SHIELDING STUDIES FOR THE MUON COLLIDER TARGET. (From STUDY II to IDS120f geometries) NICHOLAS SOUCHLAS (BNL)‏ ‏ 1.

Slides:



Advertisements
Similar presentations
SUPERCONDUCTING SOLENOIDS - SHIELDING STUDIES 1. N. Souchlas BNL (Oct. 5, 2010)
Advertisements

IDS120j WITH/WITHOUT GAPS SH#4 AZIMUTHAL DPD DISTRIBUTION ANALYSIS Nicholas Souchlas, PBL (3/14/2012) 1.
Magnetic Configuration of the Muon Collider/ Neutrino Factory Target System Hisham Kamal Sayed, *1 H.G Kirk, 1 K.T. McDonald 2 1 Brookhaven National Laboratory,
Particle Production of a Carbon/Mercury Target System for the Intensity Frontier X. Ding, UCLA H.G. Kirk, BNL K.T. McDonald, Princeton Univ MAP Spring.
Operated by Brookhaven Science Associates for the U.S. Department of Energy A Pion Production and Capture System for a 4 MW Target Station X. Ding, D.
Pion capture and transport system for PRISM M. Yoshida Osaka Univ. 2005/8/28 NuFACT06 at UCI.
IDS120h: Be WINDOW DETAILED CALCULATION, SHIELDING VESSELS, RESULTS FOR DIFFERENT GLOBAL STEPS Nicholas Souchlas (9/20/2011) 1.
Energy Deposition of 4-MW Beam Power in a Mercury Jet Target Xiaoping Ding UCLA Target Studies Meeting, Feb. 9, 2010.
MC/NF TARGET SHIELDING STUDIES. NICHOLAS SOUCHLAS (10/29/2010)‏ 1.
ENERGY DEPOSITION IN HYBRID NbTi/Nb 3 Sn TRIPLET CONFIGURATIONS OF THE LHC PHASE I UPGRADE FermilabAccelerator Physics Center Nikolai Mokhov, Fermilab.
SHIELDING STUDIES FOR THE MUON COLLIDER TARGET NICHOLAS SOUCHLAS BNL Nov 30, 2010 ‏ 1.
KT McDonald Muon Collider 2011 June 28, The Target System Baseline K. McDonald Princeton U. (June 28, 2011) Muon Collider 2011 Telluride, CO More.
Above: Energy deposition in the superconducting magnet and the tungsten-carbide shield inside them. Approximately 2.4 MW must be dissipated in the shield.
May 17-19, 2000 Catalina Island, CA Neutrino Factory and Muon Collider Collaboration Meeting 1 Target Support Facility for a Solid Target Neutrino Production.
Energy Deposition of 4MW Beam Power in a Mercury Jet Target Xiaoping Ding UCLA Target Studies Mar. 9, 2010 (Update of talk on Feb. 9, 2010)
Harold G. Kirk Brookhaven National Laboratory Target System Update IDS-NF Plenary Meeting Arlington, VA October 18, 2011.
Harold G. Kirk Brookhaven National Laboratory Target Baseline IDS-NF Plenary CERN March 23-24, 2009.
IDS-NF Target Studies H. Kirk (BNL) July 8, 2009.
1 Comparison of Power Depositions X. Ding, D. B. Cline, UCLA H. Kirk, J. S. Berg, BNL Collaboration Meeting July 2, 2010.
Comparison of Power Deposition in SC1 Coil Xiaoping Ding UCLA Target Studies Jun. 29, 2010.
Power Deposition in SC1 Coil Xiaoping Ding UCLA Target Studies Apr. 20, 2010.
Above: Power deposition in the superconducting magnets and the tungsten-carbide + water shield inside them, according to a FLUKA simulation Approximately.
