APARTMENT HOUSES CHÝNĚ Author of the slides: Ing. Miroslav Jindrák RD Rýmařov s.r.o. Case study no. 5 Leonardo da Vinci project no. CZ/06/B/F/PP-168007.

Slides:



Advertisements
Similar presentations
Plus energy house Pilisszentiván Hungary. Properties: -microgeneration technology -low energy building techniques -high energy production -low energy.
Advertisements

FURNITURE SALON Author of the slides: Andrzej Marynowicz, Opole University of Technology Case study no. 7 Leonardo da Vinci project no. CZ/06/B/F/PP
Durra Eco-Form Cabins Build your own home and move in within a week Fast, Simple and Affordable.
Doors. Design features Security Durability Thermal insulation Aesthetics Accessibilitycomfortable access for all »Access to letter box »Access for some.
Sound insulation materials and constructions Tsvetan Nedkov, Ivaylo Hristev UACG 2014 г.
Innovative New Technologies in Building & Construction.
Fastening technique Marc Willer ITW Befestigungssysteme GmbH 2 Marktpartner.
Roofing.
Walls Ron Gatepain constructionsite.
The MiTek Posi-Stud.
Building Methods Types of Structure.
Environmentally-friendly insulation systems made from natural wood fibres We care about your well-being.
Leonardo da vinci project Being active in building Passive homes: 1- Walls construction, 2- Building a passive house, blower door test, 3- Solar systems,
THERMAL INSULATION IN THE NEW ERA. INSULATION THICKNESS IN EUROPE ROOFS.
Hard to Treat Homes Bev Coombe Membership and Communications Manager.
Prefabricated Timber Frame Construction
Dry lining.
Design of steel structures under the aspect of fire protection measures TU BRAUNSCHWEIG iBMB Dr.-Ing. E. Richter Institute for Building Materials, Concrete.
FAMILY RESIDENTIAL Author of the slides: Dr. Robert Cvelbar +, Simon Brlek ++ Institute for Metal Constructions, Lokainvest Case study no. 2 Leonardo da.
TERME ZREČE, HOTEL DOBRAVA Author of the slides: Assoc.Prof.Dr. Miroslav Premrov, University of Maribor, Faculty of Civil Engineering Case study no. 8.
UNDER OFFER - An opportunity to purchase some easily accessible grazing land which is well fenced and provides excellent equestrian or amenity potential.
Fastening technique Marc Willer ITW Befestigungssysteme GmbH 2 Marktpartner.
IP CORSICA 2014 Final presentation Group 7. GROUP NR. 7! Krisztina – Denmark Jim – United Kingdom Audra – Lithuania Nicolas – Italy Sander – Estonia.
Sustainable Construction Methods
Acoustical Properties of Materials Chapter 8. Mehta, Scarborough, and Armpriest : Building Construction: Principles, Materials, and Systems © 2008 Pearson.
PLASTERBOARDS Plasterboard is a rigid flat sheet material which comprises of a core of gypsum plaster with the surfaces covered by stout paper. This covering.
R-Value? Refers to the efficiency of the insulation of a house Ratio of the temperature difference across an insulator and the heat flux.
Nicole C. Drabousky Pennsylvania State University Architectural Engineering Structural Option Spring 2006 Senior Thesis Presentation.
Unit 6/P6 – Timber Frame Construction Name ________________
Name ________________ Unit 6/P6 – Traditional Construction Most common foundation = strip Damp Proof Course 150mm above ground level External Walls are.
3D Panel Construction System
FLISA ROAD BRIDGE Author of the slides: Petr Kuklík, CTU in Prague Case study no. 11 Leonardo da Vinci project no. CZ/06/B/F/PP WP6 – Case Studies.
Topic Today’s Objective
Prefabricated elements Training presentation. Contents Product description Application in buildings Certification References.
Competency: Draw wall sections and details Objective: Analyze insulation and vapor barrier materials and construction.
Learning Outcome Lesson Objective
Introduction TopRung LLC is one of the leading construction building repair and building maintenance service company in Seattle.
 We have the perfect solution to rebuild and prevent damage from future Flood, Wind and Fire.  QBSI is an Australian based company supplying building.
Pitched Roof By PATEL ANKITKUMAR H.
Building construction Prepared by : Rall no : : Nayani Paril : Patel Nikunj : Parmar Mihir : Patel Adarsh : Patel Bhavin.
PEDESTRIAN BRIDGE RÁDLO Author of the slides: Petr Kuklík, CTU in Prague Case study no. 4 Leonardo da Vinci project no. CZ/06/B/F/PP WP6 – Case.
Secure Resources – Gyproc Plasterboard Apply Plaster Materials to Internal Backgrounds.
VIA / TCU 4th semester workshop S2016 CASE 2: Multistory Building VIA University CollegeTCU-VIA Workshop – S20161 A Quick Discovery of Construction in.
VIA / TCU 5th semester workshop A2016 CASE 3: Multistory Building VIA University CollegeTCU-VIA Workshop – A20161 Wall elements.
///. It is our business to tailor the building and industrial needs associated with energy efficiency in construction systems.
INFORMATION ABOUT: EUROPEAN FIRE CLASSIFICATION..
Concrete structures FOR BUILDINGS IN A CHANGING WORLD
Prefabricated Timber Frame Construction
CASE 2: Multistory Building
Insulation Dr. Qing Wang
Regulation and compliance with performance standards
Building Methods Types of Structure.
Secure Resources – Gyproc Plasterboard
Secure resources – gyproc plasterboard
International Building Materials and components
An Easy to Use Menu Type Approach for Determining the Fire Resistance of Wood Stud Area Separation Walls GORDON D. FELLOWS ____________________________________________.
INFORMATION ABOUT: EUROPEAN FIRE CLASSIFICATION.
Performance Based Design of a Steel Frame Hotel
Competency: Draw wall sections and details
FLATS Storey 5 Floor 4 Storey 4 Floor 3 Storey 3 Floor 2 Storey 2
Common Components of a Traditional Wood Framed Building
Ltd. “RV BLOKS” IDEA DESCRIPTION.
CASE 3: Multistory Building
Competency: Draw wall sections and details
BELGIUM COND’OR Batilook.
Knauf Insulation, d.o.o. Škofja Loka
TITLE OF THE PRESENTATION
BCAR & The Technical Guidance Documents Conference 2019 Part E: Sound
Queen Post Truss Queen post trusses are not common in modern construction but they are still used. The example on the right shows exposed queen post trusses.
Presentation transcript:

