Island Adventures: Insulating Unique and Unusual Structures Juvenile Detention Facility: Part 2 Baton Rouge, LA Presented by Rita A. Smith, AIA Russell.

Slides:



Advertisements
Similar presentations
Hallmark Southwest Corporation The Home of Craftsmanship Building Manufactured Homes Since 1977 at Manufacturing Facility in Loma Linda, CA. Hallmark Southwest.
Advertisements

Doors and Windows.
DOORS AND WINDOWS.
Exterior Window and Door Frames
Buildings and Structures 1
Liftslide. Welcome 1)With over two decades of experience behind our designs, the company has positioned itself as the forerunner in the use of European.
FVCC Fire Rescue Forcible Entry.
Closed Area Construction
Putting Houses on the Path to Lower Energy Consumption. Awareness and Long term planning helps to maximize energy opportunities.
Health Care Building Available for Sale! Immediate Delivery from our Bristol, IN plant. Call Don See Floor Plan and Specifications.
PARKVIEW APARTMENTS 20 Unit Rehabilitation & Site Work ISLA VISTA, CA. Joint Cities-County Affordable Housing Task Group October 23, 2008.
Carpentry Green Application 5. Key Lessons from Carpentry In Carpentry, we learned about: Tool and equipment use, safety, and maintenance Primary materials,
Forcible Entry By Randy Hart.
Installation Quick Guide AD400 Cylindrical 6/01/13 Doc #
PHOTO. NO.DATE: 01/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P CHURCH STREET OLIN.
Progress Report 12/13/11. Progress Schedule December 2011 Work Completed December: Installed Concrete topping on roof Rough In M&E East side screen wall.
MARIETTA MUNICIPAL COURT A presentation for MARIETTA CITY COUNCIL.
typical wood windows in India
Division 08-Openings ARCH 330 Fall Master Format OPENINGS Operation and Maintenance of Openings Schedules for Openings
Physical Security Principles for Today's Courts Malcolm Franklin Senior Manager, Office of Security California Administrative Office of the Courts.
Residential Construction Residential Doors Installation Guide Source: Carpentry & Building Construction Feirer & Feirer / Lowe’s How-To Library.
 Building Walls  Wood Framed Walls  Precast Concrete Walls  Steel Framed Walls  Sustainable Walls.
House Construction. Learning Standard 5. Construction Technologies Construction technology involves building structures in order to contain, shelter,
Chapter 4: Air Leakage Control: Materials and Techniques
Exterior Wall (Masonry)
Three Lines of Defense Presented by the Arapahoe County Sheriff’s Office.
Residential Construction Residential Doors *Source: (1) Carpentry & Building Construction Feirer & Freirer.
DOORS AND WINDOWS.
Residential Wall Systems. Building Walls Wood Framed Walls Precast Concrete Walls Steel Framed Walls Sustainable Walls.
1 ADA & ACCESSIBILITY Chapter ADA Accessibility -- Public restroom Public Restroom.
Architectural CAD I – IM230 Vocabulary. GROUP 3 Vocabulary.
111 Dr. Nihad Almughany University of Palestine Faculty of Applied Engineering and Urban Planning Dept. of Architecture 2nd Semester Building.
MAIN ENTRANCE SOUTH EAST VIEW NORTH EAST VIEW.
Architectural (Residential) Drafting DT 1100 Scales, Symbols: Floor Plan, Materials in Section, and Door/Window Symbols.
Demonstrating a Home Under Construction Purpose: To use your knowledge of the construction process and production USPs to influence the sales process and.
© OnCourse Learning. All Rights Reserved. Basic House Construction Learning Objectives  List the primary styles of residential architecture  Describe.
Chapter 23 Plumbing Systems. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify several.
INTD 54 other components. moldings cover, enhance and decorate a plain surface standing trim: fixed length—doors & windows.
Progress Photos Goodnoe Elementary School Additions and Renovations Project November 2013 Goodnoe Elementary School.
Current Floor Plan N. Marking C1 indicates that a load bearing steal beam is present at each end of the existing exterior wall which both need to stay.
Cost Cutting Workshop 10/29/2006. Overview Standardizing Across Neighborhoods This could save us the most money, up to appx $7-10k per unit. Architects.
Residential Construction Unit 4- Window and Doors Mr. Todzia.
111 Dr. Nihad Almughany University of Palestine Faculty of Applied Engineering and Urban Planning Dept. of Architecture 2nd Semester Building.
PowerPoint ® Presentation Unit 52 Thermal Insulation and Other Insulating Methods Thermal Insulation Exterior Insulation and Finish Systems (EIFS) Roof.
The Monitor 4000 Alarm provides the most cost effective, worry-free method of keeping backdoors secure during business hours…protecting your business,
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
May 10, 2015 Tecumseh State Correctional Institution.
Picking up from last week…. Fire stair layout Fire stair layout Due October 18 th Due October 18 th Assignment #1.
Orthographic Drawings
INSTALLATION DETAILS. Installation Details for Code Compliance Must be installed per manufacturer’s instructions Architects can provide construction details.
Administration Offices Proposed by: Wyatt Marvin and Mitch Sander.
WALK-IN COOLERS & FREEZERS All contents of this presentation © Master-Bilt Products a division of Standex International, Inc.
CON 4003 Construction Estimating Prof R. V. Locurcio.
Identifying Information: Building Exterior - 1 You observe damage to the frame on this exterior entry door. The door cannot be locked. LEVEL 3.
Product Presentation BSF70 Folding Door System
Major Steps In Building a SFR
Millwork A Guide to Doors.
Sketchbook assignment-part3
INTD 405 Modern Practices in Interior Design DOOR & WINDOW SCHEDULES
Millwork A Guide to Doors.
Building Construction I Sofia Sebastian 1
VINYL SIDING / CARPENTRY SECTION EXISTING CONDITION PHOTOS
INTD 405 Modern Practices in Interior Design PLANS
Building Construction I Sofia Sebastian 1
INTD 405 Modern Practices in Interior Design DOOR & WINDOW SCHEDULES
Q:\Pictures\Industrial\NWQ\Crescent IV\Crescent IV - pic for flyer.jpg
New White Lake Township Library
WINDOW REPLACEMENT PROJECT SECTION EXISTING CONDITION PHOTOS
The Edge Extreme Makeover.
® Folding, Sliding, and Swing Doors
Presentation transcript:

Island Adventures: Insulating Unique and Unusual Structures Juvenile Detention Facility: Part 2 Baton Rouge, LA Presented by Rita A. Smith, AIA Russell Callahan, PM The Jones Payne Group

Facility Uses

Treatment Plan

Detention Design Issues Detention Wings Before After

Detention Design Issues Detention Windows

Detention Design Issues Detention Windows Existing frames and interior security screens remained in place Exterior security bars removed, reconditioned and reinstalled New windows installed backwards from the outside to prevent popping off the clip-on stop and access the glazing screws Peerless used throughout project Milk glass

Window Design Issues Detail

Window Design Issues Detail Before After

Detention Construction Issues Detention Wings Close coordination with on-site staff aided efforts. 4 wings – One under construction at a time in order to rotate occupants into the other wings during construction. Useful changes during product ordering came about due to more opportunity to talk with guards. Some existing condition surprises during construction.

Windows with encased security bars Detention Construction Issues

Detention Wing Doors Detention Construction Issues BeforeAfter

Courtroom Design Issues Court West Windows Before After

Storefront Entry Doors Court Area Design Issues Before After

Design Concerns/Resolutions Detention windows tend to be steel construction, not sound tested. Specification for windows may include multiple types and manufacturers to accommodate building sections Gasketing prone to destruction Door hardware and wiring require close coordination. Able to use Peerless sound rated product Used existing security mesures and laminated glass, able to use one window manufacturer throughout. Gasketing and screws in detention behind security Left existing frames and security locks in place

Construction Types Lightweight T1-11 Design - Interior walls reinforced with new drywall Actual - Took off exterior and installed new plywood under the siding

Coordinating the Construction Close coordination for access to detention area Courtrooms always in use during daytime, had to provide variable shifts Facility used year round Staging design and construction activities Public Building Fire Laws