ATNF Users’ Committee: Director’s Update CSIRO Astronomy and Space Science Philip Diamond, Chief CASS & Director ATNF 11 July 2012.

Slides:



Advertisements
Similar presentations
Australian Report -- The view from down under
Advertisements

Substantive Change Requesting Commission Approval of Substantive Changes at Institutions MSCHE Annual Meeting December 2009.
Towards the e-APT Tasso Tzioumis ATNF
Science Operations Phil Edwards 30 October 2012 Space for collaborator logos [delete instructions before use] CSIRO ASTRONOMY & SPACE SCIENCE.
ASTRONOMY & SPACE SCIENCE Lewis Ball CASS Director Director’s report ATUC Nov 2014 CSIRO ASTRONOMY AND SPACE SCIENCE.
ATNF Science Priorities: 2010 – 2015 Ball, Braun, Edwards, Feain, Hobbs, Johnston, McClure-Griffiths.
CSIRO ASKAP Science Data Archive (CASDA) Project Kick-Off IM&T AND CASS Dan Miller| Project Manager 17 July 2014.
ASKAP Status Update CSIRO ASTRONOMY AND SPACE SCIENCE David Brodrick EPICS [Spring] Collaboration Meeting 22nd October 2014.
Spectrum Management: Parkes & ATCA Briefing for ATUC members CSIRO ASTRONOMY AND SPACE SCIENCE Erik Lensson | Head, ATNF Engineering Operations 30 October.
ATUC Meeting Project Update CSIRO Astronomy and Space Science Antony Schinckel, ASKAP Director 30 October 2012 ATUC Meeting | Antony Schinckel | Page 1.
Phil Edwards Head of Science Operations CSIRO Astronomy and Space Science Science Operations.
ASKAP Central Processor: Design and Implementation Calibration and Imaging Workshop 2014 ASTRONOMY AND SPACE SCIENCE Ben Humphreys | ASKAP Software and.
FACET: The Proposal Process with Q & A Carsten Hast SLAC National Accelerator Laboratory.
Australian Centre for Space Photonics Andrew McGrath Anglo-Australian Observatory.
Decadal Plan UNSW, 17 Dec 2004 Australia Telescope Operated by CSIRO as a National Facility since 1990 As a National Facility, the Australia Telescope.
ASKAP and DVP David DeBoer ASKAP Project Director 15 April 2010 Arlington, VA.
ATUC, Marsfield Phil Diamond, Chief of Division 28 June 2011 CSIRO Astronomy and Space Science ATNF: Director’s Update.
The Frequency Agile Solar Radiotelescope Current Status & Plans T. S. Bastian NRAO.
Baseband processing, e-VLBI, and SKA simulations Steven Tingay Swinburne University of Technology MNRF Symposium, 8 June, 2004.
Mopra Time Allocation Mopra publications performance Mopra time allocation statistics Mopra Large Projects Proposal applications for 2012 APRS Jessica.
Radio Quiet Zones (RQZ) History and Current Activities Tasso Tzioumis ATNF, CSIRO.
Australian Radio Astronomy Facilities Tasso Tzioumis Australia Telescope National Facility CSIRO Spectrum Management Coordinator
Technologies for Radio Astronomy Graeme Carrad | Assistant Director - Engineering Mark Bowen | Group Leader – Front End Technologies JULY 2012 CSIRO ASTRONOMY.
VLBI Report LBA Operations & eVLBI Tasso Tzioumis ATNF May 2008.
Jim UlvestadEVLA Mid-Project Review May 11-12, EVLA Operations Jim Ulvestad Array Science Center Concept (Requirements) Staffing and Cost Plans.
New Horizons mission to Pluto Canberra Deep Space Communication Complex – making space history CSIRO ASTRONOMY AND SPACE SCIENCE 13 July 2015.
2 Dec 2003SEARFE Project - G. "Ñima" Warr1 The SEARFE Project G. “Ñima” Warr 2-Dec-03 This presentation will probably involve audience discussion, which.
Mark Bowen Acting Theme Leader – Technologies for Radio Astronomy CSIRO Astronomy and Space Science 14 October 2010 Australia Telescope Users Committee.
23 rd CEOS Plenary I Phuket, Thailand I 3-5 November 2009 OVERVIEW OF THE NEW AUSTRALIAN SPACE SCIENCE PROGRAM Alex Held (CSIRO) On behalf of the Australian.
SSSC 02/18/2010 P. Marcum Science Utilization Policies SOFIA SCIENCE UTILIZATION POLICIES Pamela M. Marcum SOFIA Project Scientist SSSC Feb 19, 2010.
