AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.

Slides:



Advertisements
Similar presentations
Proton Beam Measurements in the Recycler Duncan Scott On Behalf of the Main Injector Group.
Advertisements

1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Run 2 PMG 2/16/06 - McGinnis Run II PMG Stacking Rapid Response Team Report Dave McGinnis February 16, 2006.
Thomas Roser Muon collaboration meeting February 8-10, 2002 AGS beam intensity upgrades What has been achieved Sextupole power supply upgrades Bunch manipulation.
Paul Derwent 30 Nov 00 1 The Fermilab Accelerator Complex o Series of presentations  Overview of FNAL Accelerator Complex  Antiprotons: Stochastic Cooling.
1 Electron Cloud Measurements at the Fermilab Main Injector Bob Zwaska Fermilab ECloud07 Workshop April 9, 2007.
AGS Polarized Proton Development toward Run-9 Oct. 3, 2008 Haixin Huang.
June 10, 2003Midwest Accelerator Physics Meeting, June 10-11, 2003, ANL 1 Several Topics in Recent Accelerator Studies Weiren Chou Fermilab June 10, 2003.
Proton Plans at Fermilab Robert Zwaska - Fermilab Science and Engineering at Henderson- DUSEL Capstone Workshop Stony Brook University May 5, 2006 Outline.
Commissioning of the Fermilab Accelerators for NuMI Operation Robert Zwaska University of Texas at Austin NBI 2003 November 7, 2003.
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
Antiproton Source Capabilities and Issues Keith Gollwitzer & Valeri Lebedev Accelerator Division Fermilab 1.
Run II DOE Review - Booster Eric Prebys Booster Group Leader FNAL Beams Division.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
INTRODUCTION  RECYCLER BPM – Original system not adequate to measure beam position precisely. It is being upgraded to meet the required physics precision.
SNuMI (>1MW) SNuMI 1 Motivations for SNuMI The neutrino experimental program for the next decade –NOνA (long baseline νμ→νe search) –MINERνA (Main Injector.
Recycler Status and Plans Shekhar Mishra MID/Beams Division Fermilab AAC Review 2/4/03 Introduction to the Recycler Ring Recycler Improvements and status.
Overview Run-6 - RHIC Vadim Ptitsyn C-AD, BNL. V.Ptitsyn RHIC Spin Workshop 2006 RHIC Run-6 Timeline  1 Feb – Start of the Run-6. Start of the cooldown.
F Overview of the SuperNuMI Plan A. Marchionni, Fermilab AD/MID Accelerator Advisory Committee, May 10-12, 2006.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
Ff NO A Accelerator Upgrades: Status Phil Adamson Fermilab
Proton Study Meeting 4/19/05 Eric Prebys 1 Proton Plan Stage I Eric Prebys.
Recent RF Development at Fermilab Weiren Chou and Akira Takagi Fermilab, U.S.A. July 7, 2003 Presentation to the FFAG03 Workshop July 7-12, 2003, KEK.
F Project-X Related Issues in Recycler A.Burov, C.Gattuso, V.Lebedev, A.Leveling, A.Valishev, L.Vorobiev Fermilab AAC Review 8/8/2007.
F 1 MW Proton Beam for Neutrinos Dave McGinnis AAC Meeting May 10, 2006.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
1 Muon acceleration - amplitude effects in non-scaling FFAG - Shinji Machida CCLRC/RAL/ASTeC 26 April, ffag/machida_ ppt.
Diagnostics in the Fermilab Proton Source (Linac + Booster) Eric Prebys FNAL Beams Division.
Paul Derwent 14 Dec 00 1 Stochastic Cooling Paul Derwent 14 Dec 00
Production of bunch doublets for scrubbing of the LHC J. Esteban Muller (simulations), E. Shaposhnikova 3 December 2013 LBOC Thanks to H. Bartosik, T.
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
Accelerator Issues Fermilab Antiproton Experiment Keith Gollwitzer Antiproton Source Department Accelerator Division Fermilab.
BEPCII Transverse Feedback System Yue Junhui Beam Instrumentation Group IHEP , Beijing.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
Proton Intensity Upgrades  Present operation of Main Injector and NuMI  NuMI designed for 400 kW, achieved a max beam power of 270 kW  Present Proton.
Proton Planning – Major Projects, Schedule, Decisions, and Projections Eric Prebys FNAL Accelerator Division.
Doug Michael Sep. 16, GeV protons 1.9 second cycle time 4x10 13 protons/pulse 0.4 MW! Single turn extraction (10  s) 4x10 20 protons/year 700.
Proton Source Improvement Workshop Cogging W. Pellico Dec 6&
Run II PMG 1/19/06 Pushpa Bhat 1 Run II Upgrades Status January 2006 Pushpa Bhat.
AGS Run-9 Preparations, Status and Plans Dec. 16, 2008 Haixin Huang.
Proton Plan PMG 2/22/07 E Prebys 1 Proton Plan Status January Eric Prebys.
Status of the Accelerator Complex Keith Gollwitzer Antiproton Source Accelerator Division Fermilab 2009 Fermilab Users’ Meeting.
High Intensity Booster Operations William Pellico PIP II collaboration Nov. 9 th 2015.
Proton Planning Eric Prebys FNAL Accelerator Division.
Barrier RF Stacking Weiren Chou and Dave Wildman Fermilab, U.S.A. October 20, 2004 Presentation at the Proton Driver Session ICFA-HB2004, Bensheim, Germany,
Proton Plan Director’s Review 8/15/06 Prebys Proton Plan Answers to Questions Director’s Review August 2006 Eric Prebys.
F Possible Proton Capabilities at Fermilab Dave McGinnis April 16, 2007.
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
S. Bettoni, R. Corsini, A. Vivoli (CERN) CLIC drive beam injector design.
Beam time structures 1 At any particular instance of time there will be only one kind of beam in the MI. It will be either protons or anti-protons. The.
LER Workshop, Oct 11, 2006Intensity Increase in the LER – T. Sen1 LHC Accelerator Research Program bnl-fnal-lbnl-slac  Motivation  Slip stacking in the.
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
Limitations to Total Booster Flux Total protons per batch: 4E12 with decent beam loss, 5E12 max. Average rep rate of the machine: –Injection bump magnets.
F Project X: Recycler 8.9 GeV/c Extraction D. Johnson, E. Prebys, M. Martens, J. Johnstone Fermilab Accelerator Advisory Committee August 8, 2007 D. Johnson.
MI/RR Operation Status Ioanis Kourbanis August 21, 2014.
Longitudinal aspects on injection and acceleration for HP-PS Antoine LACHAIZE On behalf of the HP-PS design team.
Slip stacking in Recycler Ioanis Kourbanis 9/14/11.
Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V.
High Power RF Systems for 2-8 GeV Fast Cycling Synchrotron PROJECT X (ICD-2) John Reid September 11, 2009.
Luminosity Optimization for FCC-ee: recent results
New AD Production Beam in the PSB
Multiturn extraction for PS2
LHC (SSC) Byung Yunn CASA.
Advanced Research Electron Accelerator Laboratory
Beam dynamics requirements after LS2
November 14, 2008 The meeting on RIKEN AVF Cyclotron Upgrade Progress report on activity plan Sergey Vorozhtsov.
Update on ERL Cooler Design Studies
JLEIC Ion Integration Goals
Optimization of JLEIC Integrated Luminosity Without On-Energy Cooling*
Presentation transcript:

AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams

AAC February 4-6, 2003 Contents  Goals.  Slip Stacking (Experiments and Simulations).  Beam Loading (Calculations and experiments).  Other beam dynamic issues.  Target energy deposition and beam sweeping.  Future studies and Plans.  Conclusions.

AAC February 4-6, 2003 Goals  Double the beam intensity on the antiproton production target (from 4E12 to 8E12).  Limit the length of the stacking cycles to 2 sec (including 5 Booster batches for NUMI).  Produce a bunch length on pbar target smaller than 1.5 nsec.  Limit the transverse emittances of the beam on target to 25 pi-mm-mrad or less.  All the above are expected to increase the current stacking rate by a factor of 2.0 (from present).

AAC February 4-6, 2003 Slip Stacking  Slip stacking has been demonstrated successfully at low intensities (0.8E12p) in the Main Injector.  The slip-stacking efficiency was 100% (no beam loss) but the final longitudinal emittance blow-up was a factor of 4 instead of a factor of 3 predicted from the simulations.  No longitudinal emittance blow-up has been observed during the slipping of the two batches.  The large emittance blow-up at recapture has been attributed to recapture time jitter.  Most of the LLRF tools needed for slip stacking have been developed.

AAC February 4-6, 2003 Slip Stacking Frequency Curves

AAC February 4-6, 2003 Slip Stacking Mountain Range Plot

AAC February 4-6, 2003 Slip Stacking DC (IBEAMM) and Bunch Beam(P1,3ING) Plots

AAC February 4-6, 2003 Longitudinal emittance evolution during the slip stacking Beam Experiment

AAC February 4-6, 2003 Intensity and position of the first bunch of the first batch during slip stacking

AAC February 4-6, 2003 Recaptured beam emittance vs. recaptured time delay (simulations)

AAC February 4-6, 2003 Beam Loading Compensation  Beam loading on the 53 MHz accelerating cavities is the biggest problem during slip stacking.  From ESME simulations is determined that at least a factor of 20 (26 db) reduction of the beam loading voltage is required.  We can achieve the beam loading compensation using a combination of feed-forward and feed-back.  A series of measurements/calculations is in progress to determine the feasibility of the beam loading compensation required.  We are currently applying feed-forward compensation with a gain of 20-25db during both proton and pbar coalescing (total beam intensities of 4E11 or less).