Above: On-axis field profiles of resistive, superconducting and all magnets, and bore-tube radius r = 7.5 (B/20T) −½ cm. Above: Hoop strain ε θ in resistive.
Operated by Brookhaven Science Associates for the U.S. Department of Energy Optimized Parameters for a Mercury Jet Target X. Ding, D. Cline, UCLA, Los.
Managed by UT-Battelle for the Department of Energy Review of NFMCC Studies 1 and 2: Target Support Facilities V.B. Graves Meeting on High Power Targets.
SUPERCONDUCTING SOLENOIDS - SHIELDING STUDIES 3. NICHOLAS SOUCHLAS (10/28/2010)‏
The Front End MAP Review Fermi National Accelerator Lab August 24-26, 2010 Harold G. Kirk Brookhaven National Laboratory.
IDS120h POWER DEPOSITION AND Hg POOL STUDIES Nicholas Souchlas (7/26/2011) 1.
Background comparison between 20 mrad and 2 mr crossings Takashi Maruyama SLAC Machine-Detector Interface Workshop SLAC January 6-8, 2005.
STUDY II: m1507 vs. m1510 IDS120f: m1507/MCNP vs. M1510/MCNP vs. FLUKA IDS120f vs. IDS20g GEOMETRY IDS90f: B10/B11 SHIELDING RING(S) STUDIES Nicholas Souchlas.
Front End Technologies Harold Kirk Brookhaven National Laboratory February 19, 2014.
Target and Absorbers L2 Manager: K McDonald, Princeton U March xx, 2013 Presenter’s Name | DOE Mini-Review of MAP (FNAL, March 4-6, 2013)1 Mission Target:
SUPERCONDUCTING SOLENOIDS - SHIELDING STUDIES 1..
Meson Productions for Target System with GA/HG Jet and IDS120h Configuration X. Ding (Presenter), D. Cline, UCLA H. Kirk, J.S. Berg, BNL Muon Accelerator.
KT McDonald MAP Winter Meeting (SLAC) December 5, Solid Target Options for an Intense Muon Source K. McDonald Princeton U. (December 5, 2014) MAP.
IDS120j WITHOUT GAPS AND WITH MAXIMUM SIZE GAPS ( aka ''NIGHTMARE'' CASE SCENARIO ) SC#4, SC#7 AZIMUTHAL DPD DISTRIBUTION ANALYSIS. Nicholas Souchlas,
IDS120h GEOMETRY WITH MODIFIED Hg POOL VESSEL. SIMULATIONS FOR 60%W+40%He SHIELDING (P12 'POINT') WITH STST SHIELDING VESSELS EFFECTS OF Be WINDOW WATER.
KT McDonald MAP Tech Board Meeting Oct 20, The MAP Targetry Program in FY11 and FY12 K. McDonald Princeton U. (Oct 20, 2011) MAP Technical Board.
DEPOSITED POWER STUDIES FOR THE MC/NF TARGET STATION. Nicholas Souchlas (PBL) (MAP CONFERENCE SLAC 2012) 1 DEPOSITED POWER STUDIES FOR THE MC/NF TARGET.
1 Energy Deposition of 4MW Beam Power in a Mercury Jet Target X. Ding, D. B. Cline UCLA H. Kirk, J. S. Berg BNL The International Design Study for the.
IDS120j WITH GAPS SC#3 AZIMUTHAL DPD DISTRIBUTION ANALYSIS WITH MAX GAPS SC#3, SC#4 AZIMUTHAL DPD DISTRIBUTION ANALYSIS, DP AND SC TOTAL DP WITH VARYING.
IDS120h GEOMETRY WITH MODIFIED Hg POOL VESSEL. SIMULATIONS FOR 60%W+40%He SHIELDING (P12 'POINT') WITH STST SHIELDING VESSELS. BP#1(STST/W), SH#1, BeWindow,SC#8.
KT McDonald MAP Front End Meeting March 3, Finalizing the C- and Hg-Target Configurations for 6.75-GeV Proton Beams Present studies are for a carbon.