APARTMENT HOUSES CHÝNĚ Author of the slides: Ing. Miroslav Jindrák RD Rýmařov s.r.o. Case study no. 5 Leonardo da Vinci project no. CZ/06/B/F/PP WP6 – Case Studies PC 3 – A set of case studies

Content of slides Apartment houses Chýně The basic version in two designs Profile of the external wall Profile of the ceiling construction The ground plan Technical parameters Building Assembly Increase of fire resistance for bearing external walls Construction time of key delivery

Apartment houses Chýně Locality construction of 32 timber-based multistoried detached and terrace houses. Turn-key delivery including groundwork, house connections, ground completion and fencing.

The basic version in two designs The houses have two stories with two studio apartments. The basic version is delivered with a saddle roof with a roof inclination of 38 . RD 180/38 apartment houses are offered in the basic version in two designs: 6 dwelling units: - 6 dwelling units 69,03 m2 10 dwelling units: - 4 dwelling units 35,15 m2, - 4 dwelling units 37,50 m2, - 2 dwelling units 69,03 m2

Profile of the external wall 1. contact thermo facade 2. gypsum wood-fibre board 15 mm 3. mineral insulation 120 mm 4. gypsum wood-fibre board 12,5 mm 5. gypsum plasterboard 12,5 mm 6. frame construction 120 mm

Profile of the ceiling construction 1. anhydrite compound 55 mm 2. Rotaflex 25/20 TSPS Mirelon 5 mm 4. particle board 22 mm 5. mineral insulation ORSIL 120 mm 6. Lathing 30x x gypsum plasterboard 12,5 mm

The ground plan

Technical parameters Ground plan size16,96 x 10, 63 m Number of above-ground stories2 Number of dwelling units6 (10) Type of roof construction purlin system 38  Construction of external wallsframework Thermal resistance for external wallsR = 4,195 m 2 K W -1 Coef. of thermal transmittance for external wallsU = 0,229W m -2 K -1 External wall fire resistanceREI 90, REW 60 External wall airbone sound insulationR w 44 dB Impact sound insulation for ceiling with coveringL´ n,w = 52 dB Airbone sound insulation for flat to flat wallsR´ w = 59 dB

Building Assembly

Increase of fire resistance for bearing external walls REI 60 was required for wall exposed to external heat stress Walls were lined with boards MULTIPOR 600x390x80 firm product Xella, having increased the external wall fire resistance to REI 90

Increase of fire resistance for bearing external walls

Construction time of key delivery Groundwork: 14 days Upper timberwork: 67 days -> with a technological interval of 28 days for anhydride maturing Total costs for construction: 7,1 mil. CZK

Thank you for your attention!