Recent Developments in Australia Phil Edwards Head of Science Operations CSIRO ATNF.
ATUC meeting Director’s Report Lewis Ball May 2009 GASS Image McClure-Griffiths & the GASS team.
Engaging industry The Australian SKA experience Dr Carole Jackson, CSIRO Astronomy and Space Science NAOJ, Mitaka, 5 November 2010.
The SOC Pilot and the ATOA Jessica Chapman CASS Observatory Operations Research Program Leader 28 June 2011.
The ATNF Front End and Back End Groups Presented by Graeme Carrad Assistant Director – Engineering - October 2009 Australia Telescope Users Committee Technologies.
ATUC meeting Director’s Report Brian Boyle November 2007.
EVLBI and the Australian SKA Pathfinder (ASKAP) Prof. Steven Tingay Curtin University of Technology Perth, Australia 7th eVLBI workshop SHAO, 2008 June.
Chandra Users’ Committee CXC Manager’s Status Report For the period October 2009 – April 2010 Roger Brissenden CXC Manager 27 April 2009.
MPARWG Business & Disposition of Action Items from MPARWG October 2009 H. K. (Rama) Ramapriyan NASA/GSFC Metrics Planning and Reporting (MPAR) WG 9 th.
Status and capabilities of the Australian LBA Phil Diamond Chief, Astronomy & Space Science.
ATUC meeting Director’s Report Brian Boyle May 2008.
ATNF Operations Douglas Bock ATUC – 25 NOVEMBER 2014.
Astro Report to ATUC – October 2011 Simon Johnston Head Astrophysics, CASS ATUC, October 2011.
Director’s update CSIRO Astronomy and Space Science Lewis Ball CASS Chief 11 June 2013.
VLBI Facility report - Mar 2003 Tasso Tzioumis ATNF CSIRO.
Australian SKA Pathfinder (ASKAP) David R DeBoer ATNF Assistant Director ASKAP Theme Leader 06 November 2007.
Australia Telescope Users Committee Technologies Report - Oct 2008.
ATUC meeting Director’s Report Lewis Ball October 2008 Gomez et al P616 H 2 O maser AGB star.
The ATNF Front End and Back End Groups Presented by Graeme Carrad Assistant Director – Engineering - May 2010 Australia Telescope Users Committee Technologies.
Collaborative Research Projects in Australia: Radio Astronomy Dr. Greg Wickham (AARNet) Dr Tasso Tzioumis Dr Shaun Amy Dr Chris Phillips (CSIRO ATNF) Global.
AAO Future options 2 x 2 matrix Governance by AAL (AAL takes role currently played by AATB) Governance by CSIRO Colocated with CSIRO in Sydney Located.
Network Connections – e-VLBI Tasso Tzioumis ATNF.
An Overview of the Pre-Award Grant Process
VLBA Key Science: Making It Happen Bob Dickman AD for New Mexico Operations.
AAL & SKA pre-construction funding Mark McAuley CEO, Astronomy Australia Ltd. 4th October 2011.
Paul Alexander1 DS3 Deliverable Status 4 th SKADS Workshop, Lisbon, 2-3 October 2008 DS3 Deliverables Review.
Jim UlvestadEVLA Advisory Committee Meeting May 8-9, EVLA Operations Jim Ulvestad Array Science Center Concept Requirements Staffing and Cost Plans.
Spring 2015 OMSP Request For Proposal. Important Dates Intent to Submit: March 21, 2015 Applications: 4:30 p.m., Friday, May 15, 2015 Announcement of.
The Australian Astronomy MNRF Ray Norris June 2004.
VLBI Developments in Australia ASTRONOMY AND SPACE SCIENCE Chris Phillips| LBA Lead Scientist 11 November 2014.
Kate Chow Carol Wilson, Lisa-Harvey Smith, Balt Indermuehle, and MWA The MRO, Australia’s radio-quiet site: enabling world-class radioastronomy CSIRO ASTRONOMY.
The CSIRO ASKAP Science Data Archive Progress and Plans
ATNF Outreach Workshop
Director’s Update AT Users’ Committee -- November 2016
Paul Wild Observatory at Narrabri
CSIRO Agency Update Dr. Robert Woodcock.
CEOS Missions, Instruments and Measurements Database
Radio Astronomy Spectrum Management in practice – Australia (ATNF)
SKA PEP - Dish Array WP5 Phase 1 Dishes with Single Pixel Feed Systems
EVLA Operations Jim Ulvestad
Presentation transcript:

ATNF Users’ Committee: Director’s Update CSIRO Astronomy and Space Science Philip Diamond, Chief CASS & Director ATNF 11 July 2012

CASS Overview 7 sites ~290 staff Operate 2 National Facilities: ATNF CDSCC Constructing ASKAP Annual budgets FY11/12:  ATNF: $31.3M  CDSCC: $25.8M  Does not include ASKAP construction Parkes 64-m dish Tidbinbilla 1x 70-m and 2x 34-m antennas ASKAP 36x 12-m antennas ATCA 6x 22-m antennas Mopra 22-m dish

CASS Divisional Sites MRO Radiophysics Laboratory Geraldton Pawsey HPC Centre Geraldton Parkes Narrabri Mopra Tidbinbilla

Challenges in FY 2012/2013 Delivery of ASKAP Ramp-up of commissioning Seeking funds to deliver all 36 PAFs Implementation of new operations model, ensuring adequate funding stream Future status of Mopra Implementation of SKA pre-construction and implications of the site decision. Development of Earth Observation Informatics TCP (Transformational Capability Platform)

NASA’s Deep Space Network: CDSCC International network of antennas Australia (Canberra), USA and Spain HQ at JPL, Pasadena Support’s NASA’s interplanetary missions > 40 spacecraft

CDSCC Antenna construction Two new antennas: $100m

Mars Science Laboratory: lands 6 August  Parkes supporting CDSCC during ‘7 minutes of terror’, using modified receiver at 401 MHz

Some statistics

National Facility: Refereed Publications Publications in refereed journals that include data taken with CASS facilities

National Facility: Refereed Publications

CASS Staff: Refereed Publications Includes publications with ATNF data and all other refereed papers

Counts includes National Facility and other staff refereed publications. Tracking Publications: Six decades of radio astronomy Parkes ATCA

CSIRO have signed agreement with NRAO to obtain privileged access to VLBA time $200k has been provided for 100 hours of time over 2 years; aimed at larger projects. This time is in addition to time granted via the normal merit- based process. Valid proposals must have a PI based at an Australian astronomical institute. Proposals may be submitted for the 1 August 2012 deadline. A copy must also be sent to Tasso Tzioumis signifying the PI’s intent to submit a proposal under the CSIRO-NRAO arrangement. VLBA time

 A prototype receiver is installed and its performance is excellent A technology highlight.

 ATNF website is large ( ~ 80,000 pages)  Navigation needs improving  Design needs updating  Sub-sites involved are: – atnf.csiro.au – parkes.atnf.csiro.au – narrabri.atnf.csiro.au – outreach.atnf.csiro.au – intranet.atnf.csiro.au ATNF Website Refresh Project Rationale

 Internal project team  Platform recommendation – move from static site to content management system (Drupal)  Currently finalising site design and planning user testing  Two-stage implementation – (i) update static site with new design – (ii) progressively move content into Drupal  Implementation to start mid-2012 ATNF Website Refresh Project Process

Thank you Astronomy & Space Science Philip Diamond CASS Chief t wwww.csiro.au/projects/ASKAP