robert Setren Mechanical Engineer.
Medicaid Hospital Utilization Review and DRG Audits: Frequently Asked Questions The Department of Medical Assistance Services Division of Program Integrity.
First Article Inspection
ECO-MANAGEMENT AND AUDIT SCHEME Performance, credibility, transparency Accreditation & Registration Systems in EMAS.
2 Testing and Evaluation by Independent Laboratories and Non-MSHA Product Safety Standards Part 6: Final Rule.
World Health Organization
Registration Management Committee (RMC) Other Party (OP) Assessor AS9104/2 - Oversight Training January 16, 2009 – Orlando, Florida Roles and Responsibilities.
UN ECE Sectoral Initiative on Equipment for Explosive Atmospheres 7 September 2011 United States Department of Labor Mine Safety and Health Administration.
Tm Aug LXI Consortium – Conformance WG Page 1 CONFORMANCE WORKING GROUP Jochen Wolle August 25, 2005.
Regulatory Overview.
DOCUMENTATION.
By: Carol Martineau, Acting Assistant Manager, Aircraft Maintenance Division, AFS-301 Date: June 7, 2015 Federal Aviation Administration ASA Conference.
NMA/MSHA Approval Workshop MSHA Approvals Approval and Certification Center May 21 and 22, 2008.
Planning an Audit The Audit Process consists of the following phases:
MATTHEW MATKOVICH MINE EQUIPMENT COMPLIANCE SPECIALIST QUALITY ASSURANCE & MATERIALS TESTING DIVISION MSHA – APPROVAL & CERTIFICATION CENTER 30CFR, PART.
Railway Transport Equipment (RTE) Certification Railway Transport Equipment Certification Procedure Application for railway transport equipment certification.
DSA 101 July 2010 Plan Approval Process for the Career Technical Education Facilities Program (CTE)
Laboratory Accreditation as a Component of the Help America Vote Act Mary H. Saunders Chief, Standards Services Division.
Summary of Rulemaking in California for the Forensic Alcohol Laboratories Regulation Review Committee Cathy L. Ruebusch, RN, MSN Office of Regulations.
Accreditation for Voting Equipment Testing Laboratories Gordon Gillerman Standard Services Division Chief
STATE OF ARIZONA BOARD OF CHIROPRACTIC EXAMINERS Mission Statement The mission of the Board of Chiropractic Examiners is to protect the health, welfare,
SANAS ACCREDITATION DEES DHANRAJ BEE Lead Assessor.
Reimbursement Statements What you need to know. Let’s Take a Closer Look… …at invoicing, cost ledgers, SB and budget revisions.
QSR and GLP What exactly are these?.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Approvals and Permits Division Isreal Mallard Transportation Specialist,
Making every vote count. United States Election Assistance Commission EAC Voting System Certification TGDC Meeting December 9-10, 2009.
Design Documentation Clint Kehres, Brian Krouse, Jenn Shafner.
Dispensary and Administration Site Information Presentation.
1 Kingsley Karunaratne, Department of Accounting, University of Sri Jayewardenepura, Colombo - Sri Lanka Practice Management.
Webinar FSSC audit report 7th september 2015
RIHES-II: H ANDLING A UDITS AND I NSPECTIONS E FFECTIVE D ATE 25 D ECEMBER 2006 V ERSION : 3.0 บุญเหลือ พรึงลำภู 15 มกราคม 2557.
Thanks for giving me an opportunity to share with you our process for controlling media and other supplies. Disclaimer: We are not yet accredited to ISO.
14 March 2002Update on SDoC - USA1 Update on Supplier’s Declaration of Conformity – USA William Hurst Federal Communications Commission Office of Engineering.
Most Common Deficiencies Cheryl O. Morton Managing Director, AIHA Laboratory Accreditation Programs, LLC.
Sponsored Project Administration Fall 2012 CERTIFICATION PROGRAM Sponsored Project Lifecycle Introduction Overview Creating a Project Budget Compliance.
ISO 9001:2015/14001:2015 Certification Transition Process
Responsibilities of Sponsor, Investigator and Monitor
Texas Law Enforcement Recognition Program
Responsibilities of Sponsor, Investigator and Monitor
Welcome to the Electronic Permit Submittal and Processing System (EPSAP) Professional Engineer Submittal Instructions.
Evaluation of Suppliers of Critical Consumables, Supplies and Services Section February 2016.
EMC & COMPLIANCE ENGINEERING
First Article Inspection
CDRL E003 CFAT REPORT TEMPLATE
Grants Management 101 Part A
Operationalizing Export Certification and Regionalization Programmes
Guide for successful completion of First Article Inspection Reports
Guide for successful completion of First Article Inspection Reports
Presentation transcript:

What Documentation Needs to be Submitted With an Approval Application?

Evidence of the Laboratory’s Independence  The applicant must submit to MSHA evidence that the laboratory is free from commercial, financial and other pressures that may influence the results of the testing and evaluation process. ( 30CFR §6.10(a)(1) )

Evidence of the Laboratory’s Independence  Evidence could be:  The certificate or assessor’s report, from the accrediting organization  Under the NRTL & IECEx accreditation programs the laboratory’s independence is verified

 The applicant must also submit written verification from the independent laboratory that the laboratory is currently recognized by a laboratory accrediting organization, including:  the name and address of the accrediting organization  the scope of the accreditation  the date of accreditation and date of expiration or renewal Verification of Recognition by an Accrediting Organization

Evaluation Documents Required  A complete technical explanation of how the product complies with each requirement in the applicable MSHA product approval standard; if a requirement is not applicable to the product design, the report must explain why that requirement is not applicable ( 30CFR §6.10(a)(2) )

Evaluation Documents Required  Identification of components or features of the product critical to the safety of the product; including a list of components and features that the laboratory considered critical to the safety of the product ( 30CFR §6.10(a)(3) )

Evaluation Documents Required  All documentation including drawings and specifications, as submitted to the independent laboratory by the applicant and as required by the applicable part of 30 CFR ( 30CFR §6.10(a)(4) )  Each component shall be identified by its manufacturer, manufacturer’s designation and its relevant electrical or mechanical specifications

Evaluation Documents Required  A signed written statement from the independent laboratory to the applicant, stating that all product testing and evaluation were conducted or witnessed by the laboratory’s personnel ( 30CFR §6.10(c) )

 When testing is necessary to evaluate a component or assembly; all testing must comply with the applicable MSHA product approval requirement. ( 30CFR §6.10(b) )  The submitted test report must include sufficient test data to verify compliance with the applicable MSHA requirement, and to determine the test procedure used.  Examples of test data include photographs, video tapes, electronic files etc. Testing Documents Required

Test reports should include :  test date  location of testing  applicable product standard  title of the laboratory’s test procedure  name of the person performing the tests  name of the person responsible for the accuracy and completeness of the tests  signature of the responsible company official  photocopies are acceptable

Questions Involving Evaluation or Testing Documentation   MSHA notifies the applicant if additional information or testing is required.   The applicant will arrange for additional or repeat testing and notify MSHA of the location, date and time of the tests.   MSHA may elect to observe any additional testing conducted by an independent lab. (30CFR §6.10(d))

Questions Involving Evaluation or Testing Documentation  MSHA may decide to conduct additional or repeated tests at the applicant’s expense; the applicant must supply any additional components necessary for evaluation and testing.  The applicant may request to have MSHA conduct any additional or repeat testing.

Summary of Documents Submitted  Evidence of the laboratory’s independence, accreditation, and scope of accreditation  Test Reports (including procedures and data)  Drawings and specifications; including a list of drawings submitted to the independent laboratory  All other documentation as required by TITLE 30 Code of Federal Regulations

Application Processing  Applications will be processed in the order received.  A written estimate of the maximum fee to conduct the technical evaluation will be sent to the applicant, prior to beginning the application review. ( 30CFR §5.30(c) )  After the application review, the applicant will be billed for the cost of conducting the investigation. ( 30CFR §5.40(c) )