J. Pasternak First Ideas on the Design of the Beam Transport and the Final Focus for the NF Target J. Pasternak, Imperial College London / RAL STFC ,
IDS120j WITHOUT RESISTIVE MAGNETS: NEW Hg MODULE mars1510 ( DESKTOP ) vs. mars1512 ( PRINCETON CLUSTER ) Nicholas Souchlas, PBL (3/28/2012) 1.
Particle Production of Carbon Target with 20Tto2T5m Configuration at 6.75 GeV (Updated) X. Ding, UCLA Target Studies April 3, /3/14.
Beam Dump for Carbon Target with IDS120h Configuration at 6.75 GeV (Updated) X. Ding, UCLA Target Studies Jan. 24, /24/14.
Particle Production with Carbon Target and IDS120j Configuration at 3 GeV (update) X. Ding, UCLA Target Studies Nov. 14, /14/13.
Meson Production of Carbon Target at 3 GeV X. Ding, UCLA Target Studies 17/18/13.
Carbon Target Design and Optimization for an Intense Muon Source X. Ding, UCLA H.G. Kirk, BNL K.T. McDonald, Princeton Univ MAP Winter Collaboration.
IDS120j WITHOUT RESISTIVE MAGNETS ( 20 cm GAPS AND 15.8 g/cc W BEADS ) AZIMUTHAL DPD DISTRIBUTION STUDIES FOR: BP#1, SH#1, SHVS#1/LFL, SC#1+SC#2, BeWind.
Multiprocessing/MARS15(2012)/Princeton Cluster (IDS120j w/t Resistive Magnets: New Hg Module) X. Ding UCLA (4/11/2013)
IDS120j WITHOUT RESISTIVE MAGNETS MODIFYING Hg MODULE Nicholas Souchlas, PBL (11/1/2012) 1.
Proton Driver – Target Station Interfaces Keith Gollwitzer Fermilab Wednesday May 28, 2014 MAP 2014 Spring Meeting.
IDS120j WITH AND WITHOUT RESISTIVE MAGNETS PION AND MUON STUDIES WITHIN TAPER REGION, III ( 20 cm GAPS BETWEEN CRYOSTATS ) Nicholas Souchlas, PBL (9/4/2012)
Meson Production at Low Proton Beam Energy (Update) X. Ding, UCLA Target Studies May 9, /9/113.
IDS120i GEOMETRY. SIMULATIONS FOR 60%W+40%He SHIELDING WITH STST SHIELDING VESSELS. Hg vs. Ga DEPOSITED POWER DISTRIBUTION. (using Ding's optimized parameters)
IDS120j WITHOUT RESISTIVE MAGNETS SEMGENTATION STUDIES FOR BEAM PIPE BEYOND FIRST CRYOSTAT ( 20 cm GAPS AND 15.8 g/cc W BEADS ) Nicholas Souchlas, PBL.
IDS120j WITHOUT RESISTIVE MAGNETS SEMGENTATION STUDIES FOR BP#2 WITHIN FIRST CRYOSTAT AND RIGHT FLANGE OF Hg POOL INNER VESSEL ( 20 cm GAPS AND 15.8 g/cc.
Ids120h_side. ids120h_top ids120h_iso ids120h_end.
Horn and Solenoid options in Neutrino Factory M. Yoshida, Osaka Univ. NuFact08, Valencia June 30th, A brief review of pion capture scheme in NuFact,
BNL solenoid capture workshop: magnet challenges are not trivial Summarized by Tengming Shen
SHIELDING STUDIES FOR IDS80 (NO IRON PLUG/YOKE), ADDING SHIELDING IN 75 TO 80 cm (WC/H 2 O, B, Cd). NICHOLAS SOUCHLAS (BNL) Dec. 14, 2010‏ ‏ 1.
ENERGY FLOW AND DEPOSITION IN A 4-MW MUON-COLLIDER TARGET SYSTEM
IDS120h: PROTON P0-P14 TRAJECTORY FOOTPRINT
X. Ding, UCLA MAP Spring 2014 Meeting May 2014 Fermilab
Horn and Solenoid Options in Neutrino Factory
IDS120j WITHOUT RESISTIVE MAGNETS: NEW Hg MODULE
1 Nicholas Souchlas, PBL (11/15/2011)
1 Nicholas Souchlas (PBL) (MAP CONFERENCE SLAC 2012)
Presentation transcript:

SHIELDING STUDIES FOR THE MUON COLLIDER TARGET. (From STUDY II to IDS120f geometries) NICHOLAS SOUCHLAS (BNL)‏ ‏ 1

MUON COLLIDER TARGET STATION COMPONENTS 1. PROJECTILES (PROTON BEAM). 2. TARGET (MERCURY JET). 3. SUPERCONDUCTING COILS (SC) FOR UP TO 14 T MAGNETIC FIELD AROUND INTERACTION AREA (NbSn, NbTi). 4. RESISTIVE COILS FOR ADDITIONAL 6 T MAGNETIC FIELD SO THAT B~20 T AROUND THE INTERACTION AREA. 5. BEAM PIPE (STST Stainless Steel). 6. CRYOGENIC COOLING FOR THE SC SOLENOIDS. 7. MERCURY COLLECTING TANK (BEAM DUMP) AND REMOVAL SYSTEM. 8. SHIELDING CONFIGURATIONS (WC BEADS+H 2 O). 2

TARGET REQUIREMENTS/ISSUES MAGNETIC FIELD OF 20 T AT TARGET. MINIMIZE DEMAND ON CRYOGENIC OPERATIONS. AVOID QUENCHING. RADIATION DAMAGE. STRUCTURAL/MECHANICAL LIMITS FOR SUPERCONDUCTING COILS. SHIELDING MATERIAL. RESULTS OF DEPOSITED ENERGY AND PEAK VALUES FOR DIFFERENT GEOMETRIES WILL BE PRESENTED (MARS, MARS+MCNP). MCNP CROSS SECTION LIBRARIES USED FOR A MORE DETAIL STUDY OF LOW ENERGY NEUTRONS (<0.1 MeV). 3

Energy deposition from MARS, MARS+MCNP. STUDY II GEOMETRY. SHIELDING: 80%WC+20% H 2 O 4MW proton beam. Initially E=24 GeV, GAUSSIAN PROFILE: σ x =σ y =0.15 cm. Now E=8 GeV, GAUSSIAN PROFILE: σ x =σ y =0.12 cm. 4

STUDY II SOLENOID GEOMETRY, 13 SUPERCODUCTIN COILS (SC) SC#1 -120<z<57.8 cm R in =63.3 cm R out =127.8 cm SC#2 67.8<z<140.7 cm R in =68.6 cm R out =101.1 cm SC# cm (TOTAL # SC=13)‏ 5 SHIELDING SC# 2-13 SC#1 IRON PLUG RESISTIVE COILS

DEPOSITED ENERGY WITH 24 GeV AND 8 GeV BEAM From 24 GeV to 8 GeV, and from a more detail treatment of low energy neutrons: from ~14 kW to ~38 kW power in SC1 and from ~29 kW to 50 kW in total power GeV 8 GeV MARS MARS+MCNP MARS MARS WITH 0.1 MeV DEFAULT NEUTRON ENERGY CUTOFF VS. MARS+MCNP WITH MeV NEUTRON ENERGY CUTOFF. ENERGY DEPOSITED IN SOLENOIDS IN kW.

OFF/ON SHIELDING, DIFFERENT NEUTRON ENERGY CUTOFFS. 7 SAME RESULTS FOR SC#2-13 High energy neutrons are a problem even with shielding material. WITHOUT SHIELDING WITH SHIELDING

60% WC + 40% H 2 O IS A MORE REALISTIC PACKING FRACTION FOR SHIELDING MATERIAL. 8 STUDY II PACKING CURRENT STUDIES PACKING SC#1 SC#2-13 TOTAL

9 REPLACING RESISTIVE MAGNET WITH SHIELDING MATERIAL (80%WC+20% H 2 O) REDUCES DEPOSITED ENERGY IN SC#1 FROM ~38 kW TO ~13 kW (A FACTOR OF ~3). (MARS+MCNP WITH NEUTRON ENERGY CUTOFF OF MeV)

