A N DY Status Commissioning with colliding beams (p  +p  at  s=500 GeV) L.C.Bland, for AnDY 8 March 2011 Time Meeting, BNL.

Slides:



Advertisements
Similar presentations
Measuring the Neutron and 3 He Spin Structure at Low Q 2 Vincent Sulkosky for the JLab Hall A Collaboration College of William and Mary, Williamsburg VA.
Advertisements

Measurement of Forward Jet A N at AnDY arXiv: Akio Ogawa Brookhaven National Lab 2013 June 25.
ATLAS Tile Calorimeter Performance Henric Wilkens (CERN), on behalf of the ATLAS collaboration.
» Drell RHIC « Oleg Eyser ECT* Workshop on Drell Yan Physics and the Structure of Hadrons May 21-25, 2012, Trento, Italy.
PHENIX local RUN9 RHIC meeting Manabu Togawa for the PHENIX 1.
J. Leonard, U. Wisconsin 1 Commissioning the Trigger of the CMS Experiment at the CERN Large Hadron Collider Jessica L. Leonard Real-Time Conference Lisbon,
The performance of LHCf calorimeter was tested at CERN SPS in For electron of GeV, the energy resolution is < 5% and the position resolution.
The Design of MINER  A Howard Budd University of Rochester August, 2004.
The LHCf experiment Hiroaki MENJO INFN Firenze on behalf for the LHCf collaboration at 29 March 2010, MC4LHC.
M.Gallinaro, ``Innovative Particle and Radiation Detectors’’, Siena, October slide 1 The CDF MiniPlug Calorimeter Forward Physics Conceptual.
Prototype Mechanical / optical considerations 1.Current LED system performance 2.New APD / Fiber /Strong Back integration scheme.
Mar RHIC Planning Meeting Tuesday (Mar. 1) 12pm - Sun (Mar. 6) 8pm: 128 hours Data Taking time: 39.5 hours = ~84% Beam time with collisions (including.
A N DY Trigger and DAQ System A N DY Review Chris Perkins UC Berkeley/Space Sciences Laboratory Stony Brook University 11/08/2011.
Measurement of Forward Jet Production in polarized pp collisions at √s=500 GeV L. Nogach, IHEP (Protvino) for A N DY The 20th International Symposium on.
Status of EIC Calorimeter R&D at BNL EIC Detector R&D Committee Meeting January 13, 2014 S.Boose, J.Haggerty, E.Kistenev, E,Mannel, S.Stoll, C.Woody PHENIX.
Approved Plots from CMS First Beam Runs 2-October-2008.
PHENIX Status, 2/22/11 VTX commissioning on beam Local polarimeter in service 9.6% in blue, -16.6% Residual transverse component for longitudinal beam.
Polarimetry of Proton Beams at RHIC A.Bazilevsky Summer Students Lectures June 17, 2010.
Status of W analysis in PHENIX Central Arm Kensuke Okada (RBRC) For the PHENIX collaboration RHIC Spin Collaboration meeting November 21, /21/20091K.Okada.
PHOBOS TOF Construction Status
AHCAL Electronics. Status Commissioning and Integration Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 12th, 2010.
Monitoring system of the LHCb electromagnetic calorimeter NEC’2007, Varna, Bulgaria Ivan Korolko (ITEP Moscow)
A N DY RHIC Run-12 Status/Proposed Goals L.C. Bland, BNL RHIC Spin Collaboration 13 Jan 2012.
A N DY Status Commissioning with colliding beams (p  +p  at  s=500 GeV) L.C.Bland, for AnDY 5 April 2011 Time Meeting, BNL.
Experimental background at the presence of pressure rise in RHIC Angelika Drees, Ubaldo Iriso-Ariz RHIC How to measure collision rates Vacuum and collision.
Future Beam Test Plans of the GLD Calorimeter Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
1 Prototype Calibration System for Forward Hadron Calorimeter L. Almeida, M. Baarmand, L. Caraway, M. Hohlmann, T. Qureshi, I. Vodopianov FLORIDA TECH.
PHENIX Local Polarimeter PSTP 2007 at BNL September 11, 2007 Yuji Goto (RIKEN/RBRC)
Calibration of the CMS Electromagnetic Calorimeter with first LHC data
Stephen Trentalange UCLA DIS04 1 Inclusive Jet Asymmetries from STAR Analysis Update Stephen Trentalange for the STAR Collaboration.