AAC February 4-6, 2003 Beam Loading Compensation (2)  The amount of feed-forward beam loading compensation that we were able to achieve during injection on the stacking cycles with total intensity of 4.2E12 was only 8 db (a factor of 2.5 reduction).  By changing the operation point of the final tube from class C to class A in one rf station we were able we were able to achieve a total feed- forward compensation of 17 db (a factor of 7 reduction).  It is estimated that we will be able to achieve feed-forward compensation of the order of 20db-22db at the present stacking intensities.  More studies and measurements are needed to the determine the limitations of the present solid state amplifiers at the slip stacking intensities.

AAC February 4-6, 2003 Time domain pictures of beam loading compensation on one rf station

AAC February 4-6, 2003 Time Domain Signals of rf station 1 with Normal Bias (Class C) and no FF Compensation.

AAC February 4-6, 2003 Time Domain Signals of rf station 1 with Regular Bias (Class C) and FF Compensation On.

AAC February 4-6, 2003 Time Domain signals for rf station 1 with Class A Bias and FF Compensation On

AAC February 4-6, 2003 Frequency Domain Pictures of Beam Loading Compensation

AAC February 4-6, 2003 Other Beam Dynamics Issues  Booster bunch rotations  Beam in the Booster has to be rotated in the longitudinal phase space before extraction in order to match the low voltage (62KV) buckets in MI  Booster longitudinal mode dampers have to work at the highest intensities  Transition crossing in MI  Transition crossing in MI is expected to blow-up the longitudinal emittance of the bunches by 30-35%.  Longitudinal Instabilities  Couple bunch instabilities can dilute the longitudinal emittance of the bunches and affect the bunch rotation at 120 GeV needed to reduce the final bunch length at the target.  A bunch by bunch longitudinal dampers is expected to be operational by the end of this year.  Transverse instabilities  Bunch by bunch horizontal and vertical dampers are being commissioned.

AAC February 4-6, 2003 Pbar Target Energy Deposition and Beam Sweeping  The antiproton production target should be able to take full advantage of the increased proton intensity.  No reduction in antiproton yield.  Prevent local melting and target damage.  Maintain a beam spot size at the target of 0.1mm with larger transverse emittances.  New target materials with same yield characteristics as the present target but better tolerances are being investigated.  A beam sweeping system that moves the targeted beam during the 1.6  sec beam pulse has been constructed.  Develop beam-line lattice changes that will reduce the beta functions at the target so that  =0.1 mm in both planes with proton emittances up to 25 pi-mm-mrad.

AAC February 4-6, 2003 Pbar Target Energy Deposition and Beam Sweeping (2)  Inconel 600 and 625 have already been tested with beam and compared with nickel 200. Inconel 686,718 and X-750 have been included in the target assembly and will be tested with beam during the first quarter of  The upstream target sweeping magnets have been installed in the tunnel and are ready to be tested. The downstream sweeping magnet is being completed and expected to be installed when the testing of the upstream magnets is finished.  Beta functions at the target will need to be reduced an additional factor of three. New optics solutions will be modeled and tested with beam during the first half of 2003 to identify possible aperture problems.

AAC February 4-6, 2003 Antiproton Yield and Peak Energy Deposition vs. Beam Size on Target

AAC February 4-6, 2003 Target Reduction yield studies for different materials MaterialSpot sizeStarting Yield Ending Yield Protons on target Yield reduction scaled to protons Nickel 200  xy = 0.15, x % Nickel 200  xy = 0.22, x % Inconel  600  xy = 0.15, x % Inconel  600  xy = 0.22, x % Inconel  625  xy = 0.22, x %

AAC February 4-6, 2003 Beam Sweeping Magnet

AAC February 4-6, 2003 Studies and Plans  Study the Booster bunch rotations at high intensities.  Further optimize the slip stacking curves and minimize the longitudinal emittance blow-up at recapture.  Try to accelerate the recaptured beam.  Slip stacked few bunches (7-9) at the highest per bunch intensity and accelerate through transition in MI.  Continue the beam loading measurements on the rf stations and determine the solid state amplifier limitations.  Trying running all rf stations from class C to class A.  Come up with a plan with the needed modifications for beam loading compensation.  Continue with the MI multi-batch high intensity studies and the damper commissioning.  Proceed with the testing of pbar target materials, the beam sweeping commissioning and the beam optics studies at the target region.

AAC February 4-6, 2003 Conclusions  Most of the tools required for slip stacking have been developed and the process has been demonstrated to work as expected at low beam currents.  A serious effort is under way in order to understand what is needed to compensate the beam loading in the 53 MHz cavities at large currents.  Both transverse and longitudinal dampers will be needed during the slip stacking cycles.  Material testing for pbar targets is progressing well.  Beam sweeping magnets are ready for testing with beam.