IDS80 (IR=80 cm) TO PROVIDE MORE SPACE FOR SHIELDING, ESPECIALLY FOR SOLENOIDS AROUND THE INTERACTION AREA. SHIELDING:60%WC+40% H 2 O 4MW proton beam. PROTONS ENERGY E=8 GeV. GAUSSIAN PROFILE: σ x =σ y =0.12 cm. 10

11 STUDY II VS. IDS80 SOLENOID GEOMETRY From 63.3 cm (SC#1) to 80 cm (SC#1-10) inner radius for solenoids around target area: more space for shielding. IDS80: SC# <z<345 cm R in =80.0 cm R out =100 (1-4)/115 (5)/97 (6)/93(7-9)/87(10)cm SC# cm R out =82.0-->54 cm SC# <z<1795 cm R in =45 cm R out =48 cm (TOTAL # SC=26)‏ ADDITIONAL SHIELDING

MARS+MCNP(NEUTRON ENERGY CUTOFF MeV) 60%WC+40% H 2 O SHIELDING STUDY II IDS80 SC#1: 42.5 kW >SC#1-5: 2.4 kW SC#1-13: 58.1 kW >SC#1-26: 3.4 kW 12

DETAIL STUDY OF IDS80 WITH IRON PLUG (MARS+MCNP, MeV NEUTRON ENERGY)‏ RS#1 RS#2 RS#3 BP#1BP#2 BP#3 SH#1 SH#2 SH#3 SH#4 SC#1-5 SC#6-10SC#11-15SC#

ENERGY DEPOSITED IN RESISTIVE COILS (RS#), BEAM PIPE (BP#), IRON PLUG (IP#). ENERGY DEPOSITED IN SC SOLENOIDS (SC#), SHIELDING (SH#)

ENERGY DEPOSITED IN OTHER PARTS AND TOTALS. ABOUT 80% OF THE 4 MW IS ACCOUNDED FOR

SC3: 4.15 kW TOTAL: 5.69 kW Peak SC3: 0.42 mW/gr 16 IDS80f GEOMETRY (Dr. Bob Weggel) IDS80 GEOMETRY SC#1-5: 2.6 kW TOTAL: 3.47 kW Peak SC5: 0.36 mW/gr

IDS90f-IDS120f GEOMETRIES:ENERGY DEPOSITION (kW), PEAK VALUES (mW/gr) (SC#1-9: NbSn, SC#10-19:NbTi). 17 SC3: 0.26 SC5: 0.19 TOTAL: 0.97 Peak SC3: 0.03 SC7: 0.07 SC14: 0.08 SC3: 0.49 SC5: 0.20 TOTAL: 1.14 Peak SC3: 0.03 SC5: 0.05 SC12/19 : 0.09 IDS100f IDS110f IDS120f SC3: 1.01 TOTAL: 1.41 Peak SC3: 0.08 SC9: 0.05 SC10: 0.10 SC11: 0.04 IDS90f SC3: 2.07 TOTAL: 2.45 Peak SC3: 0.15 SC10: 0.07 (Dr. Bob Weggel)

IDS80f-IDS120f GEOMETRIES:SC3 PEAK VALUES (mW/gr) (semi-log scale). 18 FROM ITER peak DE ≤ 0.15 mW/gr IDS90f

IDS80f-IDS120f GEOMETRIES:TOTAL ENERGY IN SOLENOIDS (kW) (semi-log scale). 19

20 IDS100f GEOMETRY: FOR THE FIRST 9 EVENTS Black=p, Green=n, Red/Blue=π ±, Orange/Turquoise=e ±, Gray=γ.

Energy deposition from: MARS+MCNP (400K EVENTS ) AND FLUKA (100K EVENTS). IDS120f GEOMETRY. SHIELDING: 60%WC+40% H 2 O 4MW proton beam. E=8 GeV, GAUSSIAN PROFILE: σ x =σ y =0.12 cm. 21