A Proposal for Run-11 AnDY L.C. Bland, for AnDY 1 March 2011 … preceded by some preliminary reminders about AnDY goals.
Supervisor: Samir Arfaoui By: Fatma Helal Sawy
08-June-2006 / Mayda M. VelascoCALOR Chicago1 Initial Calibration for the CMS Hadronic Calorimeter Barrel Mayda M. Velasco Northwestern University.
The Electromagnetic Calorimeter – 2005 Operation J. Sowinski for the Collaboration and the Builders Indiana Univ. Michigan State Univ. ANL MIT BNL Penn.
LHCf Report Takashi SAKO for the LHCf Collaboration 18-Dec-2009 CERN Main Auditorium.
R&D Studies of a Lead-Scintillating Fiber Calorimeter as a STAR Forward Detector Prashanth Shanmuganathan (for FCal group at STAR)  Physics and R&D goals.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
Oct 6, 2008Amaresh Datta (UMass) 1 Double-Longitudinal Spin Asymmetry in Non-identified Charged Hadron Production at pp Collision at √s = 62.4 GeV at Amaresh.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
Luminosity Monitoring Issues  ZDC  what’s the advantage?  problems  BBC  can they do it? A. Drees QCD critical point workshop, Mar
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
4/10/20121 A N DY Status Commissioning with colliding beams L.C.Bland, for AnDY 10 April 2012 Time Meeting, BNL.
Nantes — 2008, July Analysis of results from EmCal beam test at CERN PS (and SPS) energies P. La Rocca & F. Riggi University & INFN Catania University.
Fuji Test Beam Line commissioning Y.Sudo Univ. of Tsukuba.
From the Standard Model to Discoveries - Physics with the CMS Experiment at the Dawn of the LHC Era Dimitri Bourilkov University of Florida CMS Collaboration.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
A N DY Status Commissioning with colliding beams (p  +p  at  s=500 GeV) L.C.Bland, for AnDY 22 February 2011 Time Meeting, BNL.
4/17/20121 A N DY Status Commissioning with colliding beams L.C.Bland, for AnDY 17 April 2012 Time Meeting, BNL.
A N DY A 3-year program to establish requirements for forward Drell-Yan production for future STAR/PHENIX upgrades, and to measure the analyzing power.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Proton Polarimetry Proton polarimeter reactions RHIC polarimeters.
Inclusive cross section and single transverse-spin asymmetry of very forward neutron production at PHENIX Spin2012 in Dubna September 17 th, 2012 Yuji.
Overview of A N DY L.C.Bland Brookhaven National Laboratory BNL Review of the A N DY Proposal 30 March 2012.
A N DY Status Commissioning with colliding beams L.C.Bland, for AnDY 27 March 2012 Time Meeting, BNL.
RHIC pC Polarimeters in Run9: Performance and Issues A.Bazilevsky for the RHIC CNI Group Polarimetry Worshop BNL, July 31, 2009.
A N DY Status Commissioning with colliding beams (p  +p  at  s=500 GeV) L.C.Bland, for AnDY 19 April 2011 Time Meeting, BNL.
SHIP calorimeters at test beam I. KorolkoFebruary 2016.
1 Local Polarimetry for Proton Beams with the STAR Beam Beam Counters Joanna Kiryluk Massachusetts Institute of Technology for the STAR Collaboration SPIN2004.
Simulation and reconstruction of CLAS12 Electromagnetic Calorimeter in GSIM12 S. Stepanyan (JLAB), N. Dashyan (YerPhI) CLAS12 Detector workshop, February.
Future Beam Test Plans of the Calorimeter Group Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
RHIC Status Haixin Huang Time Meeting 01/25/2011.
CMS ECAL Calibration and Test Beam Results
Sergey Abrahamyan Yerevan Physics Institute APEX collaboration
Example of DAQ Trigger issues for the SoLID experiment
Status report Minjung Kim
Kazuya Aoki For the PHENIX Collaborations. Kyoto Univ. / RIKEN
Transverse Spin Physics at ANDY
Zhiwen Zhao,UVa for EC group
Presentation transcript:

A N DY Status Commissioning with colliding beams (p  +p  at  s=500 GeV) L.C.Bland, for AnDY 8 March 2011 Time Meeting, BNL

5/27/20162 Gain Monitoring for Hadron Calorimeter Fast current pulser (from Berkeley) and Blue Nichia light-emitting diodes (LED) drive fiber optics to distribute fast light pulses to individual detectors. Used LED system to measure gain curves from each HCal PMT prior to start of run 11. Use LED system as continuous gain monitor for cosmic rays and collisions. g=g 0 (V/V 0 ) a

5/27/20163 HCal Gain Change During Access Gain adjustment to enable jet physics to large x F at  s=500 GeV Choose target to be 60% of gain used for day<11061 jet trigger. Used measured gain curves for each PMT. Confirmed gain change with LED system.

5/27/20164 Effect of HCal Gain Change Before Gain Change After Gain Change  Ready for jet physics to large x F at  s = 500 GeV 107 ns before trigger 107 ns after trigger

5/27/20165 ZDC Response ZDC response (summed over three modules) to different triggers shows interesting biases. ZDC trigger is still required to be commissioned for local polarimetry ZDC shower maximum detector is mostly in working order.

5/27/20166 ZDC Shower Maximum Detector jet trigger Blue vertical strips Blue horizontal strips Yellow vertical strips Yellow horizontal strips

5/27/20167 ZDC SMD Events Select events that have  Q>250 and Q 2 >10 (middle module) for Yellow-facing ZDC Make event display by having vertical axis correspond to ADC value and horizontal axis correspond to detector ID. Showers look reasonable; double checks of mapping still required Next step is to trigger on ZDC for local polarimetry, using bunch counter to distinguish single-beam backgrounds from collisions.

5/27/20168 Integrated Luminosity Estimate to Date Presently, no accidentals correction (found to be large for ZDC). Singles rates from BBC are now scaled, following access. Requires calibration of effective cross section for BBC via vernier scan. Jet analyzing power measurement sets goal of 10 / pb for run 11. Establishing luminosity capability in run 11 is important for Drell Yan attempt in runs 12,13 (150 / pb in each run)

5/27/20169 Issues and Plans Issues Resolve a few remaining single-channel issues We are in “production” with a jet trigger >250M jet events recorded. In coming week… Complete ECal gain matching Commission ZDC trigger for local polarimetry. Commission scaler system for local polarimetry. Increase per bunch intensity for IP2 bump removal? Remove beam crossing angle at IP2?

5/27/ Backup

5/27/ Schematic of detector for Run-11 Equipment in place: HCal is two existing 9x12 modules from E864 (NIM406,227) ECal are two small lead-glass modules from BigCal at JLab BBC (from PHOBOS) and ZDC Preshower is newly constructed scintillator arrays Goals: Establish impact of 3IR operation on PHENIX/STAR luminosity Calibrate HCal relative gain via cosmic-ray  absolute energy scale via ,K S … Measure hadronic backgrounds to benchmark simulations Measure jet analyzing power (L int ~10 / pb, P=50%)

5/27/ IP2 in January, 2011 Run-11 Staging of A N DY See for pictures of progresshttp://hena.lbl.gov/IP2/Business/status/<date Left/right symmetric HCal Left/right symmetric ECal Left/right symmetric preshower Trigger/DAQ electronics Blue-facing BBC Beryllium vacuum pipe