22 From John Back (FLUKA) 2/8/2011 MARS+MCNP SC3: 0.26 kW SC5: 0.19 kW TOTAL:0.97 kW

23 From John Back (FLUKA) 2/8/2011 MARS+MCNP Peak SC3: 0.03 mW/gr SC7: 0.07 mW/gr SC14: 0.08 mW/gr

ENERGY (IN kW) DEPOSITED IN OTHER PARTS AND TOTALS. 24

CONCLUSIONS. Low energy neutrons require detail study provided by MCNP. High energy neutrons are a problem even with the shielding material. High Z material is required and as much as possible. Additional space to accommodate access to different parts of the target station needed (GEOMETRIES WITHOUT IRON PLUG/YOKE). Additional space for shielding material necessary for solenoids especially around the interaction area(IR≥90 cm GEOMETRIES TO REACH ITER CRITERION OF 0.15 mW/gr PEAK ENERGY DENSITY ). STUDY II geometry~ 58.1 kW in SC solenoids, 5.5 mW/gr peak values. IDS120f geometry: <1kW in SC solenoids, <0.08 mW/gr peak values. Tolerance for additional necessary components in target station. 25

2626 MANY THANKS TO THE PEOPLE BEHIND THIS WORK: Dr. Harold Kirk, Dr. Kirk McDonald, Dr. Xiaoping Ding, Dr. Bob Weggel, Dr. Stephen Kahn, Dr. Richard Fernow, Dr. Scott Berg.

BACKUP SLIDES 2424

NO SHIELDING, DIFFERENT NEUTRON ENERGY CUTOFFS. 2525

2525

80%WC+20%H 2 O SHIELDING, DIFFERENT NEUTRON ENERGY CUTOFFS. 2727

2828

2929

3030

ENERGY DEPOSITED FOR DIFFERENT COMPOSITIONS OF THE SHIELDING ( x WC+(1-x) H 2 O )‏ 3131

DEPOSITED ENERGY BY REMOVING THE MAGNETIC FIELD, USING TWO WAYS: (4=F, B≠0) (4=T, B=0) 3232

DEPOSITED ENERGY WHEN RESISITIVE COIL IS REPLACED BY SHIELDING MATERIAL. 3

OFF/ON SHIELDING, DIFFERENT NEUTRON ENERGY CUTOFFS. 8 High energy neutrons are a problem even with shielding material.

Energy deposition from MARS+MCNP. ( MeV NEUTRON ENERGY CUTOFF). IDS80 GEOMETRY WITHOUT IRON PLUG AND YOKE MATERIAL (TO ACCOMODATE ACCESS TO DIFFERENT PARTS OF THE TARGET STATION). SHIELDING (60%WC+40% H 2 O). 4MW proton beam. PROTONS ENERGY E=8 GeV. GAUSSIAN PROFILE: σ x =σ y =0.12 cm. 17

IDS80 GEOMETRY WITH AND WITHOUT IRON PLUG AND YOKE. NEW: SC# <z<345 cm R in =80.0 cm R out =140 (1)/160 (2,3)/115 (5-6)/108(7) cm(NbSn) SC# <z<667 cm R in =72/63/54 cm R out =97.0/83/69 cm (NbTi)‏ SC# <z<1090 cm R in =45 cm R out =51 cm (NbTi) SC# <z<1090 cm R in =45 cm R out =49 cm (NbTi) (TOTAL # SC=21)‏ 18

ENERGY DEPOSITED IN SC SOLENOIDS (SC#), SHIELDING (SH#). ENERGY DEPOSITED IN RESISITVE SOLENOIDS (RS#), BEAM PIPE(BP#). 19

ENERGY DEPOSITED IN OTHER PARTS AND TOTALS: WITH IRON PLUG WITHOUT IRON PLUG/YOKE SHIELDING MATERIAL, RESISITVE COILS, BEAM PIPE, Be WINDOW, MERCURY TARGET AND POOL: ABOUT SAME ENERGY FOR BOTH CASES. 20